Loading...
HomeMy WebLinkAboutDrainage AnalysisCOPPER FALLS EXECUTIVE SUITES DRAINAGE ANALYSIS September 2012 Prepared for: 1999 PROPERTIES GP, LLC 511 UNIVERSITY DRIVE EAST, SUITE 204 COLLEGE STATION, TX 77840 (979)260-6963 Submitted to CITY OF COLLEGE STATION the heart of the Rewarch Why By MITCHELL 1I MORGAN ENGINEERS & CONSTRUCTORS 511 UNIVERSITY DRIVE, SUITE 204 COLLEGE STATION, TX 77840 OFFICE (979) 260-6963 FAx (979) 260-3564 The purpose of this detention is to help reduce flows to even less than the existing flowrates. This is in an effort to assure no negative impacts occur from the development given the proximity to older residential structures. ,k EXISTING & PROPOSED 100 YEAR WATER SURFACE Even though the FEMA map does not indicate a 100-year floodplain on the property, we did calculate a 100-year storm water surface within the tributary on the lot. The 100-year water surface for the unnamed tributary to Bee Creek Tributary A was calculated using a steady-state hydraulic model in HEC- ®' RAS. Hydrographs for Drainage Areas 1, 2, and 3 were combined to calculate the peak flow draining !! through the northeast side of the property. This combined flow was used to represent the peak 2-, 5- r, 10-,25-,50-, 100-, and 500- year peak flows in the Upper Reach in the RAS model. The two drainage areas (MMLot and Minis) corresponding to the parking lot and the Metro Mini -storage lot were 6 combined to calculate the peak flow for the MaM Reach in the HEC-RAS model. The entire HEC-RAS Model is included on the attached CD. The calculated 100-year water surface elevation results are shown in Table 3 while a figure of the same 100-year water surface can be seen in Exhibit 4 for the existing conditions scenario. There is an existing culvert on Mile Drive at cross section 40. The top of road elevation at this location is 267.00 feet and under existing conditions, the 10-, 100-, and 500-year storms overtop the Mile Dr culvert. The water surface elevation over the road for the 10-year storm is 267.05 ft and the 100-year storm is 267.50 ft, showing that there is 6 inches of water over the top of Mile Drive in the 100-year event. Table 3: Calculated 100-Year Water Surface Elevations (ft) Reach MaM MaM MaM MaM River>Sta 344.99 310.58 275.25 254.16 50% Storm `' 269.53 269.39 268.89 267.57 10% Storm 269.79 269.62 269.01 267.69 1 % Storm 270 269.79 269.11 267.79 0.20% Storm 270.14 269.92 269.2 267.87 Upper 204.09 269.44 270.05 270.58 270.93 Upper 181.15 269.31 269.89 270.38 270.72 Upper 155.69 269.2 269.72 270.15 270.43 Upper 89.11 268.64 269.07 269.45 269.71 Upper 29.89 267.44 267.96 268.46 268.82 Upper 14.65 266.72 267.23 26_Z 8 267.98 Lower 153.34 265.6 267.09 67.6 267.84 Lower 81.56 265.55 267.08 267.58 � 267.8 Lower 61.77 265.5 267.05 267.52' 267.73 Lower 16.49 261.26 261.67 262.09 262.38 Lower 5.20 261.22 261.67 262.12 262.44 Copper Falls Drainage Report Page 5 Alan Gibbs From: Alan Gibbs Sent: Friday, March 27, 2015 4:51 PM To: 'Gerry Brown' Cc: Erika Bridges; Terry Boriskie Subject: RE: 118 Mile Dr Attachments: 1471_001.pdf; 1470_001.pdf; 1469_001.pdf Gerry, Looking further at the adjacent Copper Falls Drainage Report, the 100 Yr (or 1%) water surface elevation through subject 118 Mile Drive tract was shown to range between 267.6 and 267.52 ft (excerpt attached - slightly varying from Exhibit 4 which we had been initially referencing). Also attached, I estimated this elevation on a map from our GIS layers with property and contours, as well as approximate proposed building improvements. There appears to be no footprint encroachment and even a 15+ ft buffer. That being the case, no additional submittal requirements will be necessary regarding drainage. Some conditions or recommendations will be noted on the Building Permit, such as no fill or obstacles (solid fencing, sheds, significant floatables) to drainage should be placed within -30 ft of the creek. Let us know if there are