HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
Dear Sir:
DATE: 3 2 Zal Z
RE: COMPLETION OFC4,Lk-i,C-%-
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in .order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by Lia...se...—k 4w d-As
and by their subcontractors as indicated by signatures below.
WORK COMPLETED
"I_ei
WARRANTY DATE
Owner: z-ra l�UJJ/'I"s Contractor: L..,'4,"6,,.L s
Phone Num�Lber:'713 _S 9 Y'3797 Phone Number:e/7 io(2f4 mom'
Address: % y3 f s H 6 5 Address: 75-f. A' �..b([ oe_
7Ga�-2-
_
Signature: Signature:
ACCEPTANCE/APPROVAL
i y Repres nt tive
21 ��
ity Engine r
Revised 1,W107
LAT FILEp
FFAITE ESAATS FILED
EMP OLANKET ESMT Fq.EO
N ESMTffi NEEDED
iZS
cictn�t 0, 17