HomeMy WebLinkAboutStaff Commentsv 14 CITY OF COLLEGE STATION Hoene ofTexerAdM University' MEMORANDUM July 11, 2013 • ^ 0 TO: Wallace Phillips, Spring Creek CS Development LTD; via: Wallace.phillips@verizon.net I/1 FROM: Jason Schubert, AICP, Principal Planner SUBJECT: SPRING CREEK TOWNHOMES PH 3 (FP) Thank you for the submittal of your FINAL PLAT - RESIDENTIAL application. This project will be distributed to staff next week for their review. _ PC: Joe Schultz, Schultz Engineering, L.L.C.; via: joeschultz84@verizon.net P&DS Project No. 13-00900138 Pleucning & Development Services P.O. BOX 9960 . 1101 TEXAS AVENUE • COLLEGE SUA110N -TEXAS • 77542 TEA,, 979.764.3570 • FAX. 979.764.349E cst%gov/devservices CITY OF COLUGF_ S1t1r10N Nome of Texas AcW University' MEMORANDUM TO: Wallace Phillips, Spring Creek CS Development LTD; via: ✓ Wallace.phillips@verizon.net FROM: Jenifer Paz, Staff Planner SUBJECT: SPRING CREEK TOWNHOMES PH 3 (FP) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by any Monday at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Parkland Development fees in the amount of $15,204 must be submitted prior to the filing of the final plat; One (1) set of Construction Documents Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.estx.gov/p Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: Joe Schultz, Schultz Engineering, L.L.C.; via: joeschultz84@verizon.net� P&DS Project No. 13-00900138 Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE - COLLECT STATION -'11 XAS • 77,843 'ITT. 979.764.3570 • PAX. 979.764.3496 csb(.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Spring Creek Townhomes Ph 3 (FP) (13-00900138) PLANNING 1. Please remove note 3.B. It is not applicable to this phase. 2. Notes 5 and 11 should reference Phase 3. Please revise. 3. Parking must be located outside of the right-of-way and meet the dimensional standards. 4. Parkland development fees for this project are $15,204 ($362 x 42 lots). Fees will be due prior to the filing of the plat. 5. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. 6. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Jenifer Paz Date: July 19, 2013 ENGINEERING COMMENTS NO. 1 Plat 1. Label the approximate ROW width along Decatur Dr. 2. Please label the existing easements adjacent to this phase. 3. Label the PUE in Common Area #4 that is next to Lot 16, Block 5. The previous plat indicated that it was dedicated by separate instrument. 4. Curve C5 is missing from the curve table. Construction Documents 5. Sh.1 - Provide detail showing the street sign names and blocks as they should appear on the signs. 6. Sh.2 - Please provide the sidewalk connection on south side of Dawn Lynn Dr. between Heath Dr. and the end of the culdesac. 7. Sh.2 - The match point where Heath Dr. and Dawn Lynn Dr. looks like it should be Sta.1+10 on Dawn Lynn Dr. 8. Sh.2 - The culdesac is required to have a minimum 100-ft diameter right-of-way and an 80-ft pavement diameter. 9. Please include a standard detail for street signs. 10. Sh.3 - How is the cross -lot drainage be handled? 11. Sh.5 - It may be easier to use an 8"x6" tee and one 6"x4" reducer rather than the 8"x8" tee. 12. Sh.5 - The valve on the 4-inch line would probably be better on the 8-inch leg running down Heath Dr. in order to minimize service outages if maintenance is everneeded. 13. Sh.5 - On the 8-inch profile drawing, the fire hydrant is shown below grade. 14. Sh.5 - Please revise Note #4 to indicate that C900 is required rather than C909. 15. Sh.5 - There should be two valves at the fire hydrant tee. 16. Sh.5 — The as -built drawings from Phase 2 shows an 8-inch stub -out to the future Phase 3 along Heath Dr. rather than a 6-inch waterline. 17.Sh.6 — (S-1 Profile) The as -built drawings show the existing stub -out flowline is 265.25. Please revise if needed. 18. Sh.6 — The sanitary sewer services should be no deeper than 3.5-ft. Please add a note indicating this and adjust flowlines that are exceeding that depth. 19.Sh.6 — A note should be added that this development is in the Spring Creek Sewer Impact Fee area. 20. Please show the proposed streetlights, transformers, and any other electrical infrastructure. 21. FYI... Additional Development Permit Fee in the amount of 1 % of the total public infrastructure cost will be required. 22. Please provide a copy of the NOI. 23. Water Report — The report should reference C900 rather than C909. 24. Sanitary Sewer Report — The minimum design slope for an 8-inch SS pipe is now 0.55%. Please revise. 25. Drainage Report — Please provide HGL exhibit. 26. Drainage Report — It doesn't appear that the minimum 2.5 fps velocity is being provided in Pipe 6. Can this be revised? If not, please note it in the Letter of Acknowledgment. Reviewed by: Erika Bridges Date: July 22, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Electric will require a site plan with building footprints tc accurately size and place transformers and/or pedestals. 2. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan with building footprints as soon as it is available. Email to: gmartinez(a cstx.gov. 3. METERING: Townhomes will be individually metered. Each townhome will have a single meter and service conduit/conductor route. 4. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 5. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. 6. EASEMENTS: Additional 5' PUE's may be required running between designated lot lines for street lighting circuits Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on electric layout. 7. EASEMENTS: Where easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. - GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 5. Developer pours electric device pads or footings, i.e. pull boxes, or other device, per CSU specs and design. 6. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 7. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, lighting, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 8. To discuss any of the above electrical comments please contact Gilbert Martinez at 97_9.764.6255. Reviewed by: Gilbert Martinez SANITATION 1. Sanitation is ok with this project. Date: July 19, 2013 Reviewed by: Wally Urrutia Date: July 17, 2013 44 7 f �y ,r w CITY OF COURGE STATION Home of Texas A&M Univenity` MEMORANDUM August 23, 2013 TO: Wallace Phillips, Spring Creek CS Development LTD; via:"/ Wallace.phillips@verizon.net FROM: Jenifer Paz, Staff Planner SUBJECT: SPRING CREEK TOWNHOMES PH 3 (FP) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11"x17" copies of the revised final plat (IF GOING TO P&Z); Parkland Dedication in the amount of $15,204 must be submitted prior to the filing of the final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal(@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Joe Schultz, Schultz Engineering, L.L.C.; via: joeschultz84@verizon.ne P&DS Project No. 13-00900138 Planning d Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE S I'M ION • 'IT_.XAS • 77842 TL.I.. 979.764.3570 • FAX. 979.76-1.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: SPRING CREEK TOWNHOMES PH 3 (FP) - 13-00900138 PLANNING 1. Curve lines C7, C10 & C12 appear to be overlapped when printed. Please make revision. 2. Please add a note that the parking area will be under the ownership of the Homeowner's Association, which will be responsible for the rules, regulations, enforcement and maintenance of the parking areas. Reviewed by: Jenifer Paz Date: August 22, 2013 ENGINEERING COMMENTS NO. 2 3. FYI ... It may be helpful for future home builders to add a note to the plat regarding lot grading to accommodate cross -lot drainage. 4. FYI ... The plans may be turned in for stamping once the electrical design has been incorporated. 5. FYI... The Development Permit fee balance is $1,809.16 based on the current cost estimate. This may be submitted by the contractor along with the NOI when they come to sign the Development Permit. 6. FYI ... The public infrastructure must be constructed or surety provided for it prior to the plat being scheduled for a P&Z meeting. Reviewed by: Erika Bridges Date: August 22, 2013