HomeMy WebLinkAboutCost EstimateSCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No.12327
Spring Creek Townhomes Phase 3
Engineer's Estimate of Construction
Revised August 1, 2013
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
General Items
I
Mobilization, Overhead and Construction Staking
LS
1
$ 3,000.00
$ 3,000.00
2
Topsoil Removal and Replacement, complete in place
LS
1
$ 3,000.00
$ 3,000.00
3
Erosion & Sediment Control - SWPPP Implementation & Maintenance, Silt
Fence, Construction Exit, Rock Filter Dam, etc., complete in place
LS
I
$ 1,500.00
$ 1,500.00
4
Hydroseed and Hydromulch, complete in place
SY
1,720
$ 0.50
$ 860.00
General Items Subtotal
$ 8,360.00
. Street Construction Items Concrete Pavement
5
Excavation & Grading, complete in place
LS
l
$ 6,000.00
$ 6,000.00
6
Mixing & incorporation of lime, 8" deep, complete in place
SY
3,257
$ 2.30
$ 7,491.10
7
Hydrated Lime, complete in place (27 Ib/sy fot 6" deep)
Ton
44
$ 170.00
$ 7,480.00
8
6" Reinforced Concrete Pavement w/ Laydown Curb, complete in place
SY
2,783
$ 32.00
$ 89,056.00
9
Reinforced Concrete Pavement - Aprons - 6" Thick w/ Monolithic Standard Curb,
complete in place
SF
820
$ 4.00
$ 3,280.00
10
Concrete Sidewalk & Ramps - 4" thick, complete in place
SF
5,830
$ 3.40
$ 19,822.00
It
ADA Ramps - Detectable Warning Surfaces, complete in place
EA
4
$ 500.00
$ 2,000.00
Street Construction Concrete Pavement Items Subtotal
$ 135,129.10
Storm Sewer Construction Items- -
12
24" HDPE Pipe, complete in place (Structural)
LF
231
$ 40.00
$ 9,240.00
13
Curb Inlet - 10' wide, complete in place
EA
l
$ 3,000.00
$ 3,000.00
14
TV Testing and Inspection, complete in place
LF
231
$ 2.00
$ 462.00
Storm Sewer Construction Items Subtotal
$ 12,702.00
Page 1 of 3
Spring Creek Townhomes Phase 3
Engineer's Estimate of Construction
Revised August 1, 2013
Item
Description
Unit
I Estimated
uantit
Unit Price
Total
Water Construction Items
15
8" C900 Water Pipe w/tracer wire - Structural Backfill, complete in place
LF
141
$ 26.00
$ 3,666.00
16
8" C900 Water Pipe w/tracer wire - Non -Structural Backfill, complete in place
LF
331
$ 24.00
$ 7,944.00
17
6" C900 Water Pipe w/tracer wire - Structural Backfill, complete in place
LF
245
$ 22.00
$ 5,390.00
18
6" C900 Water Pipe w/tracer wire - Non -Structural Backfill, complete in place
LF
38
$ 20,00
$ 760.00
19
4" C900 Water Pipe w/tracer wire - Structural Backfill, complete in place
LF
133
$ 23.00
$ 3,059.00
20
Fire Hydrant Assembly (w/ valve, vert. extension), complete in place
EA
1
$ 3,500,00
$ 3,500,00
21
Connect to Existing Water Line
EA
2
$ 300.00
$ 600.00
22
6" M.J. Gate Valve, complete in place
EA
1
$ 850,00
$ 850.00
23
8" M.J. Gate Valve, complete in place
EA
2
$ 650.00
$ 1,300.00
24
8" x 8" M.J. Tee, complete in place
EA
1
$ 550.00
$ 550.00
25
8" x 6" M.J. Tee, complete in place
EA
1
$ 500.00
$ 500.00
26
8" x 6" M.J. Reducer, complete in place
EA
1
$ 250.00
$ 250.00
27
8" x 4" M.J. Reducer, complete in place
