Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION Horne of TadsAdM University" 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 4, 2012 TO: Joel Mitchell, Mitchell & Morgan, LLP; via email: ioel(g-mitchellandmorgan.comv" FROM: Jason Schubert, AICP Principal Planner SUBJECT: COPPER FALLS EXECUTIVE SUITES (SP/NRA) I reviewed the above -mentioned SITE PLAN - COMMERCIAL and NON-RESIDENTIAL ARCHITECTURE STANDARDS application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: The Final Plat application must be accepted for review for this application to be forwarded for review as well. Please be aware that if this application is not completed before Monday, June 25, 2012, it will expire and a new application and fees will be necessary to continue the site development process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Case file No. 12-00500095 (SP) Case file No. 12-00500097 (NRA) CITY or CO7.LCGF. S'rKrION Hnnre r f Rvas 1I &A1 Uniucisifp` 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 21, 2012 TO: Joel Mitchell, Mitchell & Morgan, LLP; via email: joel(c)mitchellandmorgan.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: COPPER FALLS EXECUTIVE SUITES (SP/NRA) Thank you for the submittal of your SITE PLAN - COMMERCIAL and NON-RESIDENTIAL ARCHITECTURE STANDARDS application. Since you will be utilizing the plat application submitted to the City in 2008, this project will be distributed to staff this week for their review. cc: Eva Read -Warden, The Arkitex Studio, Inc.; via email: evaparkitex.com Case file No. 12-00500095 (SP) Case file No. 12-00500097 (NRA) ♦ 1 1101 Texas Avenue, P.O. Box 9960 C College Station, Texas 77842 Phone 979.764.3570 / Fax 979,764.3496 CITY OF COU N:GI+. STATION Honoru R' ,A&M Orin niry' MEMORANDUM May 30, 2012 TO: Joel Mitchell, Mitchell & Morgan, LLP; via email: ioel( mitchellandmorgan.com FROM: Morgan Hester, Staff Planner SUBJECT: Copper Falls Executive Suites (SP)- Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments; One (1) complete set of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set); Four (4) revised site and one (1) landscaping plan; Easement Dedication Sheet and required documents. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact me at 979.764.3570. Attachments: Staff review comments PC: Eva Read -Warden, The Arkitex Studio, Inc.; via email: eva@arkitex.com Case file #12-00500095 STAFF REVIEW COMMENTS NO. 1 Project: Copper Falls Executive Suites (SP) — 12-00500095 PLANNING 1. Please be aware that the property is not platted. Site plan approval cannot be granted until the plat has been filed. 2. Please be aware that the site plan needs to reflect the plat with all easements and lot configuration. The lots can be drawn as "potential' lots with setbacks in anticipation for the future replat. 3. Please revise parcel ownership to show that the property to the southwest is owned by Metro Mini Storage/College Station Ltd. 4. Please provide all volume and page numbers for PUEs that have been recorded and those that have not, leave blank. 5. Please be aware that the sign will be permitted separately. 6. Please show connectivity to the access easement located on the adjacent property to the south. 7. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Morgan Hester, Staff Planner Date: May 24, 2012 LAN DSCAPING/STREETSCAPING/BUFFER 1. Please remove the lot and block labels from the exhibit and calculate landscape points together. 2. The three canopy trees in the TxDOT Right -of -Way cannot be counted as landscape points. 3. Make a note that the undisturbed area is not included in the total area. 4. Please show the location of proposed and existing easements on or adjacent to property. 5. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 6. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Morgan Hester, Staff Planner ENGINEERING COMMENTS NO. 1 Date: May 24, 2012 1. Please provide a private drainage easement for storm sewer outfall from Lot 2 to Lot 3. 2. Please provide private utility easements for services crossing other lots. 3. If the "Future Water Meters" are being installed with this phase, please remove future from the label. It appears that at least the irrigation meter is being installed with this phase. 4. Please provide 5 copies of a TxDOT Access Permit. If TxDOT requires that a deceleration lane be built, a donation agreement would be required. 5. The Development Permit is currently under review. 6. Please have the contractor submit a copy of the Notice of Intent. 7. Please provide a drainage report. 8. Detention area should be noted on the site plan. 9. Please provide an engineer's estimate for all public infrastructure. Reviewed by: Danielle Singh Date: May 24, 2012 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. All easements on site are shown as proposed or existing. Electric facilities will be designed within proposed or existing easements as shown on site plan. 2. Proposed easements must be granted and filed before CSU can install and energize electric facilities. 