Loading...
HomeMy WebLinkAboutStaff Comments(*tlw'" CITY OF COLLEGE STATION Home of Texan AetW Unioeoity' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 4, 2011 TO: Philip Bargas via email Pbargas@cstx.govv FROM: Molly Hitchcock, AICP Planning Administrator SUBJECT: COCS CARTERS CREEK WASTEWATER TREATMENT Thank you for the submittal of your SITE PLAN - COMMERCIAL application. Whlie the Non - Residential Architectural Standards Building Review Application was not necessary, staff will make a complimentary review of the information provided. This project will be distributed to staff next week for their review. cc: Sarah Kresta via email smkrestaCa).lan-inc.Qrnr JP Grom via email jpgrom@Ian-inc.com Case file no. 11-00500039 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 CITYCOUPGESTATION Phone 979.764.3570 / Fax 979.764.3496 H,n,,fR,w A6.if Unircnif MEMORANDUM March 14, 2011 11 TO: Philip Bargas, P.E. via email pbargas@cstx.govV/ ✓ �� G FROM: Lauren A. Hovde, Staff Planner SUBJECT: COCS Carters Creek Wastewater Treatment- Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff s comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Four (4) revised site plans. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Lauren Hovde at 979.764.3570. Attachments: Staff review comments PC: Sarah Kresta, P.E. via email: smlaesta@lan-ino.com w JP Grom, AIA via email: JPGrom@lan-ine.com� Case file #11-00500040 STAFF REVIEW COMMENTS NO. 1 Project: COCS Carters Creek Wastewater Treatment — 11-00500040 PLANNING 1. Please consolidate sheets C-000, C-101, and C-103, and show perimeter setbacks and dimensions. 2. Please show the existing drive aisle connecting to the new drive aisle to provide adequate Fire access. 3. Will this building use the existing dumpster? 4. Please provide the square footage of the existing buildings. 5. Parking and drive aisles must be curbed and paved using standards found in the College Station Site Design Standards. Wheelstops will not be necessary. 6. Each parking space must be 9'x20', measured from the face of the curb. 7. The drive aisles must be at least 23' wide and should be marked at Fire Lane. 8. Please label all meters. 9. It appears that one existing space is being cut in half. Is this intentional? 10. Please add a submittal date to the site plan. 11. What type of fence is being shown on sheet C-101? If chain link is being used, it must be screened from the abutting residential property. 12. There appears to be a sliver of a fapade projection along the south fagade. Please clarify its purpose as it appears to block the sidewalk. 13. Please show the location of the knox box. 14. FYI ... No landscape plan is required because the landscaping is not being added or altered. 15. FYI ... No buffer is required because this addition is not more than 25% of the whole development. 16. FYI ... There is no parking ratio being enforced. Parking has been determined by the applicant. 17. FYI... Bicycle parking is not being required because this project, being a public industrial use, is exempt from NRA. 18. Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 19. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 20. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Lauren Hovde Date: March 14, 2011 TxDOT Comments 1. No Comment (not applicable) Reviewed by: Chad Bohne GREENWAYS 1. No Comments. Reviewed by: Venessa Garza Date: March 11, 2011 Date: March 3, 2011 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. All easements on site are existing. Electric facilities will be designed within existing easements. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 4. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 5. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton ENGINEERING COMMENTS NO. 1 Date: 3.09.11 Site Plan 1. Please list the minimum, average, and maximum water and wastewater demands. 2. Show and label 2-ft existing and proposed contours. 3. Provide a note indicating the building size, construction material type (i.e. Type 213), and whether or not the building is proposed to be sprinkled. 4. Please add a note references the FEMA Firm Panel where this project is located and if any portion of the project is within the 100-yr floodplain. 5. The water, sanitary sewer and storm sewer needs to be shown and labeled with size, material, and slope (if applicable). 6. Please show and label any easements on site. Construction Documents 1. Please provide a copy of the NOI. 2. Please provide a copy of the Drainage Report. 3. Provide full-sized plan and profile drawings for the proposed waterline (not including the service line to the building) and fire hydrant. 4. Please submit a cost estimate, Letter of Acknowledgment, and City standard details for the public water lines and fire hydrant. 5. C-101 — Please label or note the water and sanitary sewer line size, material, and slope (if applicable). 6. Fire Flow Report — The fire flow should be in accordance with the 2009 International Fire Code. Reviewed by: Erika Bridges Date: 3/14/11 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY(>Y C0)I.I.110I STATION Unme ofTisuA6Af Unircnip' MEMORANDUM April 26, 2011 TO: Philip Bargas, P.E. via email pbargasCa)cstx.govv", FROM: Lauren Hovde, Staff Planner 1 G/ SUBJECT: Cocs Carters Creek Wastewater Treatment - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Four (4) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Sarah Kresta, P.E. via email: smkresta(aDlan-inc.comr' JP Grom, AIA via email: JPGrom Ian-inc.co Case file #11-00500039 STAFF REVIEW COMMENTS NO. 2 Project: COCS Carters Creek Wastewater Treatment - 11-00500039 1. Details necessary for the site plan must be located on the site plan itself (C-101). These detail include, but are not limited, to curb, pavement, fire lane signage, and swing gate. 2. Repeat: Show perimeter setbacks and dimensions. This information is required regardless of platting. 3. There is not a landscape buffer in place to screen the chain link fence from view. Please provide clarification what native vegetation is going to be preserved to act as a buffer within the imposed 150'. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Lauren Hovde, Staff Planner ENGINEERING COMMENTS NO. 2 Date: April 26, 2011 Site Plan 1. (Repeat) Please list the minimum, average, and maximum water and wastewater demands. Why are the average and maximum sanitary sewer demands the same? The should be calculated in accordance with the BCS Unified Design Guidelines. 2. (Repeat) Please add a note references the FEMA Firm Panel where this project is located and if any portion of the project is within the 100-yr floodplain. Please include the statement in the response to comments in Note #10 that no portion of the building is within the 100-yr floodplain. 3. Please show and label the project's Limits of Disturbance. Construction Documents 1. (Repeat) Please provide a copy of the NOI. FYI ... The NOI will be required to be submitted by the contractor when he signs the Development Permit. Reviewed by: Erika Bridges Date: 4/25/11