HomeMy WebLinkAboutWater and Sewer Report08/28/08 2:54 PM Page 3 FROM :JF FONTR!t4E FAX NO. :19037297310 '. I Aug. 26 2008 11: 52AM P2 . _ .. _ .. _ -· Exhibit A Water System Flow T~t)Re_nort I Datt: lnJy 16, 2008 \ W•tcr System Owner: Wdltoni 8podal UdJftr·JMm:Mt I Dcvelopmcm Prajeot: Flow Tat Lammon: .·· ", ' .. ~ ... . ' . Nozzle 81,-,e (in.): Pitot Reading ·(psi); 5$' FloWl'8M (gpm): U~ computed '•bdirilloQ I I &.9 -' :ate fonn.ula: Q~9:·84cd2-p112 c-dfao&nrgc'coet: I d • orlfioe ir.le ~~ p:-= pifoJ-p~Tw (palY Preuuro Guagc Lo<iation: tel Sa ••• Stade (psi); 61 --Residual (pai): ____ 45 ---Report prepared by: P~W<A =~ ,,_, Othm'a preacmt: _·Stm!.....__c __ • __ ,....,--.. __ _ 800 'd 09Gl 069 6L6 ·oN XV;l I Note.-111/s jlo1~ t•~r (Ind 1·1ptm 111•1-. ~d I~ QQCOrdan~ with N:l!PA 29/. . / ! 1·003 · N~o8113M oiAi?o~ . -.... ~·i~Lf5' nd or:£~ OH i soc~-u'1i nt,c 1 "'T PROPOSED SANITARY SEWER LINE FOR LOT 7, BLOCK ONE AND ALL OF BLOCK TWO ROCK PRAIRIE WEST BUSINESS PARK COLLEGE STATION, BRAZOS COUNTY, TEXAS JOB NO. 000347-4080 AUGUST 2008 Eight inch sewer mains will be installed throughout the proposed that will connect to existing offsite sanitary sewer lines. The 5 lots will be serviced by proposed 8" sanitary sewer along Rock Prairie Road W. the 919 feet of 8" SDR wi II have a capacity (80% full) of 0.506 ft3/s. The five lots will produce less than 0.506 ft3/s at peak flow even at a rate of 0.045 peak flow. Details are shown in the attached table. Adams, Taggart and Associates 2551 Texas Avenue South Ste. A College Station, Texas 77840 Phone: (979) 693-5359 Fax: (979) 693-4243 ~~-\~003 \ CZ/26/ DfS 3 :3is Cc, 1 "'T Sewer Size Calculations Daily Wastewater Flow per lot Total Number of Lots Average Daily Wastewater Flow Peaking Factor Peak Daily Wastewater Flow I nflitration Total Wastewater Flow Total Wastewater Flow Total Wastewater Flow Slope at Collection Point Diameter Manning's n Capacity Capacity (80% Full) Total Wastewater Flow Capacity > Total Flow References: OK 100 gal/day/lot 5 lots 500 gal/day 4 2000 gal/day 27000 gal/day 29000 gal/day 20.14 gal/min 0.045 ft3/s 0.009 ft/ft 8 in 0.013 0.633 ft3/s 0.506 ft3/s 0.045 ft3/s 1. Bryan/College Station Unified Design Guidelines-Sanitary Sewer Note: Infiltration 750 gal/acre 36 acres 27000 gal/day Engineer believes estimates of peaking factor and infiltration rate are quite excessive. However, these values were used in accordance with College Station Unified Design Guidelines. 1 "''I" Engineering Estimate of Costs@ 100% Design Proposed Sanitary Sewer Line for Lot 7, Block One and all of Block Two Rock Prairie West Business Park College Station, Texas Proposed Sanitary Sewer Utility Service It N It em 0. em Q "t uamrv u "t m 1 Standard City of College Station San. Swr. MH (0'-8' Depth) 2 EA 2 8" Diameter SDR26-3034 PVC San. Swr. Pipe (5'-7' Depth) 920 LF 3 Traffic Safety Siqnaqe 4 Trench Safety 5 Tie into Existing Manhole 6 Add drop to Existinq Manhole 7 Mobilization Adams, Taggart, and Associates Lenwood S. Adams, P.E. Managing Principal 1 EA 920 LF 1 EA 1 EA 1 EA Total Construction Cost: Construction Contingencies 20% Total Engineering & Suryeying Fee 18% Grand Total: u "t p . m nee $2,500.00 $26.00 $500.00 $1 .00 $500.00 $1 ,500.00 $4,000.00 Total T t I oa $5,000.00 $23,920.00 $500.00 $920.00 $500.00 $1,500.00 $4,000.00 $36,340.00 $36,340.00 $7,268.00 $43,608.00 $7,849.44 $51,457.44