HomeMy WebLinkAboutCost EstimateENGINEER'S ESTIMATE ,_ -· PUBLIC INFRASTRUCTURE
RESIQ.ENCE INN BY MARRIOTT
APRIL 2, 2007
ITEM EST. ITEM DESCRIPTION & PRICE IN WORDS UNIT PRICE TOTAL PRICE
IN FIGURES IN FIGURES NO. QTY. UNIT .. ..:
WATER LINE:
1 49 LF Furnish and Install 1 O" PVC Water Main (AWWA C-909, DR $34.00 $1 ,666.00
14, Pressure Class 200) -Extra Depth-6'-8' Bury complete
and in place
for Dollars
and Cents per linear foot.
(Structural Beddinq and Backfill)
2 12 LF Furnish and Install 10" PVC Water Main (AWWA C-909, DR $36.00 $432.00
14, Pressure Class 200) -Extra Depth-8'-10' Bury complete
and in place
for Dollars
and Cents per linear foot.
(Structural Beddinq and Backfill)
3 1 EA Furnish and Install 10" Gate Valve and Box, complete and in $800.00 $800.00
place
for Dollars
and Cents each.
4 1 EA Furnish and Install 10" Ductile Iron, M.J. 45° Bend, to include $600.00 $600.00
all necessary thrust blocking, complete and in place
for Dollars
and Cents each.
5 1 EA Furnish and Install 1 O"x8" Ductile Iron, M.J. Reducer, to include $500.00 $500.00
all necessary thrust blocking, complete and in place
for Dollars
and Cents each.
6 1 EA Furnish and Install Standard City of College Station Fire $2,700.00 $2,700.00
Hydrant, with all necessary appurtances, complete and in place
for Dollars
and Cents each.
7 1 EA Furnish and Install Standard City of College Station 1-1/2" $1 ,000.00 $1,000.00
Irrigation Meter with box, complete and in place
for Dollars
and Cents each.
8 1 EA Furnish and Install Standard City of College Station 3" $2 ,000.00 $2,000.00
Domestic Water Meter with vault, complete and in place
for Dollars
and Cents each .
ENGINEER'S. ESTIMA rE ·'
~ ' , PUSLIC INFRASTRUCTURE
RESIDENCE INN BY MARRIOTT
APRI~ 2, 2097 ·;c
J+Y
ITEM EST. ITEM DESCRIPTION & PRICE IN WORDS UNIT PRICE TOTAL PRICE
IN FIGURES IN FIGURES NO. QTY. UNIT ,)::;
9 346 SF Sawcut, Demo, Dispose of off-site, and Replace Existing $10.00 $3,460.00
Concrete Pavement and Monolithic Curb, complete and in
for Dollars
and Cents each.
10 1 EA Furnish and Install Wet Connection to existing 8" AC Waterline, $2 ,000.00 $2,000.00
to include 8"x8"x8" D.I., M.J. Tee, Line shall be shutoff for
connection, contractor to coordinate with City of College Station
Public Works for taking the 8" line out of service.
for Dollars
and Cents each.
WATERLINE TOTAL-SUBTOTAL 1: $15,158.00
(ITEMS 1-10)
ESTIMATE SUMMARY
SUBTOTAL 1: $15,159.00
10% Contingency: $1,515.90
TOTAL ESTIMATED COSTS: $16,674.90