This letter is being written to document changes that were made to the Copper Falls
construction plans during permitting. We have noticed that the active TxDOT permit for
this project reflects the construction of a sidewalk along the SH6 frontage road. During
permitting, these sidewalks were allowed to be removed from the project by the City of
College Station, however the TxDOT permits were already in review and processing and
these changes were not relayed to TxDOT. As a result the active TxDOT permit does not
reflect this deletion.
During the permitting of the Copper Falls project there was discussion regarding the
requirement to construct sidewalks along the SH6 frontage road. Early in the permitting
there was not a requirement for sidewalks along highways or freeways. This requirement
then changed during processing of our project and sidewalks were required along SH6
frontage road. The requirement has been changed once again to delete the requirements
for sidewalks along highways/freeways.
Our TxDOT permit was submitted during the middle portion of this history wherein the
sidewalks were required and thus they show up on our permit. Since that time we have
modified our plans and those that are approved by the City of College Station took
advantage of the timeframe wherein sidewalks were not required.
Our intent with this letter is to simply put everyone on notice that the City reviewed and
stamped plans are those that will be constructed and they DO NOT include a sidewalk
along SH6 frontage. The TxDOT permit conflicts with this.
511 UNIVERSITY DRIVE EAST, SUITE 204 COLLEGE STATION, TX 77840 • T. 979.260.6963 • F. 979,260.3564
CIVIL ENGINEERING • HYDRAULICSHYDROLOGY UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS
info@milchellandmorgan.com v mnr itchellandmorgan.com
If we need to update our TxDOT permit drawings for clarity please let us know. We are
assuming that this letter will document that change for TxDOT's files and for Contractor
and City inspector clarification.
As always we appreciate your help on our projects.