Loading...
HomeMy WebLinkAboutCost EstimateESTIMATE OF PROBABLE COST City of College Station - Central Park Improvements Public Waterline Improvements JC PROJECT NO. C0088-001 Estimated ITEM NO. DESCRIPTION UNIT PRICE AMOUNT Quantity BASE BID - WATERLINE General Overhead for all Work Including 1 1 LS Mobilization, Bonds, Insurance, and Related $4,000.00 $4,000.00 Items 6" Water Line, AWWA C900 Class 200 PVC with 2 304 IF Detector Tape and Tracer Wire in Trench (48" $23.00 $6,992.00 Min Cover) 3 100 LF 6" Water Line, AWWA C900 Class 200 PVC by $65. 00 $6,500.00 Bore with Detector Tape and Tracer Wire 4 2 EA 6"X6" DI Tee *350.00 $700.00 5 1 EA 6" Isolation Gate Valve wth AMINO use, LL526 $1,250.00 $1,250.00 Lockable Lid or Equivalent Approved by City 6 1 EA Tie into Existing Waterline $1,500.00 $1,500.00 7 2 EA Fire Hydrant Assembly $3,200.00 $6,400.00 8 2,200 SF Block Sod Disturbed Areas in grass with $1.50 $3,300.00 common Bermuda 9 1 LS Infield Gravel/Clay Mixture $500.00 $500.00 1 p_4E OF TE,Ygs �1++ TOTAL: $31,142.00 *: . / 51EVE E. DU. FAN 00 .................. 83252 . _ i 1 1. This estimate represents my best judgment as a design professional familiar with the construction industry. Jones & Carter, Inc, has no control over the cost of labor, materials, or equipment; over the Contractor's methods of determining bid prices; or over competitive bidding or market conditions. Accordingly, we cannot and do not guarantee that bide will not vary from this cost estimate.