Loading...
HomeMy WebLinkAboutCorrespondenceCarol Cotter From: Joel Mitchell [Joel@mitchellandmorgan.com] Sent: Friday, October 26, 2012 3:54 PM To: Carol Cotter Subject: Re: Copper Falls - Calculated 100 Year Water Surface The words "was unchanged." were lost .... If you want, I can send you the ras files (which are pretty neat) showing the little storage area and lateral structure, and then you can see the output hydrographs and calculations... but it just shows "no change" which is what you wanted to see in the first place. (and we'll have problems with Ass paths because the hydrological input is in a different directory....) Please call me if you want more stuff. Joel On Fri, Oct 26, 2012 at 1:44 PM, Carol Cotter <ccotter e,cstx.gov> wrote: Joel, Was something left off this email (yellow highlight)? I don't follow. Carol From: Joel Mitchell[mailto:ioel(&mitchellandmorgan.com] Sent: Thursday, October 25, 2012 11:20 AM To: Carol Cotter Cc: Veronica Morgan; James Batenhorst; Joaquin Jaramillo Subject: Copper Falls - Calculated 100 Year Water Surface Carol To best analyze the effect of the little bit of fill in the calculated water surface, I converted the HEC-RAS model to an unsteady model and modeled the effect of 1. the storage as a storage area, and 2. the effect of the new impervious cover as a separate hydrology analysis. I have attached the output table showing the post construction water surface and the pre -construction water surface. Per your request I have attached the grading plan which shows the erosion control plan. Please call me if you need something else. Thanks Joel On Tue, Oct 23, 2012 at 3:10 PM, Carol Cotter <ccotterna,cstx.gov> wrote: Hi Joel, When you send the email regarding the 1.1" rise in BFE, please include Grading and Erosion Control Plan so I can print one for Donnie's inspections. Thanks, Carol L. Cotter, P.E. 5r. Assistant City Engineer Planning & Development Services IIi7:T.SZl•I:Si1 1101 Texas Avenue 5 College Station, Texas 77842 9 Office: (979) 764-3570 Fax: (979) 764-3496 Email: ccotter@cstx.aov City of College Station Home of Texas A&M University City of College Station Home of Texas A&M University Joel Mitchell, P.E. Partner Mitchell & Morgan, LLP 511 University Dr. E., Ste. 204 College Station, TX 77840 (979) 260-6963 (office) (979) 260-3564 (fax) Every morning is the dawn of a new error. City of College Station Home of Texas A&M University Joel Mitchell, P.E. Partner Mitchell & Morgan, LLP 511 University Dr. E., Ste. 204 College Station, TX 77840 (979) 260-6963 (o,lice) (979) 260-3564 (kx) Carol Cotter From: Joel Mitchell [Joel@mitchellandmorgan.com] Sent: Thursday, October 25, 2012 11:20 AM To: Carol Cotter Cc: Veronica Morgan; James Batenhorst; Joaquin Jaramillo Subject: Copper Falls - Calculated 100 Year Water Surface Attachments: ComparePreVsPost.pdf; 1161-03-GP-Grading Plan Layoutl (1).pdf Carol To best analyze the effect of the little bit of fill in the calculated water surface, I converted the HEC-RAS model to an unsteady model and modeled the effect of 1, the storage as a storage area, and 2, the effect of the new impervious cover as a separate hydrology analysis. I have attached the output table showing the post construction water surface and the pre -construction water surface. As you can see, the impact of the timing of the hydrographs was greater than the little bit of lost storage such that the calculated 100 year water surface. Per your request I have attached the grading plan which shows the erosion control plan. Please call me if you need something else. Thanks Joel On Tue, Oct 23, 2012 at 3:10 PM, Carol Cotter <ccotter@cstx.gov> wrote: Hi Joel, When you send the email regarding the 1. V rise in BFE, please include Grading and Erosion Control Plan so I can print one for Donnie's inspections. Thanks, Carol L. Cotter, P.E. Sr. Assistant City Engineer Planning & Development Services 1101 Texas Avenue 5 College Station, Texas 77842 Office: (979) 764-3570 Fax: (979) 764-3496 Email: ccotter@cstx.aov City of College Station Home of Texas A&M University City of College Station Home of Texas A&M University Joel Mitchell, P.E. Partner Alilchell & Morgan, LLP 511 University Dr. E., Ste. 204 College Station, TX 77840 (979) 260-6963 (office_) (979) 260-3564 (fax) 9 Every morning is the dawn of a new error. F C�rYa- ii Re: Copper Falls Driveway and Decel Lane discussion 1 message Kerry Pillow <kerry@mitchellandmorgan.com> Veronica Morgan <veronica@mitchellandmorgan.com> Tue, Jun 12, 2012 at 5:39 PM Reply -To: v@mitchellandmorgan.com To: Chad Bohne <Chad.Bohne@txdotgov> Cc: James Batenhorst <james@mitchellandmorgan.com>, Joel Mitchell <joel@mitchellandmorgan.com>, Joaquin Jaramillo <joaquin@mitchellandmorgan.com>, Kerry Pillow <kerry@mitchellandmorgan.com> Chad, thank you very much for the response. i will include this email in my submittal back to the city of college station so that they know. Veronica On Tue, Jun 12, 2012 at 2:34 PM, Chad Bohne <Chad.Bohne@txdot.gov> wrote: Veronica ... Considering the use of the development, the associated trips, the full two lanes of the frontage road with shoulders and the geometry, a deceleration lane is not mandatory for this location. Chad >>> Veronica Morgan <veronica@mitchellandmorgan.com> 6/12/2012 12:29 PM >>> Chad, thanks for talking with me regarding our office building project. As you can see on the attached site plans and T1A letter we have very little traffic impact from this office use. If you could send me an email back for my records regarding your requirement (or not) for a decel lane on SH6 frontage for this project i would appreciate it. Veronica Veronica J.8 Morgan, P. E., CFM Managing Partner Mitchell & Morgan, LLP 511 University Dr. E., Ste. 204 College Station, TX 77840 (979) 260-6963 (office) (979) 260-3564 (fax) Hurricane Season: Hurricane Season is underwa y. Do you have a Personal Plan for your Visit www.txdot.gov/travel/hurricane. Veronica J. B Morgan, P. E , CFM Managing Partner Mitchell & Morgan, LLP 511 University Dr. E., Ste, 204 College Station, 7X 77840 (979) 260-6963 (office) family's safety? htm