Loading...
HomeMy WebLinkAboutSanitary Sewer Design MemoKLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 B.J. Kling, P.E., R.P.L.S. S.M. Kling, R.P.L.S. Telephone 979 I 846-6212 Fax 979/846-8252 Sanitary Sewer Design Memo To: City of College Station Development Engineering Department Re: Rosa's Subdivision, Lot 2 -Marriot Residence Inn From: Fred Paine, P.E. Post Office Box 4234 Bryan, Texas 77805 April 2, 2007 The Rosa's Subdivision Lot 2 Marriot Residence Inn development will be served by the existing 8" pvc sanitary sewer line along the east side of the tract. A sanitary sewer service tap is proposed to be installed directly on this line. Peak sanitary sewer demands were determined using the fixture unit method with fixture units being supplied by the plumbing consultant. Peak demand was determined to be 220 gpm (13,200 gph). The existing 8" line was analyzed with remaining capacity documented in the Wastewater Design Report prepared by Kling Engineering & Surveying May 2005 for University Town Center. Remaining capacity for this line was determined to be 19,543 gph. The addition of 13,200 gph from the Marriot Residence Inn development leaves approximately 22.5% capacity (6,345 gpm) in the existing 8" line. The existing line is sufficient to provide for the proposed development.