Loading...
HomeMy WebLinkAboutStaff ReportSCALE: LOCATION: ZONING: APPLICANT: PROJECT MANAGER: CITY OF COLLEGE STATION PRELIMINARY PLAN for Falcon Point 12-00500100 6 lots on 12.94 acres 1915 Dartmouth Street, located at the northeast corner of Dartmouth Street and Holleman Drive East WPC Wolf Pen Creek Travis Martinek, Clarke & Wyndham, Inc. Teresa Rogers, Staff Planner trogers@cstx.gov PROJECT OVERVIEW: This preliminary plan is to subdivide one tract into residential and commercial development. A conditional use permit (CUP) was approved by City Council in July 2012, which allows Phase I of this project to be solely multi -family use. RECOMMENDATION Planning & Zoning Commission September 20, 2012 Staff recommends approval of the Preliminary Plan. Page 1 of 6 Planning & Zoning Commission Page 2 of 6 September20, 2012 �-[VM Z 2 Z O K FL Q LL I� Q a x F a _ U)O wv�w m �U a� �ic�rca � wooer ziillrod. Us�Urcd. uj U) W J� I �/ Ow M Q N O Ea � — p O za` of °U L IyOGN F-�S�QU'w m<mra�- I I I I I I �RKKQU N h Z_ 0 a z 0 J LLLL Planning & Zoning Commission Page 3 of 6 September 20, 2012 DEVELOPMENT HISTORY Annexation: 1971 Zoning: R-1 Single Family to C-1 General Commercial in 1984 C-1 General Commercial to WPC Wolf Pen Creek in 1988 CUP Conditional Use Permit in July 2012 to allow Phase I of this project to be solely multi -family use. Site development: Vacant COMMENTS Water: There is an existing 6-inch water main at the northwestern corner of the property near proposed Lot 1 and an 8-inch water main at the southeastern corner of the property near proposed Lot 5. Water lines will have to be extended to provide domestic and fire flows to all subdivided lots and shall be designed and constructed in accordance with the BCS Unified Design Guidelines. Sewer: There are existing 30-inch sanitary sewer mains along the northern and eastern boundaries of the property. Sewer lines will have to be extended to all subdivided lots, and shall be designed and constructed in accordance with the BCS Unified Design Guidelines. Off -site Easements: None at this time. Drainage: Drainage is generally to the south within the Wolf Pen Creek Drainage Basin. Development of this tract will be required to meet the City's Storm Water Design Guidelines and drainage ordinance. Flood Plain: There is no FEMA designated floodplain on this property. Greenways: No greenway dedication is required or proposed. Pedestrian Connectivity: Sidewalks exist along Dartmouth Street and Holleman Drive East. Bicycle Connectivity: A bicycle lane is proposed in the Comprehensive Plan along Dartmouth Street and there is an existing bicycle lane along Holleman Drive East. Streets: Dartmouth Street is a Minor Arterial and Holleman Drive East is a Major Collector on the City's Thoroughfare Plan. Additional right- of-way (ROW) will be dedicated with the Final Plat of each phase. The property will have access from Dartmouth Street and Holleman Drive East. Oversize Request: None requested. Parkland Dedication Fees: For future multi -family units, fee in lieu of land will be required at $1,636 per unit. Fees will be due at the time of building permit. Planning & Zoning Commission Page 4 of 6 September 20, 2012 Impact Fees: N/A REVIEW CRITERIA 1. Compliance with Comprehensive Plan and Unified Development Ordinance: The Comprehensive Plan designates the subject property as Urban Mixed Use and Natural Areas — Reserved on the Future Land Use and Character Map and is located in the Wolf Pen Creek District. The Urban Mixed Use designation allows for an intense level of development activity, which would consist exclusively of residential, commercial, and office uses in vertical mixed -use structures. Presently the property is zoned WPC Wolf Pen Creek which encourages the public and private use of Wolf Pen Creek and the development corridor as an active and passive recreational area while maintaining an appearance consistent with the Wolf Pen Creek Master Plan. The CUP allows Phase I of this project to be solely multi -family use. 2. Compliance with Subdivision Regulations: The Preliminary Plan is in compliance with the Subdivision Regulations of the Unified Development Ordinance. STAFF RECOMMENDATION Staff recommends approval of the Preliminary Plan. SUPPORTING MATERIALS 1. Application 2. Copy of Preliminary Plan Planning & Zoning Commission Page 5 of 6 September 20, 2012 Planning & Zoning Commission Page 6 of 6 September 20, 2012