additional questions. Thanks, Alan Alan Gibbs, P.E., CFM City Engineer City of College Station From: Alan Gibbs Sent: Wednesday, March 25, 2015 5:13 PM To: 'Gerry Brown' Subject: 118 Mile Dr Gerry, I found information in the drainage report that may shed new light on our discussion. I'd suggest holding off reporting back to your client until I can get back to you. Alan Gibbs, P.E., CFM City Engineer City of College Station 1 COPPER FALLS EXECUTIVE SUITES DRAINAGE ANALYSIS September 2012 Prepared for: 1999 PROPERTIES GP, LLC 511 UNIVERSITY DRIVE EAST, SUITE 204 COLLEGE STATION, TX 77840 (979)260-6963 Submitted to 4 CITY OF COLLEGE STATION the tseart of the Research Valley By MITCHELL W MORGAN ENGINEERS & CONSTRUCTORS 511 UNIVERSITY DRIVE, SUITE 204 COLLEGE STATION, TX 77840 OFFICE (979) 260-6963 FAX (979) 260-3564 CERTIFICATION This report for the drainage design for Copper Falls Executive Suites was prepared under my supervision in accordance with provisions of the Bryan/College Station Unified Drainage Design Guidelines for the owners of the property. All licenses and permits required by any and all state and federal regulatory agencies for the proposed drainage improvements have been issued. oel J. itchell, P.E. Regi ered Professional Engineer St a of Texas No. 80649 .•460 ragas se•eaoa♦e•ei JOEL J. klITCHELL 064 '�'�'Pi°ee•�aaa•a 0 Copper Falls Executive Suites DRAINAGE ANALYSIS COPPER FALLS BUILDINGS, COLLEGE STATION, TEXAS INTRODUCTION The purpose of this report is to present an analysis of the following for the proposed Copper Falls buildings to be located on the SH 6 South frontage road northeast of the Texas Avenue and Deacon Drive intersection in College Station, Texas: • Site drainage design • Mapping for a calculated 100-year water surface in the un-named tributary of Bee Creek Tributary A. (This is not a FEMA mapped 100-year floodplain.) GENERAL LOCATION & DESCRIPTION The property for the proposed Copper Falls buildings is approximately 1.6 acres and is located on the SH6 southbound frontage road just northeast of Texas Ave. and Deacon Dr. The site location can be seen in the vicinity map in Exhibit 1. A copy of the FEMA FIRM showing the project location with respect to the floodplain is shown in Exhibit 2. Adjacent to this property is the Metro mini- storage facility on the SH6 southbound frontage road and a Burger King restaurant located at the corner of Texas Ave and Business 6. The property is currently undeveloped and will eventually be developed with office buildings and a shared parking lot which will include a subsurface detention facility located under the parking lot. In addition there is a proposed driveway culvert that will be constructed within the SH6 southbound frontage road right-of-way. Flow from this site will drain into an unnamed tributary of Bee Creek Tributary A. SITE DRAINAGE DESIGN DRAINAGE DESIGN CRITERIA All drainage design is in accordance with the Bryan/College Station Uniform Stormwater Design Guidelines (USDG). As such: • Design rainstorm events consist of the 2-, 10-, 25-, 50-, and 100-year, 24 hour duration hypothetical frequency storm events in order to analyze the effectiveness of the detention facilities as well as capture conservative peak flows and volumes. • Flow calculations are based on the Soil Conservation Service Curve Number Loss Method. Curve Numbers are based on soil type and land use in the drainage areas and impervious cover data was used to calculate percent impervious values. • The target peak runoff rate for the post -development condition is that of the pre -development peak flow rate. Copper Falls Drainage Report Page 1 j • According to Table B-1 in the USDG detention is NOT required for Bee Creek between Carters Creek and Texas Avenue (the location of the subject property) DRAINAGE BASIN DESCRIPTION i The proposed project site is located within the Bee Creek Drainage Basin. As demonstrated in Exhibit 2, no portion