Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Letter of Acknowledgement
IY�►i/1 MORGAN April 30, 2012 City of College Station Planning & Development Services PO Box 9960 College Station, TX 77842 RE: LETTER OF ACKNOWLEDGEMENT FOR COPPER FALLS EXECUTIVE SUITES To whom it may concern: The purpose of this letter is to acknowledge that the construction plans for the site civil drawings and drainage for Copper Falls Executive Suites, 1.62 acres, M. Rector Abstract #46, to the best of my knowledge do not deviate from the B/CS Design Guidelines Manual with the following exception: • Expansion joint spacing max 60' contraction joint spacing max 20' unless noted I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. If you have any comments, or would like to discuss this further, please feel free to contact me. �4"6x\ Sincerely, +�+:��••Fka\`�� * :............le * D a� • JOEL J�MITCHELL •�� elJ. tchell,PE ��4�•p�'8O64P�a��Q� Partne 0�®�sS:s®�iVYYi `�i0 F,lya?J cc: file 511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • 1 979,260.6963 • 979.260.3564 CIVIL ENGINEERING - HYDRAULICS HYDROLOGY UTILITIES STREETS SITE PLANS SUBDIVISIONS info©ntitchellandmorgan.com • www. mitchellandmorgan,com