EA
1
$ 200.00
$ 200.00
28
4" x 45" M.J. Bend, complete in place
EA
1
$ 300.00
$ 300.00
29
1" Water Service, > 15 ft (avg length = 50 ft)
EA
1
$ 1,000.00
$ 1,000.00
30
1.5" Water Service, < 15 ft (avg length = 1 ft)
EA
14
$ 800.00
$ 11,200.00
31
1.5" Water Service, > 15 ft (avg length = 49.5 ft)
EA
5
$ 1,200.00
$ 6,000.00
32
2" Blowoff Assembly, complete in place
EA
1
$ 750.00
$ 750.00
33-
Waterline Testing
LS
1
$ 500.00
$ 500.00
Water Construction Items Subtotal
$ 47,819.00
Page 2 of 3
A
Spring Creek Townhomes Phase 3
Engineer's Estimate of Construction
Revised August 1, 2013
Item
Description
Unit
Estimated
uan[it
Unit Price
Total
Sanitary Sewer Construction Items
15
6" PVC Sewer Line - D3034 -Structural Backfill, complete in place
LF
548
$ 20.00
$ 10,960.00
16
6" PVC Sewer Line - D3034 -Non-Structural Backfill, complete in place
LF
48
$ 18.00
$ 864.00
17
6" PVC Sewer Line - ASTM D-2241 - Structural Backfill, complete in place
LF
20
$ 20.00
$ 400.00
18
4" Sewer Service -Single (avg. length = 6 ft), complete in place
EA
1
$ 300.00
$ 300,00
19
4" Sewer Service -Double (avg length = 3 ft), complete in place
EA
5
$ 400,00
$ 2,000.00
20
4" Sewer Service -Single (avg length = 73 ft), complete in place
EA
1
$ 850.00
$ 850.00
21
4" Sewer Service -Double (avg length = 48 ft), complete in place
EA
12
$ 950.00
$ 11,400.00
22
Tie -In to Existing 8" PVC Sewer Line, complete in place
EA
1
$ 500.00
$ 500.00
23
Concrete Manhole - 4' Dia. - complete in place
EA
3
$ 2,800.00
$ 8,400.00
24
TV Testing and Inspection, complete in place
LF
616
$ 2.00
$ 1,232.00
Sanitary Sewer Construction Items Subtotal
$ 36,906.00
General Items Subtotal
$
8,360.00
Street Construction Concrete Pavement Items Subtotal
$
135,129.10
Storm Sewer Construction Items Subtotal
$
12,702.00
Water Construction Items Subtotal
$
47,819.00
Sanitary Sewer Construction Items Subtotal
$
36,906.00
TOTAL CONSTRUCTION
1 $
240,916.10
r-144"
SCHUM ENCINEERINC, LLC,
Page 3 of 3
�,/3
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No.12327
Spring Creek Townhomes Phase 3
Engineer's Estimate of Construction
Concrete Pavement Option
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
General Items
1
Mobilization, Overhead and Construction Staking
LS
1
$ 3,000.00
$ 3,000.00
2
Topsoil Removal and Replacement, complete in place
LS
1
$ 3,000.00
$ 3,000.00
3
Erosion & Sediment Control - SWPPP Implementation & Maintenance, Silt
Fence, Construction Exit, Rock Filter Dam, etc., complete in place
LS
1
$ 1,500.00
$ 1,500.00
4
Hydroseed and Hydromulch, complete in place
SY
1,720
$ 0.50
$ 860.00
General Items Subtotal
$ 8,360.00
Street Construction Items Concrete Pavement
5
Excavation & Grading, complete in place
LS
1
$ 6,000.00
$ 6,000.00
6
Mixing & incorporation of lime, 8" deep, complete in place
SY
3,257
$ 2.30
$ 7,491.10
7
Hydrated Lime, complete in place (27 Ib/sy frt 6" deep)
Ton
44
$ 170.00
$ 7,480.00
8
6" Reinforced Concrete Pavement w/ Laydown Curb, complete in place
