Loading...
HomeMy WebLinkAboutReponse to CommentsAugust 21 , 2006 City of College Station Development Services Department 1101 Texas Avenue College Station, Texas 77840 Re: Dominion on Dominik Culpepper Plaza Replat (FP) -Final Plat (06-00500066) GE Job No.: 06-0120 Dear Sirs: G Gessner Engineering OG ·ll \.o o\'d\tcµ 0\ ',Llb '\26L- Attached is the revised Final Plat for the proposed Dominion on Dominik project located at the intersection of George Bush East, Dominik and Puryear Drives. The revised Final Plat was prepared based upon the comments received from the Staff Review Comments No. 1 dated July 31 and August 1, 2006. Responses to each comment are provided in the body of this letter and in the order presented . Planning 1. The building areas were removed from the plat 2. All lots except the common area are 2,000 square feet in size. 3. The County of Dallas Certificate was removed from the Plat. 4. The City Council approval was removed from the Plat. 5. Each Lot Number has been reassigned as requested. 6. A six foot wide sidewalk will be provided along Dominik and Pu ryear Drives as requested. 7. The construction plans for the extention of utilities to the site are attached. 8. I contacted Wally in Sanitation and he indicated that we will be able to use two (2), 300 gallon dumpsters for solid waste disposal. 1712 Southwest Parkway, Suite #105, College Station, Texas 77840 •P.O. Box 10763, 77842-0763 • 979.680.8840 •FAX 979.680.8841 1400 South Austin Street, Brenham, Texas 77833 • 979.836.6855 •FAX 979.836.6847 www.GessnerEngineering.com Engineering 1. The detention facilities shall not be situated within the Public utility easements. 2. Proposed public utility easements have been added between the lots as depicted on the Final Plat. 3. Construction documents associated with the extension of public utilities to this site are provided for your review. I have also attached the engineer's cost estimate for the extension of these public utilities. 4. The proposed location of the private water and sanitary sewer services are denoted on the construction documents for the City of College Station Staff review. 5. The construction documents for the extension of the public utility services are attached for your review as requested. Electrical 1. The developer shall install the requested conduits per the specs and design. 2. The developer understands that the City will provide drawings for conduit installation. 3. The developer shall provide 30 feet of rigid or IMC conduit for riser poles. 4. The developer shall intercept the existing conduit at the designated transformer and extend as required . 5. The developer shall furnish and install conduit as shown on the electrical layout if it does not exist. 6. The developer shall pour the transformer pads as per the City of College Station specifications and design. 7. The developer shall install pull boxes and secondary pedestals as per the City of College Station specifications and design. Gessner Engineering 8. The developer shall provide digital AutoCAD 2000 or late r ve rsion of the Final Plat to wdavis@cstx.gov when approved . 9. The developer shall provide the load data for the project with the electrical plans. 10. The developer shall provide a temporary blanket easement with the construction plan submitted for review. 11. The developer shall provide electric easements for electrical infrastructure as installed for electric lines (including street lights). It has been a pleasure to submit this information to the Development Services department. If you have any questions, please contact me. Sincerely, Gessner Engineering Gessner Engineering