Loading...
HomeMy WebLinkAboutCost EstimateCopper Falls Executive Suites Public Infrastructure Engineer's Estimate August 2012 Item Description Unit Quantity Unit Cost Amount 1 Mobilization LS 1 $ 1,801.00 $ 1,801.00 2 Silt Fence & Erosion Protection LS 1 $ 2.000.00 $ 2,000.00 3 8" PVC Water Line (C909 CL200) LF 105 $ 40.00 $ 4,200.00 4 Connection to Existing System (Existing 8" Waterline) EA 1 $ 2,500.00 $ 2,500.00 5 8"x8" MJ Tee EA 1 $ 750.00 $ 750.00 6 8" Gate Valve w/ Box EA 1 $ 1,500.00 $ 1,500.00 7 8" x 45 degree M.J. Bend EA 4 $ 550.00 $ 2,200.00 8 8" x 6" M.J. Reducer EA 1 $ 450,00 $ 450.00 9 8" x 2" M.J. Tapping Tee EA 2 $ 500.00 $ 1,000.00 10 8" x 1" M.J. Tapping Tee EA 1 $ 400.00 $ 400.00 11 2" Water Service (type K copper) LF 7 $ 30.00 $ 210.00 12 1" Water Service (type K copper) LF 4 $ 25.00 $ 100.00 13 1" Water Meter w/ box EA 1 $ 100.00 $ 100.00 14 Meter Box Only EA 2 $ 25.00 $ 50.00 15 Standard Fire Hydrant AssemblyEA 1 $ 3,500.00 $ 3,500.00 16 Structural Backfill LF 105 $ 8.00 $ 840.00 17 Trench SafetyLF 105 $ 2.00 $ 210.00 Total $ 18,010.00 93631 �P g„Zy-�,drz ixx�r� ,#