SY
2,783
$ 32.00
$ 89,056.00
9
Reinforced Concrete Pavement - Aprons - 6" Thick w/ Monolithic Standard Curb,
complete in place
SF
820
$ 4,00
$ 3,280.00
10
Concrete Sidewalk & Ramps - 4" thick, complete in place
SF
5,000
$ 3.40
$ 17,000.00
11
ADA Ramps - Detectable Warning Surfaces, complete in place
EA
4
$ 500.00
$ 2,000.00
Street Construction Concrete Pavement Items Subtotal
$ 132,307.10
Storm Sewer Construction Items
12
24" HDPE Pipe, complete in place (Structural)
LF
231
$ 40.00
$ 9,240.00
13
Curb Inlet - IO' wide, complete in place
EA
I
$ 3,000.00
$ 3,000.00
14
TV Testing and Inspection, complete in place
LF
231
$ 2.00
$ 462.00
Storm Sewer Construction Items Subtotal
$ 12,702.00
Page 1 of 3
Spring Creek Townhomes Phase 3
Engineer's Estimate of Construction
Concrete Pavement Option
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
Water Construction Items
15
8" C900 Water Pipe w/tracer wire - Structural Backfill, complete in place
LF
141
$ 26.00
$ 3,666.00
16
8" C900 Water Pipe w/tracer wire -Non-Structural Backfill, complete in place
LF
331
$ 24.00
$ 7,944.00
17
6" C900 Water Pipe w/tracer wire - Structural Backfill, complete in place
LF
245
$ 22.00
$ 5,390.00
18
6" C900 Water Pipe w/tracer wire -Non-Structural Backfill, complete in place
LF
38
$ 20.00
$ 760.00
19
4" C900 Water Pipe w/tracer wire - Structural Backfill, complete in place
LF
133
$ 23.00
$ 3,059.00
20
Fire Hydrant Assembly (w/ valve, vert. extension), complete in place
EA
1
$ 3,500.00
$ 3,500.00
21
Connect to Existing Water Line
EA
2
$ 300,00
$ 600.00
22
6" M.J. Gate Valve, complete in place
EA
1
$ 850.00
$ 850.00
23
4" M.J. Gate Valve, complete in place
EA
I
$ 650.00
$ 650.00
24
8" x 8" M.J. Tee, complete in place
EA
1
$ 550.00
$ 550.00
25
8" x 6" M.J. Tee, complete in place
EA
1
$ 500.00
$ 500.00
26
8" x 6" M.J. Reducer, complete in place
EA
1
$ 250.00
$ 250.00
27
8" x 4" M.J. Reducer, complete in place
EA
1
$ 200.00
$ 200.00
28
4" x 45" M.J. Bend, complete in place
EA
1
$ 300.00
$ 300.00
29
1" Water Service, > 15 ft (avg length = 50 ft)
EA
1
$ 1,000.00
$ 1,000.00
30
1.5" Water Service, < 15 ft (avg length = I ft)
EA
14
$ 800.00
$ 11,200.00
31
1.5" Water Service, > 15 ft (avg length = 49.5 it)
EA
5
$ 1,200.00
$ 6,000.00
32
2" BlowoffAssembly, complete in place
EA
l
$ 750.00
$ 750.00
33
Waterline Testing
LS
l
$ 500.00
$ 500.00
Water Construction Items Subtotal
$ 47,169.00
Page 2 of 3
Spring Creek Townhomes Phase 3
Engineer's Estimate of Construction
Concrete Pavement Option
Item
Description
Unit
Estimated
uantit
Unit Price
Total
Sanitary Sewer Construction Items
15
6" PVC Sewer Line - D3034 -Structural Backfill, complete in place
LF
548
$ 20.00
$ 10,960.00
16
6" PVC Sewer Line - D3034 -Non-Structural Backfill, complete in place
LF
48
$ 18.00
$ 864.00
17
6" PVC Sewer Line - ASTM D-2241 - Structural Backfill, complete in place
LF
20
$ 20.00
$ 400.00
18
4" Sewer Service -Single (avg. length = 6 ft), complete in place
