Loading...
HomeMy WebLinkAboutStaff CommentsSTAFF REVIEW COMMENTS NO. 1 Project: Genghis Grill Patio (Sp)—11-00500015 PLANNING 1) Please provide a key map of the project location. 2) Please include the following information in the title block: a) Legal description of the property; b) Name, address and telephone of the applicant; c) Name, address, and telephone number of the property owner/developer; d) An updated project submittal date on all sheets; e) The total area of the project. 3) Please add,phase line around the project area. The phase line should be located 20' from any new improvement. Without the phase line, the entire shopping center will need to come into compliance with all applicable ordinances. 4) Please show the property line for this site. 5) Please provide ownership and zoning information for all abutting properties. 6) Please provide a note that identifies the FEMA panel that covers this property and was used to determine no floodplain exists on the property. 7) Please the location of the existing FDC connection. If it is located within the patio area, access through the patio fence will be required. 8) Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 9) Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 10) Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Matthew Hilgemeier LAN DSCAPING/STREETSCAPING/BUFFER 1. Planning has not landscape comments. Reviewed by: Matthew Hilgemeier Date: 4/1/2011 Date: 4/1 /2011 Page 2 of 3 ENGINEERING COMMENTS NO. 1 1. Please field verify the exact location of the water and sanitary sewer mains located just adjacent to the proposed patio and identify these locations on the site plan. The centerline of the utility pipe may not be any closer than 7.5 feet away from the patio. Reviewed by: Josh Norton Date: March 31, 2011 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. The scope of this project as shown does not require modification or additions to existing CSU infrastructure. Electric for this project will be provided from the customers internal service panel. If this is in error of if the scope of this project changes to require additions or modifications to CSU infrastructure or additional easements then all comments listed below will apply and easements will need to be filed by separate instrument. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: gmartinez(cDcstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11.To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 03.31.2011