HomeMy WebLinkAboutStormwater Drainage ReportStormwater Drainage Report
for
Tower Point Site Development
for
Lot 15
College Station, Texas
Prepared for:
Weiner Development Corporation
Prepared by:
Walter P. Moore & Associates, Inc.
1301 McKinney, Suite 1100
Houston, TX 77010
TBPE Firm Registration No. 1856
January 25, 2011
Revised February 21, 2011
OF
A
TABLE OF CONTENTS
PROFESSIONAL CERTIFICATION.......................................................................................2
EXECUTIVE SUMMARY.......................................................................................................3
GENERAL LOCATION AND DESCRIPTION OF PROJECT AREA.........................................4
DRAINAGE WATERSHEDS AND STUDY AREAS.................................................................5
DRAINAGE DESIGN CRITERIA............................................................................................5
COMPLIANCE WITH PROPOSED DEVELOPMENT ASSUMPTIONS...................................6
DRAINAGE SYSTEM DESIGN..............................................................................................7
CONCLUSION
APPENDIX.................................................................................
...... 7
we
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 1
PROFESSIONAL CERTIFICATION
This report and plans for the drainage design of Tower Point Site Development — Lot 15 project was
prepared by me (or under my supervision) in accordance with provisions of the Bryan/College
Station Unified Drainage Design Guidelines for the owners of the property. All licenses and permits
required by any and all state and federal regulatory agencies for the proposed drainage
improvements will be issued prior to construction.
• � * C
..
��sik11
...
/ KEVIN P. SULLIVAN
Lic ed Pr f ssional Engineer �•••••••••••••••••••• ••.••.•.........
-0 102419 • - .
State of Texas No. (72 1too \\ ANAL ENQ`?I tr�i
Walter P. Moore and Associates, Inc.
Tbi F Firm Reglstra8on No.1866
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 2
EXECUTIVE SUMMARY
V V
Site development improvements are being proposed for Lot 15 within the Tower Point-Vubdivision
located at the west corner of the intersection of Highway 6 and Highway 40 in the City of College
Station, Texas.
Storm sewer inlets will capture stormwater runoff from the site and portions of undeveloped off site
areas. An underground storm sewer system will convey runoff into the existing public storm sewer
system located in Private Drive G that ultimately discharges into Spring Creek located to the west of
the development. The existing bridge serving Highway 6 over Spring Creek contains stormwater
detention control structures to minimize peak runoff rates generated from this development. As
such, no additional stormwater detention is anticipated for this project. Previous design information
indicates that the control structures at the bridge minimize runoff rates and allow stormwater runoff
to back up within the Spring Creek tributary during storm events.
Storm sewer system components have been designed according to the Unified Stormwater Design
Guidelines of the City of College. The Rational Method was utilized to determine peak runoff rates,
pipe capacities, hydraulic grade lines, and other necessary hydraulic information. The storm sewer
system components have been designed to mitigate impacts to the existing downstream storm
sewer system and watercourses. No adverse impacts are expected with these improvements.
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 3
GENERAL LOCATION AND DESCRIPTION OF PROJECT AREA
The Tower Point Infrastructure Development - Lot 15 project is located within the Tower Point
Subdivision. This subdivision is approximately 128 acres and is located at the west corner of the
intersection of Highway 6 and Highway 40. The project area, Lot 15, is approximately 0.97 acres. It
is bounded by an existing Chase Bank property to the northeast, existing Drive G to the northwest,
an undeveloped property to the southwest, and Highway 40 to the and southeast. The extent of the
Drainage Study Area includes the project area and small portions of off -site to the southwest of the
project area which contribute runoff into the site storm sewer system.
The land developer for this project is the Weiner Development Corporation and the owner is College
Station Marketplace, L.P.
