HomeMy WebLinkAboutReponse to CommentsAugust 21 , 2006
City of College Station
Development Services Department
1101 Texas Avenue
College Station, Texas 77840
Re: Dominion on Dominik
Culpepper Plaza Replat (FP) -Final Plat (06-00500066)
GE Job No.: 06-0120
Dear Sirs:
G
Gessner
Engineering
OG ·ll \.o
o\'d\tcµ
0\ ',Llb
'\26L-
Attached is the revised Final Plat for the proposed Dominion on Dominik project
located at the intersection of George Bush East, Dominik and Puryear Drives.
The revised Final Plat was prepared based upon the comments received from
the Staff Review Comments No. 1 dated July 31 and August 1, 2006.
Responses to each comment are provided in the body of this letter and in the
order presented .
Planning
1. The building areas were removed from the plat
2. All lots except the common area are 2,000 square feet in size.
3. The County of Dallas Certificate was removed from the Plat.
4. The City Council approval was removed from the Plat.
5. Each Lot Number has been reassigned as requested.
6. A six foot wide sidewalk will be provided along Dominik and Pu ryear
Drives as requested.
7. The construction plans for the extention of utilities to the site are
attached.
8. I contacted Wally in Sanitation and he indicated that we will be able to
use two (2), 300 gallon dumpsters for solid waste disposal.
1712 Southwest Parkway, Suite #105, College Station, Texas 77840 •P.O. Box 10763, 77842-0763 • 979.680.8840 •FAX 979.680.8841
1400 South Austin Street, Brenham, Texas 77833 • 979.836.6855 •FAX 979.836.6847
www.GessnerEngineering.com
Engineering
1. The detention facilities shall not be situated within the Public utility
easements.
2. Proposed public utility easements have been added between the lots as
depicted on the Final Plat.
3. Construction documents associated with the extension of public utilities
to this site are provided for your review. I have also attached the
engineer's cost estimate for the extension of these public utilities.
4. The proposed location of the private water and sanitary sewer services
are denoted on the construction documents for the City of College Station
Staff review.
5. The construction documents for the extension of the public utility
services are attached for your review as requested.
Electrical
1. The developer shall install the requested conduits per the specs and
design.
2. The developer understands that the City will provide drawings for
conduit installation.
3. The developer shall provide 30 feet of rigid or IMC conduit for riser
poles.
4. The developer shall intercept the existing conduit at the designated
transformer and extend as required .
5. The developer shall furnish and install conduit as shown on the
electrical layout if it does not exist.
6. The developer shall pour the transformer pads as per the City of
College Station specifications and design.
7. The developer shall install pull boxes and secondary pedestals as per
the City of College Station specifications and design.
Gessner Engineering
8. The developer shall provide digital AutoCAD 2000 or late r ve rsion of the
Final Plat to wdavis@cstx.gov when approved .
9. The developer shall provide the load data for the project with the
electrical plans.
10. The developer shall provide a temporary blanket easement with the
construction plan submitted for review.
11. The developer shall provide electric easements for electrical
infrastructure as installed for electric lines (including street lights).
It has been a pleasure to submit this information to the Development Services
department. If you have any questions, please contact me.
Sincerely,
Gessner Engineering
Gessner Engineering