of the property lies within the regulatory 100-year floodplain per the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) panel 0310E, with an effective date of May 16, 2012. There are five drainage areas that drain through this tract and eventually into Bee Creek. These can be seen in Exhibit 3. Drainage Area (DA) 1 is located on the east side of SH 6 and its area will discharge across the property via a culvert under SH6 and drain Into the unnamed tributary of Bee Creek Tributary A just northeast of the site. Drainage area (DA) 2 includes a large portion of SH 6 and will also drain to the same tributary via TxDOT ditches and an existing TxDOT culvert. Drainage area (DA) 3 includes the area along the SH6 southbound frontage road that will drain through the proposed 18" culvert located under the driveway into the property and then into the unnamed tributary. The fourth drainage area, MiMS, drains the back half of the Metro mini -storage area and drains thru the northwest side of the Copper Falls property. The last drainage area, MMLot, contains the parking lot for the site and will discharge into the unnamed tributary of Bee Creek Tributary A. A summary of these drainage area parameters can be found in Table 1. Table 1 Drainage Area Parameters Area Ac Area (Sq Mi) Average Sloe CN % Imp Blended CN Lag Time hrs DA1 26.41 0.04127 0.92 82 15 84 0.45 DA2 21.47 0.03355 0.33 82 25 86 0.85 DA3 0.47 0.00074 1.14 82 40 88 0.10 MiniS 3.65 0.00571 2.97 82 66 93 0.08 MMLot 0.79 0.00124 2.64 82 50 90 0.06 Note: Drainage Area MMLot and Drainage Area MiniS reflect a different pre and post development conditions in the impervious parameter. MMLot goes from 0% to 50% (the proposed parking lot) and Minis goes from 6061 to 66% impervious (the buildings.) SITE RUNOFF ANALYSIS For the purpose of this analysis, storms were generated for all studied rainfall events using the depth - duration data taken from the National Weather Service TP-40 and Hydro 35. The storms generated were used for both the pre- and post -development analyses. Pre- and post -development hydraulic modeling Copper Falls Drainage Report Page 2 -g was performed using HEC-RAS for all specified rainfall events and included the 2- through 500-year rainfall events as required by the Bryan/College Station USDG. The site consists of Type D soil with a Curve Number of 82 for Antecedent Moisture Condition (AMC) II. Runoff losses due to infiltration and initial abstractions were calculated using the SCS Curve Number Loss i Method. These parameters were calculated using the Curve Number, established from soil type in the Brazos County Soil Survey, and percentage of impervious cover in the drainage areas. The 2-, 5-, 10-, 25-, 50-, 100-, and 500-year peak flows for pre- and post- development drainage areas were modeled using the flood hydrograph software, HEC-1. These models are included on a CD accompanying this report. Two different scenarios were modeled: • Plan 1- Existing conditions • Plan 2 - Proposed conditions without detention HYDROLOGIC ANALYSIS The results from the HEC-1 analysis can be seen below in Table 2. This table shows the corresponding peak flows for each basin as well as the combined flow both pre and post development, The last two columns show the hydrographs for the pre and post conditions at the "Combined" location. This "Combined" location can be seen in Exhibit 3. From these two columns it can be illustrated that the proposed project has negligible effects on the total flowrate at the point of discharge to the adjoining properties. For all but the 2-year event storm the flowrates after development show a slight decrease, however when considering the appropriate rounding of these results there is actually no change in flowrate. Graphic illustrations of the 2-year and 100-year hydrographs from the MMLot drainage area as well as the "Combined" location can be seen in Appendix B. Table 2: HEC-1 Peak Flows (Cfs) Storm DA1 DA2 DA3 Peak Flows (cfs) MMLot-Pre MMLot-Post MIS Comb -Pre Comb -Post 2-Yr 41.61 24.79 1.30 2.00 2.49 11.66 63.86 63.90 5-Yr 63.82 37.49 1.91 3.12 3.61 16.76 97.38 97.38 10-Yr 79.66 46.55 2.35 3.92 4.41 20.38 121.32 121.32 25-Yr 98.12 57.15 2.66 4.85 5.34 24.60 149.34 149.31 50-Yr 111.30 64.71 3.22 5.52 6.00 27.61 169.33 169.28 100-Yr 127.07 73.77 3.65 6.31 6.79 31.21 193.28 193.21 500-Yr 166.31 96.33 4.74 8.28 8.76 40.20 253.26 253.14 PARKING LOT DETENTION Although our analysis illustrates that there is little to no effect from this project on the adjacent drainage system, we have designed a detention system under the parking lot to help mitigate the runoff during 1 storm events. The proposed parking lot on this property will act as detention with the use of pervious Copper Falls Drainage Report Page 3 1 I pavement. There will be a pond underneath the parking lot that will retain the water and drain it into the channel. The parking spaces will be 6" concrete pavement, while the drive isle will be 6" concrete pavement with patterned slots for drainage. These slots will act as small weirs that allow the stormwater to fall into the gravel beneath the concrete. The detention (pond) below the drive aisle will be three feet deep and twenty-three feet wide (36"x23') and filled with-"-3/4" river gravel with Geotextile fabric above and below. Water caught by the pervious pavement will drain down through the river gravel and through a perforated drain that will discharge through a 12" PVC outfall. The water not picked up by the pervious pavement will drain into a standard curb inlet at the end of the parking lot. All of this flow will discharge through the 12" PVC outfall and into the channel. A sketch of a section of the I outlet control structure can be seen in Figure 1. Figure 1 : Outlet Control Structure Curb Inlet Section Std. 5' Curb Inlet Top-272.49 Throat-271.99 mart ent / nt%NG P aved`°nt R Oanc(eta P I.O ,w 1a' 4:1 SET Y t.000% Cement at Cement 4 ., /� Stabilized Sand � 18' RCP d Undisturbed Earth m e 12' PerforatedPerforated Pipe Notes: O1 PVC O 2.00X 40 L.F. of 4" Perforated PVC or II II II HDPE w/ 4-0.5" Holes every V. LL 4 20 LF. of 12' Perforated PVC or HDPE with 3-1' Holes every 0. N 9 8 io + N m + m m + a II o II 0 in 7n �IIt Copper Falls Drainage Report Page 4 j The purpose of this detention is to help reduce flows to even less than the existing flowrates. This is in an effort to assure no negative impacts occur from the development given the proximity to older residential structures. j EXISTING & PROPOSED 100 YEAR WATER SURFACE Even though the FEMA map does not indicate a 100-year floodplain on the property, we did calculate a 100-year storm water surface within the tributary on the lot. The 100-year water surface for the unnamed tributary to Bee Creek Tributary A was calculated using a steady-state hydraulic model in HEC- RAS. Hydrographs for Drainage Areas 1, 2, and 3 were combined to calculate the peak flow draining through the northeast side of the property. This combined flow was used to represent the peak 2-, 5- i 10-,25-,50-, 100-, and 500- year peak flows in the Upper Reach in the RAS model. The two drainage areas (MMLot and MIMS) corresponding to the parking lot and the Metro Mini -storage lot were combined to calculate the peak flow for the MaM Reach in the HEC-RAS model. The entire HEC-RAS Model is included on the attached CD. The calculated 100-year water surface elevation results are shown in Table 3 while a figure of the same 100-year water surface can be seen in Exhibit for the existing conditions scenario. There is an existing culvert on Mile Drive at cross section 40. The top of road elevation at this location is 267.00 feet and under existing conditions, the 10-,100-, and 500-year storms overtop the Mile Dr culvert. The water surface elevation over the road for the 10-year storm is 267.05 ft and the 100-year storm is 267.50 ft, u showing