The project area is located within the Spring Creek named regulatory watercourse. Spring Creek
proceeds into Lick Creek, followed by the Navasota River and then the Brazos River. Beyond the
west limits of the project and within the Tower Point Subdivision is a stormwater detention facility
located within Spring Creek constructed previously to serve this development. An existing storm
sewer system is located along the recently constructed Private Drive G. No storm sewer systems
currently exist within the project limits of Lot 15.
Site improvements associated with this new commercial development include new parking, private
driveways, storm sewer systems, domestic water service systems, and sanitary sewer service
systems. The project area is a majority of undeveloped property with existing land cover consisting
primarily of rocky soil with minimal vegetation. There is also a portion of Private Drive G on this lot.
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 4
DRAINAGE WATERSHEDS AND STUDY AREAS
The entire project area is within the Spring Creek named regulatory watershed and drains into Spring
Creek. A FEMA flood panel map of the project area is located in the Appendix. From aerial
photography, it appears the Spring Creek watershed is generally undeveloped at this time.
Relatively small portions of the watershed along the northern and southern sides are currently
developed as primarily single family residential homes. The land cover of the remaining portions of
the watershed is predominately forested with small amounts of agricultural land.
Stormwater runoff in the existing undeveloped condition generally flows from southeast to northwest
across the project site area. A small portion of undeveloped land to the southwest of the project
area flows onto the project site and this runoff was accounted for in the drainage calculations.
Stormwater runoff from the project area will be conveyed into existing storm sewer systems located
along Private Drive G and ultimately to Arrington Road.
Proposed site improvements maintain existing drainage patterns to the extent possible. All
stormwater runoff generated from the project area proceeds overland into the proposed storm
sewer systems. The proposed storm sewer systems convey the captured runoff into the existing
storm sewer systems as mentioned previously. A proposed drainage area map is located in the
Appendix that delineates the overall watershed boundaries and the individual drainage boundaries
for each proposed storm sewer inlet in the proposed condition.
DRAINAGE DESIGN CRITERIA
Storm sewer systems have been designed according to the Unified Stormwater Design Guidelines
contained within the Site Design Standards manual of the City of Bryan and the City of College
Station. All storm sewer inlets and pipes have been designed according to these standards to
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 5
convey stormwater runoff within the project area for a 10 year storm event. Runoff rates have been
calculated using conservative runoff coefficients of 0.90 for all areas with minimum times of
concentrations of 10 minutes. According to the above referenced Design Guideline, rainfall
intensities for the 10 year storm event were calculated using the following equation:
i=80/(To +8.5)0763
The 100 year storm event was also calculated to determine the impacts on the storm sewer systems
and surrounding development. The rainfall intensity equation used for this storm event was:
i = 96 / (To + 8.0)""
The existing storm sewer inlets in the vicinity of the project area along Private Drive G were evaluated
as well.
COMPLIANCE WITH PROPOSED DEVELOPMENT ASSUMPTIONS
As indicated previously, all stormwater runoff from the proposed site development is conveyed into
the existing storm sewer systems along Private Drive G. The existing stormwater detention controls
located at the bridge serving Highway 6 and the existing storm sewer systems took into account for
future development. Both the Spring Creek detention control structures and the existing storm
sewer system used hydrologic assumptions of the anticipated land development to calculate fully
developed peak runoff rates for this project site, The hydrologic assumptions made for the
proposed storm sewer system are in compliance with the assumptions made for the existing
stormwater control structures as well as the existing storm sewer system. These assumptions
include using minimum time of concentrations and fully development runoff coefficients. As a result,
no additional stormwater detention in anticipated for this project.
The stormwater drainage report submitted for the storm sewer system improvements for Private
Drive G included assumptions of the anticipated runoff rates that would be generated from adjacent
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 6
lot development. These assumptions were reviewed during the storm sewer system analysis of this
site development and it was determined that there will be no adverse impacts on the existing storm
sewer systems within Private Drive G.
