HomeMy WebLinkAboutDevelopment PermitsCITY OF COLLEGE STATION
Planning & lkwlopmml Servica
SITE LEGAL DESCRIPTION:
Greensworld Subdivision Ph 3
Block 1 , Lot 1
DATE OF ISSUE: 11-20-06
OWNER:
Salim Ismail
925 Earl Rudder Fwy
College Station, TX 77845
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
DEVELOPMENT PERMIT
PERMIT NO. 06-71
FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
925 Earl Rudder Fwy
DRAINAGE BASIN:
Carter's Creek
VALID FOR 12 MONTHS
CONTRACTOR:
Full Development Permit
Gary Fuqua
PO box 1537
Navasota, TX 77868
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents,
asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited.
NO EQUIPTMENT ON CREEK SIDE OF PILINGS. PLACE ROCK FROM ABOVE. COMPLY WITH ALL TPDES PHASE
2 REQUIREMENTS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion, siltation or sedimentation resulting from the permitted work.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
'-
/ l-?£J--{,
Date
Date
CITY OF COLLEGE STATION
Planning & DevtlDpmmt 5"-vius
SITE LEGAL DESCRIPTION:
Greensworld Subdivision Ph 3
Block 1 , Lot 1
DATE OF ISSUE: 11-20-06
OWNER:
Salim Ismail
925 Earl Rudder Fwy
College Station, TX 77845
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
DEVELOPMENT PERMIT
PERMIT NO. 06-71
FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
925 Earl Rudder Fwy
DRAINAGE BASIN:
Carter's Creek
VALID FOR 12 MONTHS
CONTRACTOR:
Full Development Permit
Gary Fuqua
PO box 1537
Navasota, TX 77868
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents,
asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited.
NO EQUIPTMENT ON CREEK SIDE OF PILINGS. PLACE ROCK FROM ABOVE. COMPLY WITH ALL TPDES PHASE
2 REQUIREMENTS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion, siltation or sedimentation resulting from the permitted work.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
11-~-c
Date
Owner/ Agent/Contractor Date
CITY OF COLLEGE STATION
Planning d-Dewlopmmt Servicn
SITE LEGAL DESCRIPTION:
Greensworld Subdivision Ph 3
Block 1, Lot 1
DATE OF ISSUE: 11-20-06
OWNER:
Salim Ismail
925 Earl Rudder Fwy
College Station, TX 77845
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
DEVELOPMENT PERMIT
PERMIT NO. 06-71
FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
925 Earl Rudder Fwy
DRAINAGE BASIN:
Carter's Creek
VALID FOR 12 MONTHS
CONTRACTOR:
Full Development Permit
Gary Fuqua
PO box 1537
Navasota, TX 77868
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as , but not limited to, paint, oil, solvents,
asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited.
NO EQUIPTMENT ON CREEK SIDE OF PILINGS. PLACE ROCK FROM ABOVE. COMPLY WITH ALL TPDES PHASE
2 REQUIREMENTS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion, siltation or sedimentation resulting from the permitted work.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion , and sedim entation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
Adm inistrator/Representative Date
Owner/Agent/Contractor Date