that there is 6 inches of water over the top of Mile Drive in the 100-year event. l Table 3: Calculated 100-Year Water Surface Elevations (ft) Reach MaM MaM MaM MaM River Sta 344.99 310.58 275.25 254.16 50% Storm 269.53 269.39 268.89 267.57 10% Storm 269.79 269.62 269.01 267.69 1 % Storm 270 269.79 269.11 267.79 0.20% Storm 270.14 269.92 269.2 267.87 Upper 204.09 269.44 270.05 270.58 270.93 Upper 181.16 269.31 269.89 270.38 270.72 Upper 155.69 269.2 269.72 270.15 270.43 Upper 89.11 268.64 269.07 269.45 269.71 Upper 29.89 267.44 267.96 268.46 268.82 Upper 14.65 266.72 267.23 2QL68 267.98 Lower 163.34 265.E 267.09 67.6 267.84 Lower 81.56 265.55 267.08 267.58 267.8 Lower 61.77 265.5 267.06 267. 2 267.73 Lower 16.49 261.26 261.67 262.09 262.38 Lower 5.20 261.22 261.67 262.12 262.44 Copper Falls Drainage Report Page 5 The project has no effect on this water surface elevation as the increased flow is negligible. With the parking lot detention there may be a slight decrease In this water surface elevation but it will not be substantial. CONCLUSION The development of the Copper Falls buildings will not significantly increase total runoff from the property to the adjoining drainage system. This is a result of: 1. the location of the project within the watershed, and 2. the volume of total flow currently going thru the property from upstream vs. the increased flow from the project. Even though the modeling supports no detention, it is important to note that the proposed on -site parking lot detention system has been added to mitigate any local effects of the development. Copper Falls Drainage Report Page 6 EXHIBITS Exhibit 1: Exhibit 2: Exhibit 3: Exhibit 4: Vicinity Map Firmette — FEMA Map Panel 0201D Drainage Area Map 100-Year Calculated Water Surface APPENDICES Appendix A: Appendix B: Appendix C: HEC-1 Output File 2-Yr Pre vs. Post— MMI-ot Hydrograph 100-Yr Pre vs. Post — MMI-ot Hydrograph 2-Yr Pre vs. Post — Combined Hydrograph 100-Yr Pre vs. Post —Combined Hydrograph CD with HEC-1 & HEC-RAS Files Copper Falls Drainage Report Page 7 EXIBITS SITE a BUR( KING METRO STORAG 1 0 C NTS F,979.260.3564 �<x.x�<xsa<,<5rs,x2012 VICINITY MAP Trt pax[fWIL S sign*l y:J F,979.260.3564 o<, 3,WATCHx4 are su uxrvcxsxr ox°re rwsr xroxoN.-SNSO ,NS ova., er: aw, are .`°"°�M°°" ""`°e, " COPPER FALLS score 204 EXHIBIT • ' cou.ccc sunox. a new A 6 0 bw ZONE X City of College Station 480083 rOA 0 (� RMSO v ZONEAE 0 LIMITOFDETAILED STUDY \ LIMITOF DETAILED STUDY M Foxftre Creek insurance agent or call the National Flood Insurance Program a A APPROXIMATE SCALE 600 0 6 RFFTANY IIIIIIIIIIIIIIII WFO6OOWI NATIONAL FLOOD INSURANCE PROGRAM DRIVE FIRM CO) FLOOD INSURANCE RATE MAP E BRAZOS COUNTY, TEXAS AND INCORPORATED AREAS oo� �1y (SEA MAP IN DO. POa PANeLe NOT PRINTEOI CONTAINS, �1 ammu KM MR 4SM82 02001 0� COLLIKe STATION. CITY OF UNINCORPORATED ARFAS 4911950201 O FMlaia Wpn MMAIN9MaalMwwnNeweMUNwuM tlow NaW M�ueNm Mvwae�UINRMeUfpMe µel MAP NUMBER 48041CO201 D 0) MAP REVISED: FEBRUARY 8, 2000 Federal Emeegency Management Agency EXHIBIT 2 a lean official copy of a portion of the above referenced flood map. it a extracted us Ing F-MIT On-Ll no, This map does not reflect changes amendments Mich may halve been made subsequent to the date on the a block. For the latest product Information about National Flood Insurance Doram flood maes check the FEMA Flood Map Store at w.wy.msc.fema.gc AVA`"VA`- % ----------' "\ -------------==-�oa�?.ram 3.65 Ac. ••DA3 0.47 Ac. 1 •� Via` 0.lvl79 AC. 1 TOc - m-� �J\�\j I t�// .,. (" scale. .,Y--'____ _ /'O�rw➢ inoh 6t_ � l 0 bin8d'/ I -a/,--- pxae P / ----------------- dool _ \ _ ,; ; ,,• / /./,; _ - 21.47 AC,-------------- - _ -_ - _ - - ���i�=_-__ /// ;-'- -'" - — __>___ _ •..................... r.. / / / •V• � _�' -' ��!i �- _-� '/ _-�' • _- c' _ \ �/ 1 f Ili,\ 1 , I � \ / / • , I _ � i'-�'�-'-''1AIll _%"'.