Veronica I Dale,
Alan Gibbs
Friday, December 13, 2013 5:10 PM
Veronica Morgan; 'J. Dale Browne, Jr.'; Teresa Rogers; Carol Cotter; Erika Bridges; Danielle
Singh; Lance Simms
Bridgewood -CSISD Initial Development Permits
As I mentioned in our recent meeting, the city can issue a Development Permit for school site for
clearing and grading, as well some utility and flatwork -ahead of the final plat. As also
discussed, a temporary emergency access off Phillips Parkway and water line/fire hydrant will need
to be constructed before combustibles can be brought on site. The final plat for the school lot
and all required ROW etc will need to be filed with all appropriate construction plans and surety,
before a full building permit can be issued.
This process is to help expedite this project and specifically the request to begin site
construction. The ability to delay the final plat is possible due to exemptions associated with
ISDs.
I would again encourage and offer staff to meet with you on the following as soon as your team is
ready:
-Initial DP items: construction and emergency access, waterline, rough grading/drainage
-Barron Cut-Off and Barron Rd: Survey work I existing pavement / Possible traffic mitigation
-TIA
Lastly, comments on the preliminary plan submitted should be returned early next week .
Let us know if there are questions.