Loading...
HomeMy WebLinkAboutStaff Commentst' r r CITY OF COLIFGE STATION Home of'TexasA&M University' MEMORANDUM July 5, 2013 TO: Diane Hassel, Texas A&M Research Foundation; via: dhassel@tamus.edu ✓ FROM: Jason Schubert, AICP, Principal Planner SUBJECT: GRAHAM ROAD INDUSTRIAL PARK II (FP) Thank you for the submittal of your FINAL PLAT - COMMERCIAL application. This project will be distributed to staff next week for their review. PC: Joe Schultz, Schultz Engineering, L.L.C.; via: joeschultz84@verizon.net P&DS Project No. 13-00900136 Planning d-Developaurnt Services P.O. BOX 9960 • t I01 TEXAS AVENUE • COL ITGE. STATION • TEXAS • 77842 TEL 979.764, 3570 • PAX. 979.764.3496 cstu.govldevservices CITY OF COI:.I..13GF STATION Home of Texas A&M University' MEMORANDUM July 16, 2013 TO: Diane Hassel, Texas A&M Research Foundation; via: dhassel@tamus.edu V/ FROM: Teresa Rogers, Staff Planner SUBJECT: GRAHAM ROAD INDUSTRIAL PARK II (FP) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by any Monday at 10:00 a.m., your project will be administratively approved and placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; One (1) Mylar original of the revised final plat (required after approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittal acstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Please note that a Mylar original of the revised final plat will be required after approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: Joe Schultz, Schultz Engineering, L.L.C.; via: joeschultz84@verizon.net P&DS Project No. 13-00900136 Planning & Development Services P.O. BOX 9960 • I I01 TEXAS AVENUE • C;OI,I,F(;F. S"CATION • TFXAS • 7)842 TEL. 979.764.3570 • FAX. 979.764.3496 cst)(.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Graham Road Industrial Park II (FP) (13-00900136) PLANNING 1. This plat qualifies as a Minor Replat, which requires only administrative approval. In addition, the fee for a Minor Replat is $700 instead of $932. If you would like this plat to be considered minor please submit written verification and you will be reimbursed the difference between the two fees. 2. If you proceed with a Minor Replat, remove the Certificate of Planning and Zoning Commission and replace it with Certificate of City Planner. 3. If you proceed with a Minor Replat, revise the title block to state "Minor Plat" instead of "Final Plat". 4. Remove "and/or Engineer" from the Certificate of Surveyor title. 5. Revise the Certificate of County Clerk to state "Official Records" instead of "Deed Records" as this was a typo in the Unified Development Ordinance. 6. Correct spelling of "Hibicus Street" to "Hibiscus Street". 7. For Graham Road Business Park, replace "2.58 acre tract" with "Lot 1, Block 1" since the property has been platted. 8. Label the volume and page number of the abandonment for Hibiscus Street. 9. Note construction and maintenance responsibilities for the access easement on the plat. 10. Label the access easement as public or private on the plat. I am assuming it will be private; however based on the label provided in the legend it is proposed as a public access easement. Please verify this information. 11. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 12. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Teresa Rogers Date: July 12, 2013 ENGINEERING COMMENTS NO. 1 1. Please specify the width of the PUE (V.319, P.817) along Graham Rd. 2. What infrastructure is proposed to be in the 15-ft PUE adjacent to access easement? Why doesn't this easement connect straight into the existing PUE along Graham? 3. Based on the location of the 50-ft Access Easement, a driveway in that location would not meet driveway spacing. Please revise. Reviewed by: Erika Bridges Date: July 15, 2013 TRANSPORTATION 1. Revise the plat to show right-of-way dedication of 3.5 feet along Graham Road. Reviewed by: Joe Guerra, AICP, PTP Date: July 16, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: sweidoecstx.gov LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. The following easements will be required: • 10' PUE along plan East property line. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: July 9, 2013 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: July 10, 2013 STAFF REVIEW COMMENTS NO. 1 Project: Graham Road Industrial Park II (FP) (13-00900136) PLANNING pry(CCXVO This plat qualifies as a Minor Replat, which requires only administrative approval. In lnd addition, the fee for a Minor Replat is $700 instead of $932. If you would like this plat to be considered minor please submit written verification and you will be reimbursed the difference between the two fees. Written verification is being submitted with this response to comments. J2. If you proceed with a Minor Replat, remove the Certificate of Planning and Zoning Commission and replace it with Certificate of City Planner. The certificate of Planning and Zoning Commission has been removed and replaced with the certificate of City Planner. ✓3. If you proceed with a Minor Replat, revise the title block to state "Minor Plat" instead of "Final Plat'. The title block has been revised to state "Minor Plat". V4. Remove "and/or Engineer" from the Certificate of Surveyor title. "And/Or Engineer" has been removed from the Certificate of Surveyor Title. �5. Revise the Certificate of County Clerk to state "Official Records" instead of "Deed Records' as this was a typo in the Unified Development Ordinance. "Deed Records" has been revised to "Official Records" in the Certificate of County Clerk. /6. Correct spelling of "Hibicus Street' to "Hibiscus Street'. The spelling of Hibiscus Street V has been revised. J7. For Graham Road Business Park, replace '2.58 acre tract' with "Lot 1, Block 1" since the property has been platted. "2.58 Acre Tract" has been revised to Lot 1, Block 1. J8. Label the volume and page number of the abandonment for Hibiscus Street. Hibiscus Street was not part of this tract and may not be abandoned. A volume and page is not known for the abandonment of Hibiscus Street. Abandoned has been removed from plat. 9. Note construction and maintenance responsibilities for the access easement on the plat. Note #8 has been added to the notes. ✓10. Label the access easement as public or private on the plat. I am assuming it will be private; however based on the label provided in the legend it is proposed as a public access easement. Please verify this information. The access easement has been labeled private and the legend has been updated. 