• �_�-�- _�,i-" A A � � - �___�! II//� 1 � 1 j / I i r / �//.' /� / ! ,_ ,;,/ ,,�__ ;' �•' _,_- - ,; _ • v v v' � `III / I i l v 1 . i .;, •• /.'�, S ���r/ __-' '�_ .ter•'^�__ 1\ • I/ I ,`\ `? I J n / f � 1 I / I II DAl � _ � / `\ � • j � eft � I I / \ \ ' --1 L / \ I ` ���- •� _ it - - v "i ------------ I \ \ T.979.260.6963 F.979.260.3564 tt ulAusnr ous se¢ ax M1EOE StgpN, i% [E/nKa- I / I/ 1/ I I I u I a V p=N �$ rc Ev«om E�oa$�d ;a5g CC9 4F._O a T.979.260.6963 F.979.260.3564 e, i urmvarc wes w 6}AI1011, /X ]Id RIX � 0001 w6Y11� 1 I QM1 MYaN•MYWM1N IIY[{ m nAN •��s I; Mnr.mllar.Me�wpv.ou 1 APPENDICES *************************************** * * * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 29AUG12 TIME 07:23:23 * (916) 756-1104 * * * * ***************************************** *************************************** X X XXXXXXX XXXXX X X X X X X XX X X X X X XXXXXXX XXXX X XXXXX X X X X X X X X X X X X X X XXXXXXX XXXXX XXX THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HECI (JAN 73), HECIGS, HECIDB, AND HECIKW THE DEFINITIONS OF VARIABLES-RTIMP- AND-RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE. THE DEFINITION OF-AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE, SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY, DS5:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM APPENDIX A Copper Falls HEC-1 Output Page 1 1 HEC-11NPUT PAGE 1 LINE ID ....... 1....... 2....... 3....... 4....... 5....... 6....... 7....... 8....... 9...... 10 1 ID COPPER FALLS OFFICE COMPLEX DRAINAGE STUDY 2 ID BYJJM 3 ID COLLEGE STATION, TEXAS, JANUARY 2012 4 IT 211JAN99 0 721 5 10 5 6 JR PREC 4.5 6.2 7.4 8.8 9.8 11 14 *STORM 2 YR 5 YR 10 YR 25 YR 50 YR 100 YR 500 YR 7 JP 2 8 KK DA1 9 KO 21 10 KM Drainage Area Through 6x4 Culvert (including all within Tract) 11 KM PLAN 1 IS EXISTING CONDITIONS 12 KM PLAN 2 IS PROPOSED CONDITIONS WITHOUT DETENTION 13 PB 1 14 IN 611JAN99 0 15 PC 0 0.001 0.002 0.003 0.004 0.005 0.006 0.007 0.008 0.009 16 PC 0.01 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 17 PC 0.02 0.021 0.022 0.0231 0.0241 0.0252 0.0263 0.0274 0.0285 0.0296 18 PC 0.0308 0.0319 0.0331 0.0343 0.0355 0.0367 0.0379 0.0392 0.0404 0.0417 19 PC 0.043 0.0443 0.0456 0.047 0.0483 0.0497 0.0511 0.0525 0.0539 0.0553 20 PC 0.0567 0.0582 0.0597 0.0612 0.0627 0.0642 0.0657 0.0673 0.0688 0.0704 21 PC 0.072 0.0736 0.0753 0.077 0.0788 0.0806 0.0825 0.0844 0.0864 0.0884 22 PC 0.0905 0.0926 0.0948 0.097 0.0993 0.1016 0,104 0.1064 0.1089 0.1114 23 PC 0.114 0.1167 0.1194 0.1223 0.1253 0.1284 0.1317 0.135 0.1385 0.1421 24 PC 0.1458 0.1496 0.1535 0.1575 0.1617 0.1659 0.1703 0.1748 0.1794 0.1842 25 PC 0.189 0.194 0.1993 0.2048 0.2105 0.2165 0.2227 0.2292 0.2359 0.2428 26 PC 0.25 0.2578 0.2664 0.276 0.2866 0.298 0.3143 0.3394 0.3733 0.4166 27 PC 0.5 0.584 0.6267 0.6606 0.6857 0.702 0.7134 0.724 0.7336 0.7422 28 PC 0.75 0.7572 0.7641 0.7708 0.7773 0.7835 0.7895 0.7952 0.8007 0.806 29 PC 0.811 0.8158 0.8206 0.8252 0.8297 0.8341 0.8383 0.8425 0.8465 0.8504 30 PC 0.8543 0.8579 0.8615 0.865 0.8683 0.8716 0.8747 0.8777 0.8806 0.8833 31 PC 0.886 0.8886 0.8911 0.8936 0.896 0.8984 0.9007 0.903 0.9052 0.9074 32 PC 0.9095 0.9116 0.9136 0.9156 0.9175 0.9194 0.9212 0.923 0.9247 0.9264 33 PC 0.928 0.9296 0.9312 0.9327 0.9343 0.9358 0.9373 0.9388 0.9403 0.9418 34 PC 0.9433 0.9447 0.9461 0.9475 0.9489 0.9503 0.9517 0.953 0.9544 0.9557 35 PC 0.957 0.9583 0.9596 0.9609 0.9621 0.9634 0.9646 0.9658 0.967 0.9682 36 PC 0.9694 0.9706 0.9718 0.9729 0.9741 0.9752 0.9764 0.9775 0.9786 0.9797 37 PC 0.9808 0.9818 0.9829 0.9839 0.985 0.986 0.987 0.988 0.989 0.99 38 PC 0.9909 0.9919 0.9928 0.9938 0.9947 0.9956 0.9965 0.9974 0.9983 0.9991 39 PC 1 40 BA 0.0412 7 41 LS 82 15 42 UD 0.45 43 KK Pond 44 RS 1 STOR 0 45 SA 0 0.011 0.044 0.221 0.93 8.306 46 SE 272 274 276 278 280 282 47 SL 272 18 0.7 0.5 48 SS 281 Ill 3 1.5 Copper Falls HEC-1 Output Page 2 1 HEC-11NPUT PAGE 2 LINE ID ....... 1....... 2....... 3....... 4....... 5....... 6....... 7....... 8....... 9...... 