Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimates
Item# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 the LOFTS at WOLF PEN CREEK Engineer's Estimate -Public Sanitary Sewer Jun-08 Description Quantity Erosion & Sediment Control 1 Remove Existing Manhole & Backfill Trench with Select Fill Density Controlled 3 Remove Existing Manhole & Replace with new MH 1 Drop Sanitary Sewer Manhole (0-12') 1 Drop Sanitary Sewer Manhole (15') 1 Std . Sanitary Sewer Manhole 3 8" PVC SOR 26 ASTM 03034 Sanitary Sewer - NON Structural Backfill (0-8') 25 8" PVC SOR 26 ASTM 03034 Sanitary Sewer - NON Structural Backfill (8-12') 371 8" PVC SOR 26 ASTM 03034 Sanitary Sewer - NON Structural Backfill (12-15') 321 8" PVC SOR 26 STM 03034 Sanitary Sewer- Structural Backfill (8'-12') 102 8" Ductile Iron Pipe (C151 CL250) 18 8" PVC SOR 26 ASTM 02241 Sanitary Sewer - Non-Structural Backfill (8-12') 53 Remove 6" & 8" VCT lines & Backfill Trench with Select Fill Density Controlled 926 Reconnect Service Lines 2 Connect to Existing System 3 Remove 15" VCT Sanitary Sewer Line 20 Plug 15" VCT Sanitary Sewer Line 2 Trench Safety 890 Sanitary Sewer Subtotal Units Unit Price Price LS $3,000 $3,000 EA $1,500 $4,500 EA $1,000 $1,000 EA $4,000 $4,000 EA $5,500 $5,500 EA $2,500 $7,500 LF $40 $1,000 LF $45 $16,695 LF $65 $20,865 LF $75 $7,650 LF $30 $540 LF $55 $2,915 LF $50 $46,300 EA $500 $1,000 EA $1,500 $4,500 LF $100 $2,000 EA $1,000 $2,000 LF $6 $5,340 $136,305 '""'i the LOFTS at Wolf Pen Creek Engineer's Estimate for Public Infrastructure ONSITE Jun-08 Item# Description Quantity Units Unit Price Price Water Items 1 12" PVC C909 Water Line with Structural Backfill 15 LF $65 $975 2 12" PVC C909 Water Line with Non-Structural Backfill 77 LF $55 $4,235 3 8" PVC C909 Water Line with Structural Backfill 817 LF $50 $40,850 4 8" PVC C909 Water Line with Non-Structural Backfill 1097 LF $40 $43,880 5 6" PVC C909 Water Line with Structural Backfill 185 LF $45 $8,325 6 6" PVC C909 Water Line with Non-Structural Backfill 385 LF $35 $13,475 7 Fire Hydrants 6 EA $3,500 $21,000 8 Connect to Existing System 2 EA $1 ,500 $3,000 9 6"x6" Tee 1 EA $300 $300 10 6"-45 deg MJ bends 2 EA $300 $600 11 6" MJ Gate Valve w/ Lock Lid 1 EA $750 $750 12 8" DIP 18 LF $65 $1 ,170 13 8"-45 deg MJ bends 18 EA $300 $5,400 14 8" -90 deg MJ bends 1 EA $300 $300 15 8" -22.5 deg MJ bends 3 EA $300 $900 16 2" Air Release Valve 1 EA $2,500 $2,500 17 8"x8" -Tee EA $500 $500 18 8"x8" -Cross EA $500 $500 19 8"x6" MJ Reducer 1 EA $400 $300 20 8"X6" Tee 5 EA $400 $2,000 21 8" MJ plug 1 EA $500 $500 22 8" -11 .25 deg MJ bends 6 EA $300 $1,800 23 8" MJ Gate Valve 12 EA $1,000 $12,000 24 8"x1 .5" MJ Tapping Sleeve & Valve 1 EA $300 $300 25 12"x12" Tee 2 EA $800 $1,600 26 12"x8" Tee 1 EA $800 $800 27 12"x6" MJ Reducer 2 EA $500 $1,000 28 12"x8" MJ Reducer 2 EA $500 $1,000 29 12" Plug & Blowoff 1 EA $1 ,000 $1,000 30 12" MJ Gate Valve 1 EA $1,500 $1,500 31 12" -45 deg MJ bends 2 EA $500 $1,000 32 20" Diameter Steel Encasement 23 LF $150 $3,450 33 Trench Safety 2594 LF $6 $15,564 34 Remove Existing 8" Plug w/ 2" Blowoff EA $250 $250 35 Remove Existing 8" Plug & Connect to Existing System EA $1,500 $1 ,500 Water Subtotal $194,224 Drainage Items 36 30" RCP CUii ASTM C76 Storm Drain Pipe with Structural Backfill 225 LF $100 $22,500 37 36" RCP CUii ASTM C76 Storm Drain Pipe with Non-Structural Backfill 55 LF $120 $6,600 38 36" RCP CUii ASTM C76 Storm Drain Pipe by dry bore 61 LF $750 $45,750 39 30" Junction Box 2 EA $2,500 $5,000 40 42" Junction Box 2 EA $3,500 $7,000 41 1 O' Recessed Inlet 1 EA $3,500 $3,500 42 18" RCP 1 LF $55 $55 43 Connect to Existing System 3 EA $3,000 $9,000 44 30" Winged Headwall w/ Dissipator Blocks 1 EA $10,000 $10,000 45 8" Dry Rip Rap 26 SY $65 $1 ,690 Drainage Subtotal $111,095 Construction Costs $305,319 the LOFTS at WOLF PEN CREEK Engineer's Estimate -Public Sanitary Sewer Jan-08 Item# Description Quantity Units Unit Price Price Sanitary Sewer Items Erosion & Sediment Control LS $3,000 $3,000 2 Remove Existing Manhole & Backfill Trench with Select Fill Density Controlled 3 EA $1 ,500 $4,500 3 Remove Existing Manhole & Replace with new MH EA $1 ,000 $1 ,000 4 Drop Sanitary Sewer Manhole (0-12') EA $4 ,000 $4,000 5 Drop Sanitary Sewer Manhole (15') 1 EA $5,500 $5,500 6 Std. Sanitary Sewer Manhole 3 EA $2 ,500 $7,500 7 8" PVC SOR 26 ASTM 03034 Sanitary Sewer - Structural Backfill (0-8') 35 LF $40 $1,400 8 8" PVC SOR 26 ASTM 03034 Sanitary Sewer - Structural Backfill (8-12') 174 LF $45 $7,830 9 8" PVC SOR 26 ASTM 03034 Sanitary Sewer - Structural Backfill (12-15') 119 LF $55 $6,545 10 8" PVC SOR 26 ASTM 02241 Sanitary Sewer - Non-Structural Backfill (0-8') 44 LF $35 $1 ,540 11 8" PVC SOR 26 ASTM 02241 Sanitary Sewer - Non-Structural Backfill (8-12') 309 LF $40 $12,360 12 8" PVC SOR 26 ASTM 02241 Sanitary Sewer - Non-Structural Backfill (12-15') 137 LF $45 $6,165 13 Remove 6" & 8" VCT lines & Backfill Trench with Select Fill Density Controll ed 926 LF $50 $46,300 14 Reconnect Service Lines 2 EA $500 $1 ,000 15 Connect to Existing System 3 EA $1 ,500 $4,500 16 Remove 15" VCT Sanitary Sewer Line 20 LF $100 $2,000 17 Plug 15" VCT Sanitary Sewer Line 2 EA $1 ,000 $2,000 18 Trench Safety 818 LF $4 $3,272 Sanitary Sewer Subtotal $120,412