11. lease note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. A 15' PUE has been added on the east side of the property for a future water line fire hydrant stub. V/12. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Noted. Reviewed by: Teresa Rogers Date: July 12, 2013 EN,INEERING COMMENTS NO. 1 Please specify the width of the PUE (V.319, P.817) along Graham Rd. The PUE along / Graham Rd. varies in width. The label has been revised. 12 What infrastructure is proposed to be in the 15-ft PUE adjacent to access easement? Why doesn't this easement connect straight into the existing PUE along Graham? The 15 FT PUE adjacent to the access easement is for a future potential water line loop. The easement has been revised to connect straight into the existing PUE. OBased on the location of the 50-ft Access Easement, a driveway in that location would not meet driveway spacing. Please revise. Per the Graham Road Industrial Park Phase 1 Final Plat (9724/232) the driveway closest to the access easement will be removed and relocated when Phase 2 of Graham Road Industrial Park is platted and the Phase 2 access driveway is constructed. We are platting the easements because they are included on this lot, however, the driveway will not be constructed until Phase 2 of the Graham Road Industrial Park is platted. See Note 8 on the attached Phase 1 Final Plat for Graham Road Industrial Park. This note addresses the driveway spacing issue. — &,di ku^t, fr'�W�.y (how &, rA1CWer%+ ov.)✓W... how w0i D/w ►x reMoved? — GrO55 CA CGS v-A5 + V2W I+ to %Wvp loC&h' uvx Reviewed by: Erika Bridges Date: July 15, 2013 TRANSPORTATION /1. Revise the plat to show right-of-way dedication of 3.5 feet along Graham Road. The plat vvv has been revised to show 3.5 feet along Graham Road dedicated as Right -Of -Way. Reviewed by: Joe Guerra, AICP, PTP Date: July 16, 2013 v/ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: sweidoCo)cstx.00v Noted. 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. Noted. 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. Noted. 4. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. Noted. 5. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. Noted. 6. The following easements will be required: • 10' PUE along plan East property line. A 10' PUE has been added along the east property line. GENERAL ELECTRICAL COMMENTS l� 1. Developer installs conduit per CSU specs and design. Noted. 2. CSU will provide drawings for electrical installation. Noted. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. Noted. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. Noted. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. Noted. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. Noted. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. Noted. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. Noted. 9. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Noted. Reviewed by: Sam Weido Date: July 9, 2013 j SANITATION 1. Sanitation is ok with this project. Noted. Reviewed by: Wally Urrutia Date: July 10, 2013 STAFF REVIEW COMMENTS NO. 2 Project: Graham Road Industrial Park II (FP) (13-00900136) ENGINEERING COMMENTS NO. 2 Since the proposed easement on the east side of Lot 1 is for a future waterline extension, it should be a minimum 15-ft wide. The easement on the east side of Lot 1 cannot be made a 15' wide easement due to the existing building that runs parallel to Hibiscus Street. The existing building is approximately 13.5' from the property line 2. Please add a note indicating that the owner will extend water and access to the north with future Phase 2 development. Note #9 has been added to the plat. 3. Please provide a letter from the adjacent property owner acknowledging that their eastern driveway will be removed and a cross -access driveway extended to the adjacent property when the Phase 2 driveway is constructed. Any parking that is removed through the extension of this driveway may need to be replaced elsewhere on site. Attached is a letter from the adjacent property owner and an agreement signed when the adjacent land was sold. 4. Please add a note, similar to Note #8 from the first phase plat, referencing the driveway consolidation with Phase 2. Note 10 has been added to the plat. Reviewed by: Erika Bridges Date: July 25, 2013 TRANSPORTATION FYI: When site planning, the driveway spacing requirement is 235' for a Major Collector (Graham Road). Verify the spacing requirement will be met as close as possible and adjust the location of the access easement on Lot 1 Blockl if necessary. Additionally, ensure cross access will tie into Phase I of the Graham Road Industrial Park in anticipation of the removal or consolidating of the two existing driveways into one. The driveway spacing was previously approved with the Graham Road Industrial Park Preliminary Plat $ Final Plat of Phase 1. The spacing of the driveways was determined to be as close as possible to the driveway spacing requirements and also was done to allow as much offset from Westfield Drive as possible. Cross access and removal of the eastern driveway will be taken care of with the development of Phase Z per the notes on the previous plats and the notes added to this plat. Reviewed by: Joe Guerra, AICP, PTP Date: July 25, 2013