10 49 KK DA2 50 KO 21 51 BA 0.0335 5 52 LS 82 25 53 UD 0.85 54 KK DA3 55 KO 21 56 BA 0.0007 4 9 57 LS 82 40 58 UD 0.1 59 KK Channe 1 60 HC 3 61 KK MMI-ot 62 KO 21 63 ZW A=BeeTA, B=MaM, C=FLOW, E=2MIN, F=1 00 64 BA 0.0012 4 65 LS 82 0 66 UD 0.07 67 KP 2 68 LS 82 50 69 UD 0.05 70 KK ConfA 71 HC 2 ti��:C�P tGIF7 73 KO 21 74 BA 0.0057 1 75 LS 82 60 76 UD 0.08 77 KP 2 78 LS 82 66 79 KK COMB 80 KO 21 81 HC 2 82 ZZ Copper Falls HEC-1 Output Page 3 * * * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 29AUG12 TIME 07:23:23 * (916) 756-1104 * * * * ***************************************** *************************************** COPPER FALLS OFFICE COMPLEX DRAINAGE STUDY BY 1JM COLLEGE STATION, TEXAS, JANUARY 2012 510 OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 2 MINUTES IN COMPUTATION INTERVAL IDATE 11JAN99 STARTING DATE ITIME 0000 STARTING TIME NQ 721 NUMBER OF HYDROGRAPH ORDINATES NDDATE 12JAN99 ENDING DATE NDTIME 0000 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .03 HOURS TOTAL TIME BASE 24.00 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT JP MULTI -PLAN OPTION NPLAN 2 NUMBER OF PLANS JR MULTI -RATIO OPTION RATIOS OF PRECIPITATION 4.50 6.20 7.40 8.80 9.80 11.00 14.00 Copper Falls HEC-1 Output Page 4 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ############## # # 8 KK * DA1 # # ############## 9 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINTCONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 721 LASTORDINATE PUNCHED OR SAVED TIMINT .033 TIME INTERVAL IN HOURS ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ############## # # 49 KK* DA2 # # ############## 50 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH [OUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 721 LAST ORDINATE PUNCHED OR SAVED TIMINT .033 TIME INTERVAL IN HOURS Copper Falls HEC-1 Output Page 5 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 54 KK* DA3 * * 55 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINTCONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 721 LASTORDINATE PUNCHED OR SAVED TIMINT .033 TIME INTERVAL IN HOURS ************** * * 61 KK * MMLot * * ************** 62 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINTCONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH [OUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 721 LAST ORDINATE PUNCHED OR SAVED TIMINT .033 TIME INTERVAL IN HOURS ----- DSS--- ZOPEN: Existing File Opened, File: COPPERFALLS.DSS Unit: 71; DSS Version: 6-JG ----- DSS --- ZWRITE Unit 71; Vers. 19: /BEETA/MAM/FLOW/10JAN1999/2MIN/1 00+1/ ----- DSS --- ZWRITE Unit 71; Vers. 19: /BEETA/MAM/FLOW/111AN1999/2MIN/1 00+1/ ----- DSS --- ZWRITE Unit 71; Vers. 19: /BEETA/MAM/FLOW/10JAN1999/2MIN/1 00+2/ ----- DSS --- ZWRITE Unit 71; Vers. 19: /BEETA/MAM/FLOW/11JAN1999/2MIN/1 00+2/ ----- DSS --- ZWRITE Unit 71; Vers. 19: /BEETA/MAM/FLOW/10JAN1999/2MIN/1 00+3/ ----- DSS --- ZWRITE Unit 71; Vers. 19: /BEETA/MAM/FLOW/11JAN1999/2MIN/1 00+3/ ----- DSS --- ZWRITE Unit 71; Vers. 19: /BEETA/MAM/FLOW/1OJAN1999/2MIN/1 00+4/ ----- DSS --- ZWRITE Unit 71; Vers. 19: /BEETA/MAM/FLOW/11JAN1999/2MIN/1 00+4/ -----DSS---ZWRITE Unit 71; Vers. 19: /BEETA/MAM/FLOW/IOJAN1999/2MIN/1 00+5/ Copper Falls HEC-1 Output Page 6 -----DSS---ZWRITE Unit 71; Vers. -----DSS --- ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers. -----DSS--ZWRITE Unit 71; Vers. -----DSS--ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers. -----DSS---ZWRITE Unit 71; Vers. DSS --- ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers. ----DSS --- ZWRITE Unit 71; Vers. ----- DSS --- ZWRITE Unit 71; Vers, -----DSS---ZWRITE Unit 71; Vers. -----DSS---ZWRITE Unit 71; Vers, * 72 KK* MIMS * * ************** 19: /BEETA/MAM/FLOW/11JAN1999/2MIN/1 00+5/ 19: /BEETA/MAM/FLOW/10JAN1999/2MIN/1 00+6/ 19: /BEETA/MAM/FLOW/11JAN1999/2MIN/1 00+6/ 19: /BEETA/MAM/FLOW/10JAN1999/2MIN/1 00+7/ 19: /BEETA/MAM/FLOW/11JAN1999/2MIN/1 00+7/ 31: /BEETA/MAM/FLOW/10JAN1999/2MIN/+1/ 