Loading...
HomeMy WebLinkAboutLetter from StaffErika Bridges From: Sent: To: Subject: Veronica I Dale, Alan Gibbs Friday, December 13, 2013 5:10 PM Veronica Morgan; 'J. Dale Browne, Jr.'; Teresa Rogers; Carol Cotter; Erika Bridges; Danielle Singh; Lance Simms Bridgewood -CSISD Initial Development Permits As I mentioned in our recent meeting, the city can issue a Development Permit for school site for clearing and grading, as well some utility and flatwork -ahead of the final plat. As also discussed, a temporary emergency access off Phillips Parkway and water line/fire hydrant will need to be constructed before combustibles can be brought on site. The final plat for the school lot and all required ROW etc will need to be filed with all appropriate construction plans and surety, before a full building permit can be issued. This process is to help expedite this project and specifically the request to begin site construction. The ability to delay the final plat is possible due to exemptions associated with ISDs. I would again encourage and offer staff to meet with you on the following as soon as your team is ready: -Initial DP items: construction and emergency access, waterline, rough grading/drainage -Barron Cut-Off and Barron Rd: Survey work I existing pavement / Possible traffic mitigation -TIA Lastly, comments on the preliminary plan submitted should be returned early next week . Let us know if there are questions. Thanks, Alan Alan Gibbs, P.E., CFM City Engineer City of College Station 1