3. CSU requires digital AutoCAD 2000 or later version of plat and site plan so electrical design for this project can be completed. Email to: gmartinez(ocstx.gov. 4. CSU electric design drawings supersede any and all electric distribution (up to the meter) designs shown on other construction documents. 5. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 6. Site plan shows 4-2" pvc conduits for electrical primary. That requirement will be changed to 2-2" pvc conduits for primary. Secondary (service) conduit will be 2-4" pvc conduits. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 5. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 26 weeks. 6. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer, meter location and conduit routing as designed by CSU. 7. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: May 25, 2012 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: May 29, 2012 TxDOT Comments 1. A right turn deceleration lane will be required if an access drive is permitted at this location. Reviewed by: Chad Bohne Date: May 25, 2012 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77642 Phone 979.764.3570 / Fax 979.764.3496 QTl' OP COH J iGl', STATION Nemr aJTiuuAdM Onirmity' MEMORANDUM October 1, 2012 TO: Joel Mitchell, Mitchell & Morgan, LLP; via email: joel@mitchellandmorgan.com FROM: Morgan Hester, Staff Planner SUBJECT: Copper Falls Executive Suites (SP) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $932 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Four (4) revised site plans One (1) landscaping plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Eva Read -Warden, The Arkitex Studio, Inc.; via email: eva@arkitex.com Case file #12-00500095 STAFF REVIEW COMMENTS NO. 2 Project: Copper Falls Executive Suites (SP) - 12-00500095 PLANNING COMMENTS NO. 2 1. Please provide the volume and page number (V10780, P11) for the 15' and 20' PUE located at the northwestern and southern property lines that was dedicated with the minor plat. 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. LAN DSCAPING/STREETSCAPING/BUFFER 1. Please label the size of existing and proposed easements on or adjacent to the property. Reviewed by: Morgan Hester Date: September 25, 2012 ENGINEERING COMMENTS NO. 3 Silt Fence delineation did not print on Grading and Erosion Control Plan. Were there any other measures being proposed (Inlet protection, construction exit)? Please indicate limits of structural fill on the water line. We are still waiting on TxDOT for return of Access Permit. Drainage Report — report indicates no increase in water surface elevations from increased runoff. Are there any impacts as a result of the fill? Reviewed by: Carol Cotter Date: October 1, 2012 FIRE 1. No combustibles will be allowed on site until all-weather roads and fire hydrants have been accepted by the City. 2. A site plan shall not show any part of a structure over one hundred and fifty feet (150') from an approved access road. 3. If a fire lane extends more than one hundred feet (100'), an approved turn -a -round or "T" will be required. Please extended shown Fire Lane on site plan to be in front of proposed building 1 and also in front of Future building 2. In order to meet the modified hammerhead for turning the fire vehicle around on site. 4. No more than a six percent (6%) grade is allowed on any length of fire lanes. 5. Fire lanes will be constructed using the "Fire Apparatus Turning Radius Template" and have a fire lane sign at the entrance. Curbs to be marked "Fire lane, No Parking, Tow Away Zone" with a minimum of four (4") letters. 6. A "Knox Box" security key system is required on all buildings and a Knox Switch is required on all gated entrances. 7. Commercial construction requires a fire hydrant within three hundred feet (300') from the main entrance and within four hundred and fifty feet (450') from any part of a structure. Reviewed by: Jerry Duffey, Deputy Fire Marshal Date: October 1, 2012 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. REPEAT: LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 2. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. 3. The developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 5. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: September 24, 2012 74 w a CITY OP COI LEGS STATION Hoare ofTexns Ad'M University" MEMORANDUM April 8, 2014 TO: Joel Mitchell, Mitchell & Morgan, LLP; via email: Joel c(D.mitchellandmorgan.com FROM: Morgan Hester, Staff Planner SUBJECT: Copper Falls Executive Suites (SP) — Landscape Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please submit the following for further staff review: City of College Station Transmittal Letter One (1) landscaping plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Pete Vanecek, Brazos Land Design; via email: pvanecek@brazoslanddesign.com Case file #12-00500095 Planning to Development Services P.O. BOX 9960 • I I01 9'Ex.4S AVENUE. • CiOLLEGE S TA'I'1ON • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 4 Project: Copper Falls Executive Suites (Landscape Plan) - 12-00500095 PLANNING 1. If the intent of this landscape plan is to replace the stamped plan on file, please provide the following information: • A title block providing the site address and legal description; • Zoning classification of the Copper Falls property and revisions of the adjacent properties; o Due to the recently updated zoning classifications, R-1 Single -Family is now GS General Suburban and C-1 General Commercial is now GC General Commercial. Please revise accordingly. 