HomeMy WebLinkAboutApplication (12-95)CITY OP COLLL+.GL STATION
Hone of Texas A&M University'
SITE PLAN APPLICATION
GENERAL
MINIMUM SUBMITTAL REQUIREMENTS:
[X $932 Site Plan Application Fee.
FOR OFFICE
CASE NO.:
DATE SUBMITTED,�
TIME:
STAFF:
Q $350 Non -Residential Architectural Standards Building Review Application Fee (if applicable).
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered.
0 Fourteen (14) folded copies of site plan.
0 One (1) folded copy of the landscape plan.
0 One (1) copy of the following for Non -Residential Architectural Standards building review or Northgate
Building Review (if applicable).
QX Building elevations to scale for all buildings.
❑X A list of building materials for all facade and screening.
Q Color samples for all buildings or list colors to be used from the approved color palette.
❑X Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov.
XX Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
FX Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
❑X Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
0 The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management Conference April 11, 2012
NAME OF PROJECT Copper Falls Executive Suites
ADDRESS 3202 Earl Rudder Freeway South
LEGAL DESCRIPTION (Lot, Block, Subdivision) Lots 1 & 2, Block 1, Copper Falls Commons, 0.988 acres
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Mitchell & Morgan, LLP C/O Joel J. Mitchell, PE E-mail Joel@mitchellandmorgan.com
Street Address 511
City College Station
Drive East, Suite 204
State Texas
Zip Code 77840
Phone Number (979) 206-6963 Fax Number (979) 260-3564
PROPERTY OWNER'S I MATION:
Name 1999 Properties Group, LLC C/O Joel Mitchell, PE
Street Address 511 University Drive East, Suite 204
City College Station
State Texas
E-mail Joel@mitchellandmorgan.com
Zip Code 77840
Phone Number (979).286=6963 Fax Number (979) 260-3564
1/11 Page 1 of 11
ARCHITECT OR ENGINEER'S INFORMATION:
Name The Arkitex Studio, Inc. C/O Eva Read -Warden
Street Address 308 North
City Bryan
Avenue
Phone Number (979) 821-2635
OTHER CONTACTS (Please specify type of contact):
Name N/A
Street Address N/A
City N/A
Phone Number N/A
Current zoning A-P - Administrative Professional
Present use of property Vacant - Undeveloped
Proposed use of property Office
E-mail eva@arkitex.com
State Texas Zip Code 77803
Fax Number (979) 775-8224
E-mail N/A
State N/A
Fax Number N/A
Zip Code N/A
Number of parking spaces required 24 Number of parking spaces proposed
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property?
34
r Yes IX'; No
information is necessary to help staff identify the appropriate standards to review the application and will be used t
determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
ng is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
iplication be reviewed under previous ordinance as applicable?
r Yes
�. No
yes, provide information regarding the first approved application and any related subsequent applications (provide
tditional sheets if necessary):
Project Name: N/A
City Project Number (in known): N/A
Date / Timeframe when submitted: N/A
1/11 Page 2 of 11
MULTI -FAMILY RESIDENTIAL
Total Acreage N/A
Floodplain Acreage N/A
Housing Units N/A
N/A # of 1 Bedroom Units
N/A # of 2 Bedroom Units
N/A # of 3 Bedroom Units
PARKLAND DEDICATION
(Fees due prior to the issuance of a Building Permit)
# of Multi -Family Dwelling Units
N/A X$1646=$NIA
N/A # of acres in floodplain
N/A # of acres in detention
N/A # of acres in greenways
Date dedication approved by Parks &
N/A # of 4 Bedroom Units N/A Recreation Advisory Board
COMMERCIAL
FOR 2 BEDROOM UNITS ONLY
N/A #Bedrooms = 132 sq. ft. Total Acreage 0.988 Acres
N/A #Bedrooms < 132 sq. ft. Building Square Feet 2,876 SF
Floodplain Acreage N/A
* Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
and correct.
30 ArL-R,
Date
1/11 Page 3 of 11
ADDITIONAL OWNER INFORMATION
Name Veronica J.B. Morgan, PE, CFM
Street Address 511 University Drive East, Suite 204
City College Station State Texas Zip Code 77840
E-Mail Address v(dmitchelland morgan. corn
Phone Number (979) 260-6963 Fax Number (979) 260-3564
Owner's
Date
Name James T. Batenhorst PE
Street Address 511 University Drive East, Suite 204
City College Station State Texas Zip Code 77840
E-Mail Address iamesArnitchellandmorgan.com
Phone Number (979) 260-6963 Fax Number (979) 260-3564
l" 4 y-zg-za)7�
Owner's Signature Date
Name Joaouin U. Jaramillo, EIT
Street Address 511 University Drive East, Suite 204
City College Station State Texas Zip Code 77840
E-Mail Address ioaguin(@rnitchellandmorgan.com
Phone Number (979) 260-6963 Fax Number (979) 260-3564
Date
CERTIFICATIONS REQUIRED FOR ALL D
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re -issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
3oAnLt2.
Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO TIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT IET TION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE. ;.•°°®`�°O••s Wg
tELJ.MITCHELL
Date
Page 4 of 11
The following CERTIFIL.ATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:`
A. 1, c u` A certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood
those areas exemptej&y%rkdilf�rKdoAM ion 5.11.3a of Chapter 13 Code of Ordinances.
ginee ®�o .9 gOggg Q®0—F
Q �oDate
Y "N `S ®F`al�� ®
Initia SS/oNALt
* If a platting -status exemption o this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site
\\Plans,
�]Final Plats, Construction Plans, and Fill / Grading Permits:
�J
B. I, AOA ' �udw -.QWI �,ydcertify to the following:
(i) that any nonresidential or
designed to prevent dam 47 hf
..............
JOEL J. MITCHELL
®»®®®s-oo..... e.
i or proposed to be on this site as part of this application is
contents as a result of flooding from the 100-year storm.
3oA�L/Z
m' Date
Additional certification for Floodway Encroachments:
C. I, IA I A certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
W)) WI)k
Engineer Date
1/11 Page 5 of 11
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. 1, certify that all new construction or any substantial improvement
of any residential structu a shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one fool above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
P R-
Engineer / Surveyor
Commercial Structures:
Date
E. I, C )k9L\ `t) �' � IiQUVt certify that all new construction or any substantial improvement
of any commercial, industrial, idential structure are designed to have the lowest floor, including all
utilities, ductwork and base_ '4 eVs g Cst one foot above the Base Flood Elevation
Or;
JOELJ.MITCHELL*% 36Ap'LlZ
Surveyor A ® 9�G/0649 ®p -i ;Date
ltl��'�...®gNo�� G tu�1
I, 1 v I Q , certify that the structure with its attendant utility, ductwork,
basement and sanitary f cilities is designed to be flood -proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
Engineer/ Surveyor
Conditions or comments as part of approval:
N�J1
Date
1/11 Page 6 of 11