Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
Copper Falls Executive Suites Public Infrastructure Engineer's Estimate August 2012 Item Description Unit Quantity Unit Cost Amount 1 Mobilization LS 1 $ 1,801.00 $ 1,801.00 2 Silt Fence & Erosion Protection LS 1 $ 2.000.00 $ 2,000.00 3 8" PVC Water Line (C909 CL200) LF 105 $ 40.00 $ 4,200.00 4 Connection to Existing System (Existing 8" Waterline) EA 1 $ 2,500.00 $ 2,500.00 5 8"x8" MJ Tee EA 1 $ 750.00 $ 750.00 6 8" Gate Valve w/ Box EA 1 $ 1,500.00 $ 1,500.00 7 8" x 45 degree M.J. Bend EA 4 $ 550.00 $ 2,200.00 8 8" x 6" M.J. Reducer EA 1 $ 450,00 $ 450.00 9 8" x 2" M.J. Tapping Tee EA 2 $ 500.00 $ 1,000.00 10 8" x 1" M.J. Tapping Tee EA 1 $ 400.00 $ 400.00 11 2" Water Service (type K copper) LF 7 $ 30.00 $ 210.00 12 1" Water Service (type K copper) LF 4 $ 25.00 $ 100.00 13 1" Water Meter w/ box EA 1 $ 100.00 $ 100.00 14 Meter Box Only EA 2 $ 25.00 $ 50.00 15 Standard Fire Hydrant AssemblyEA 1 $ 3,500.00 $ 3,500.00 16 Structural Backfill LF 105 $ 8.00 $ 840.00 17 Trench SafetyLF 105 $ 2.00 $ 210.00 Total $ 18,010.00 93631 �P g„Zy-�,drz ixx�r� ,#