EA
1
$ 300.00
$ 300.00
19
4" Sewer Service -Double (avg length = 3 ft), complete in place
EA
5
$ 400.00
$ 2,000.00
20
4" Sewer Service -Single (avg length = 73 ft), complete in place
EA
I
$ 850.00
$ 850.00
21
4" Sewer Service -Double (avg length = 48 ft), complete in place
EA
12
$ 950.00
$ 11,400.00
22
Tie -In to Existing 8" PVC Sewer Line, complete in place
EA
l
$ 500.00
$ 500.00
23
Concrete Manhole - T Dia. -complete in place
EA
3
$ 2,800.00
$ 8,400.00
24
TV Testing and Inspection, complete in place
LF
616
$ 2.00
$ 1,232.00
Sanitary Sewer Construction Items Subtotal
$ 36,906.00
General Items Subtotal
$
8,360.00
Street Construction Concrete Pavement Items Subtotal
$
132,307.10
Storm Sewer Construction Items Subtotal
$
12,702.00
Water Construction Items Subtotal
$
47,169.00
Sanitary Sewer Construction Items Subtotal
$
36,906.00
TOTAL CONSTRUCTION1
$
237,444.10
+JOSEB J: P.. SCHUi�T�Z�
F-12327 7- r� 3
SCHULTZ ENGINEERING. I.I.C.
Page 3 of 3
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No.12327
Spring Creek Townhomes Phase 3
Engineer's Estimate of Construction
Concrete Pavement Option
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
- General Items
1
Mobilization, Overhead and Construction Staking
LS
1
$ 3,000.00
$ 3,000.00
2
Topsoil Removal and Replacement, complete in place
LS
1
$ 3,000.00
$ 3,000.00
3
Erosion & Sediment Control - SWPPP Implementation & Maintenance, Silt
Fence, Construction Exit, Rock Filter Dam, etc., complete in place
LS
1
$ 1,500.00
$ 1,500.00
4
Hydroseed and Hydromulch, complete in place
SY
1,720
$ 0.50
$ 860.00
General Items Subtotal
$ 8,360.00
Street Construction Items Concrete Pavement
5
Excavation & Grading, complete in place
LS
I
$ 6,000.00
$ 6,000.00
6
Mixing & incorporation of lime, 8" deep, complete in place
SY
3,257
$ 2.30
$ 7,491.10
7
Hydrated Lime, complete in place (27 lb/sy lot 6" deep)
Ton
44
$ 170.00
$ 7,480.00
8
6" Reinforced Concrete Pavement w/ Laydown Curb, complete in place
SY
2,783
$ 32.00
$ 89,056.00
9
Reinforced Concrete Pavement - Aprons - 6" Thick w/ Monolithic Standard Curb,
complete in place
SF
I
820
$ 4.00
-
$ 3,280.00
l0
Concrete Sidewalk & Ramps - 4" thick, complete in place
SF
5,000
$ 3.40
$ 17,000.00
I l
ADA Ramps - Detectable Warning Surfaces, complete in place
EA
4
$ 500.00
$ 2,000.00
Street Construction Concrete Pavement Items Subtotal
$ 132,307.10
Storm Sewer Construction Items -
12
24" HOPE Pipe, complete in place (Structural)
LF
231
$ 40.00
$ 9,240.00
13
Curb Inlet - 10' wide, complete in place
EA
I
$ 3,000.00
$ 3,000.00
14
TV Testing and Inspection, complete in place
LF
231
$ 2.00
$ 462.00
Storm Sewer Construction Items Subtotal
$ 12,702.00
Page 1 of 3
Spring Creek Townhomes Phase 3
Engineer's Estimate of Construction
Concrete Pavement Option
Item
Description
Unit
Estimated
uantit
Unit Price
Total
Water Construction Items
15
8" C900 Water Pipe w/tracer wire - Structural Backfill, complete in place
LF
141
$ 26,00
$ 3,666.00