31: /BEETA/MAM/FLOW/19JAN1999/2MIN/+1/ 31: /BEETA/MAM/FLOW/10JAN1999/2MIN/+2/ 31: /BEETA/MAM/FLOW/11JAN1999/2MIN/+2/ 31: /BEE7rA/MAM/FLOW/10JAN1999/2MIN/+3/ 31: /BEETA/MAM/FLOW/11JAN1999/2MIN/+3/ 31: /BEETA/MAM/FLOW/10JAN1999/2MIN/+4/ 31: /BEETA/MAM/FLOW/11JAN1999/2MIN/+4/ 31: /BEETA/MAM/FLOW/10JAN1999/2MIN/+S/ 31: /BEETA/MAM/FLOW/11JAN1999/2MIN/+S/ 31: /BEETA/MAM/FLOW/10JAN1999/2MIN/+6/ 31: /BEETA/MAM/FLOW/11JAN1999/2MIN/+6/ 31: /BEETA/MAM/FLOW/10JAN 1999/2M I N/+7/ 31; /BEETA/MAM/FLOW/11JAN1999/2MIN/+7/ 73 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 721 LAST ORDINATE PUNCHED OR SAVED TIMINT .033 TIME INTERVAL IN HOURS Copper Falls HEC-1 Output Page 7 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 1 ############## # # 79 KK * COMB # # ############## 80 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINTCONTROL (PLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOTSCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 721 LAST ORDINATE PUNCHED OR SAVED TIMINT .033 TIME INTERVAL IN HOURS PEAK FLOW AND STAGE (END -OF -PERIOD) SUMMARY FOR MULTIPLE PLAN -RATIO ECONOMIC COMPUTATIONS FLOWS IN CUBIC FEET PER SECOND, AREA IN SQUARE MILES TIME TO PEAK IN HOURS RATIOS APPLIED TO PRECIPITATION OPERATION STATION AREA PLAN RATIO 1 RATIO 2 RATIO 3 RATIO 4 RATIO 5 RATIO 6 RATIO 7 4.50 6.20 7.40 8.80 9.80 11.00 14.00 HYDROGRAPH AT + DA1 .04 1 FLOW 42. 64. 80. 98. 111. 127. 166. TIME 12.50 12.50 12.50 12.50 12.50 12.50 12.50 2 FLOW 42. 64. 80. 98. 111. 127. 166. TIME 12.50 12.50 12.50 12.50 12.50 12.50 12.50 ROUTED TO + Pond .04 1 FLOW 42. 64. 80. 98. 111. 127. 166. TIME 12.50 12.50 12.50 12.50 12.50 12.50 12.50 2 FLOW 42. 64. 80. 98. 111. 127. 166. TIME 12.50 12.50 12.50 12.50 12.50 12.50 12.50 ** PEAK STAGES IN FEET** 1 STAGE 272.58 272.89 273.11 273.37 273.56 273.78 274.71 TIME 12.50 12.50 12.50 12.50 12.50 12.50 12.50 2 STAGE 272.58 272.89 273.11 273.37 273.56 273.78 274.71 TIME 12.50 12.50 12.50 12.50 12.50 12.50 12.50 Copper Falls HEC-1Output Page 8 HYDROGRAPH AT + DA2 .03 1 FLOW 25. 37. 47. 57. 65. 74. 96. TIME 12.93 12.90 12.90 12.90 12.90 12.90 12.90 2 FLOW 25. 37. 47. 57. 65. 74. 96. TIME 12.90 12.90 12.90 12.90 12.90 12.90 12.90 HYDROGRAPH AT + DA3 .00 1 FLOW 1. 2. 2. 3. 3. 4. S. TIME 12.13 12.13 12.13 12.13 12.13 12.13 12.13 2 FLOW 1. 2. 2. 3. 3. 4. 5. TIME 12.13 12.13 12.13 12.13 12.13 12.13 12.13 3 COMBINED AT + Channe .08 1 FLOW 61. 93. 116. 143. 162. 185. 243. TIME 12.60 12.60 12.57 12.57 12.57 12.57 12.57 2 FLOW 61. 93. 116. 143. 162. 185. 243. TIME 12.60 12.60 12.57 12.57 12.57 12.57 12.57 HYDROGRAPH AT + MMLot .00 1 FLOW 2. 3. 4. S. 6. 6. 8. TIME 12.10 12.10 12.10 12.10 12.10 12.10 12.10 2 FLOW 2. 4. 4. 5. 6. 7. 9. TIME 12.10 12.10 12.10 12.10 12.10 12.10 12.10 2 COMBINED AT + ConfA .08 1 FLOW 61. 94. 117. 144. 163. 186. 245. TIME 12.60 12.57 12.57 12.57 12.57 12.57 12.57 2 FLOW 61. 94. 117. 144. 163. 186. 245. TIME 12.60 12.57 12.57 12.57 12.57 12.57 12.57 HYDROGRAPH AT + Minis .01 1 FLOW 12. 17. 20. 25. 28. 31. 40. TIME 12.10 12.10 12.10 12.10 12.10 12.10 12.10 2 FLOW 12. 17. 21. 25. 28. 31. 40. TIME 12.10 12.10 12.10 12.10 12.10 12.10 12.10 2 COMBINED AT + COMB .08 1 FLOW 64. 97. 121. 149. 169. 193. 253. TIME 12.57 12.57 12.53 12.53 12.53 12.53 12.53 2 FLOW 64. 97. 121. 149. 169. 193. 253. TIME 12.57 12.57 12.53 12.53 12.53 12.53 12.53 *** NORMAL END OF HEC-1 *** ----- DSS--- ZCLOSE Unit: 71, File: COPPERFALLS.DSS Pointer Utilization: .25 Number of Records: 28 File Size: 106.0 Kbytes Percent Inactive: .0 Copper Falls HEC-1 Output Page 9 M N N V1 N � (SM Moli N of O 1 V 99 9 c-I 9' o i f i t o t f v •� co c ` ~ N 1 0 1 O !1 ! /- ,S c z LU Cl- Cl- O O n LO L M O O O (Sp) mold N O eF N N O N �-i N O O N O tT N O N N 9 c z w a C o a a � cc 0 0 0 0 i No f� i ji 0 N 1 a -I i I i Vf $ c i a � > i L I a ! N 00(U 0 r • 7 r „r,. w. CG v N 1� 1� �4L r O N N CO I, w Ln a m N . i O (SID) Moll 4a Vf O a (A L E O u O Ln N R O Ln O Ln O N ci r-I (5j:)) mold s