2. Based on the previously approved landscape plan, the site's proposed developed area is equivalent to 48,319.23 square feet. Please revise to show that adequate landscaping has been provided. 3. Please revise the streetscaping to reflect the street frontage width of the property minus any driveways is 286.17'. In order to determine the number of streetscape points required, this is divided by 50 and multiplied by 300 (286.17/50 x 300 = 1,717 points). Based on dividing the liner footage by 25 (286.17/25), 12 canopy trees are required for streetscaping. Please revise the calculations. 4. Please make a note that each cane of the crepe myrtles will be 1.25" caliper. 5. Please revise the following spelling of proposed landscape plants: • Ilex burfordii Additionally, please provide separation because the scientific and common names — commas, parenthesis, etc — to allow for better separation between the names and minimize confusion. 6. To count for the 10 points per shrub, shrubs must be 5 gallons in size, as they have been correctly shown in the planting schedule; however, on the plan, the following shrubs are called out to be 3 gallons: • Boxwoods, • Burford Hollies, • Compact Nandinas, • Dwarf Yaupons, • Gulf Muhly Grass, • Indian Hawthorns, and • Waxleaf Ligustrums Page 2 of 3 Please revise to eliminate confusion at installation and ensure that all points will be satisfied. 7. Thirty-one (31) Dwarf Yaupons are listed in the planting schedule, but thirty-seven (37) are shown on the plan. Please revise. 8. The Sea Green Juniper in the north corner (adjacent to the 3 Crepe Myrtles) was not called out. Please revise. 9. If the two (2) Pecan trees are proposed plantings, please include them in the planting schedule and corresponding points as they have not been listed. 10. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Morgan Hester Date: April 8, 2014 Page 3 of 3 a CITY Or COLLEGE STATION Home of Texas A6'M University' MEMORANDUM N-j April 10, 2014 TO: Joel Mitchell, Mitchell & Morgan, LLP; via email: ioel(a)mitchellandmorgan.com/ FROM: Morgan Hester, Staff Planner SUBJECT: Copper Falls Executive Suites (SP) — Landscape Plan Thank you for your revisions of the landscape plan. This revision will be stamped for approval and will replace the previously approved landscape plan. If you have any questions or need additional information, please call me at 979.764.3570. cc: Pete Vanecek, Brazos Land Design; via email: pvanecek@brazoslanddesign.com Case file #12-00500095 Planning d' Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGL STKI10N • TEXAS -';77342 TEL 979.764.3570 - PAX. 979.764.3496 csticgov/d evs ervices (W CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 4, 2012 TO: Mitchell & Morgan, c/o Joel Mitchell, PE; via email: joel@mitchellandmorgan.com FROM: Danielle Singh SUBJECT: Engineering Document Comments for Copper Falls Executive Suites (DP) Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, DATE, at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call Danielle at 979.764.3570. Attachments: Staff review comments PC: The Arkitex Studio, Inc. c/o Eva Reed -Warden; via email: eva@arkitex.com Case File No. 12-500095 ENGINEERING COMMENTS NO. 2 1. Please provide a drainage report. 2. Please provide an engineer's estimate for the public infrastructure. 3. Please provide 5 copies of a TxDOT Access Permit. If TxDOT requires that a deceleration lane be built, a donation agreement will be required. 4. Please provide a private drainage easement for the storm sewer outfall from Lot 2 to Lot 3. 5. Please provide private utility easements for services crossing other lots. 6. Please submit a Notice of Intent. 7. On the Curb Inlet Section on Sheet UP, please label the material (or space) between the 36" deep river gravel and the 6" PVC. 8. Please add a note that the sanitary sewer service will not be left more than 3.5' deep at the point of terminus by the Developer's contractor. 9. Please add a note that the water services will be left at 1' maximum bury at the point of terminus. An angle ball valve is required at the point of terminus. 10. If possible, it is preferred to use two 45-degree bends in lieu of a 90-degree bend on the waterline. 11. Please add an in -line valve north of the 8"x8" tee. 12. Please provide an erosion control plan. 13. On the grading plan, please label the flow lines and slope of the 12" PVC outfall. 14. On some of the sheets the development is labeled as Cypress Falls and some it is labeled as Copper Falls. I assume it should be Copper Falls according to the site plan application. Reviewed by: Danielle Singh Date: 6/1/2012