16
8" C900 Water Pipe w/tracer wire - Non -Structural Backfill, complete in place
LF
331
$ 24.00
$ 7,944.00
17
6" C900 Water Pipe w/tracer wire - Structural Backfill, complete in place
LF
245
$ 22.00
$ 5,390.00
18
6" C900 Water Pipe w/tracer wire - Non -Structural Backfill, complete in place
LF
38
$ 20.00
$ 760.00
19
4" C900 Water Pipe w/tracer wire - Structural Backfill, complete in place
LF
133
$ 23.00
$ 3,059.00
20
Fire Hydrant Assembly (w/ valve, vert. extension), complete in place
EA
1
$ 3,500.00
$ 3,500.00
21
Connect to Existing Water Line
EA
2
$ 300.00
$ 600.00
22
6" M.J. Gate Valve, complete in place
EA
1
$ 850.00
$ 850.00
23
4" M.J. Gate Valve, complete in place
EA
1
$ 650.00
$ 650.00
24
8" x 8" M.J. Tee, complete in place
EA
1
$ 550.00
$ 550,00
25
8" x 6" M.J. Tee, complete in place
EA
1
$ 500.00
$ 500.00
26
8" x 6" M.J. Reducer, complete in place
EA
1
$ 250.00
$ 250.00
27
8" x 4" M.J. Reducer, complete in place
EA
1
$ 200.00
$ 200.00
28
4" x 45' M.J. Bend, complete in place
EA
1
$ 300.00
$ 300.00
29
1" Water Service, > 15 ft (avg length = 50 ft)
EA
1
$ 1,000,00
$ 1,000.00
30
1.5" Water Service, < 15 ft (avg length = I ft)
EA
14
$ 800.00
$ 11,200.00
31
1.5" Water Service, > 15 ft (avg length = 49.5 ft)
EA
5
$ 1,200.00
$ 6,000.00
32
2" Blowoff Assembly, complete in place
EA
I
$ 750.00
$ 750.00
33
Waterline Testing
LS
I
$ 500.00
$ 500.00
Water Construction Items Subtotal
$ 47,169.00
Page 2 of 3
Spring Creek Townhomes Phase 3
Engineer's Estimate of Construction
Concrete Pavement Option
Item
Description
Unit
Estimated
Quantity
Unit Price
Total
Sanitary Sewer Construction Items
15
6" PVC Sewer Line - D3034 -Structural Backfill, complete in place
LF
548
$ 20.00
$ 10,960.00
16
6" PVC Sewer Line - D3034 -Non-Structural Backfill, complete in place
LF
48
$ 18.00
$ 864.00
17
6" PVC Sewer Line - ASTM D-2241 - Structural Backfill, complete in place
LF
20
$ 20.00
$ 400.00
18
4" Sewer Service -Single (avg. length = 6 ft), complete in place
EA
I
$ 300.00
$ 300.00
19
4" Sewer Service -Double (avg length = 3 ft), complete in place
EA
5
$ 400.00
$ 2,000,00
20
4" Sewer Service -Single (avg length = 73 ft), complete in place
EA
1
$ 850.00
$ 850.00
21
4" Sewer Service -Double (avg length = 48 ft), complete in place
EA
12
$ 950.00
$ 11,400.00
22
Tie -In to Existing 8" PVC Sewer Line, complete in place
EA
I
$ 500.00
$ 500.00
23
Concrete Manhole - T Dia. - complete in place
EA
3
$ 2,800.00
$ 8,400.00
24
TV Testing and Inspection, complete in place
LF
616
$ 2.00
$ 1,232.00
Sanitary Sewer Construction Items Subtotal
$ 36,906.00
General Items Subtotal
$
8,360.00
Street Construction Concrete Pavement Items Subtotal
$
132,307.10
Storm Sewer Construction Items Subtotal
$
12,702.00
Water Construction Items Subtotal
$
47,169.00
Sanitary Sewer Construction Items Subtotal
$
36,906.00
TOTAL CONSTRUCTION1
$
237,444.10
,00 OF
JCSEPH P, SCHULfZ
U. ...00.4.4.." ..... A..
8588
F-12327 74,1
SCHULTZ, ENGINEERING. I.I.C.
Page 3 of 3