DRAINAGE SYSTEM DESIGN
Storm sewer system peak runoff rates and system components were designed using the Rational
Method. The Rational Method determines utilizes the peak runoff rates along with Manning's
equation and the continuity equation to determine pipe sizes, flow rates, head and friction losses,
gutter spreads, and hydraulic grade lines throughout the storm sewer system. The Rational Method
calculations are included in the Appendix for both the 10 year storm event and the 100 year storm
event.
CONCLUSION
The storm sewer system for the Tower Point Site Development — Lot 15 has been designed in
compliance with the Unified Drainage Design Guidelines for the City of College Station, Texas.
Storm sewer inlets and underground storm sewer pipes have been designed to capture and convey
stormwater runoff generated from the project area for a 10 year storm event. It should be expected
that during less frequent, more intense storm events all stormwater runoff may not be able to enter
the underground storm sewer system. It has been determined that during the 100 year storm event,
stormwater runoff that cannot enter the storm sewer system will continue flowing off site onto
Private Drive G. Runoff will continue to flow within the roadway until it has an opportunity to enter
the storm sewer system or discharges into Spring Creek as it currently does.
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 7
This report and the data contained within the Appendix should be reviewed during the design of the
storm sewer systems for future lot development within the project area to ensure that the
assumptions made in this report are valid and consistent with future land development and land use.
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 8
_ SWIM
Exhibit 1..................................................................
USGS Quadrangle - Wellborn Texas
Exhibit 2................................................................................................
FEMA Flood Map
Exhibit 3...........................................................................................
Overall Grading Plan
Exhibit 4..........................................................Developed
Conditions Drainage Area Map
Exhibit 5.............................................
Arrington Road Drainage Area Map & Calculations
Exhibit 6..................................Private
Drive G and Pre -Development Drainage Area Map
Exhibit 7...................................................................................Storm
Sewer Calculations
Exhibit 8...........................................................Appendix D - Technical Design Summary
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 9
EXHIBIT 1
f F •naweu.w T " �wwnv 4si• .ewnw�m n "�J M�a•• ELI • .
an.. u.n r.s �..w���nTn pf42F Y�•fuXM •N wa�� µnYuia�MN'W IMF �VVV�1 wmne a.•wn.w
wnMwwn • �.n..n�a ra.vin na •�•e...r
EXHIBIT 2
APPROXIMATE SCALE
100E 0 1000PEET
ZONE X
/ LIMIT OF DETAILED STUDY / o
Spring Creek Zy6 HOOK
Sprri ng Creek Spring s f
ry�y Tributary 1� TributaryA Creek e �¢� A,)
OG JQP SpF <
NATIONAL FLOOD INSURANCE PAOORAM
LIMIT OF ry �j/ x'+: ZONE AE 'FFVL F
tJ DETAILED STUDY N N� Q
� ^ '�`F, �� FIRM
�� N 2s19 QPP� FLOOD INSURANCE RATE MAP
Pjo Spring Creek Tributary LIMIT OF R
DETAILED BRAZOS COUNTY,
N� ZONEAE a� 2F STUDY o�. TEXAS AND
INCORPORATED AREAS
P, h 90
274 PLO �1 PANEL 205 OF 250
2Si61{t67y to _ • (SEE MAP INDEX FOR PANELS NOT PRINTED)
g ZONE A CONTAINS
AN n 276 Spring Creek JP a a N emNxuxm xunen vtxst sxmt
�
w ZONEAE Tributary
i N N ^' Cva®CTItnt.Umvr 'Ixxl, I'Sen v
B �4vE AE _ rvavvxnrtN exsas n+ss mas o
+
Q N�t� Spring Creek Tributary
/ � Py •� T n°N�° m"awn m:mmm"mm" M.N., ui0
City of College Station
_ONE X ?sa I I1 480083 2O LIMIT OF DETAILED STUDY
MAP NUMBER
`°S> a 48041CO205 D
ZONE•AEi I /Pp�P�Q, MAP REVISED:
2 Q DRIVE ® FEBRUARY 9, 200E
_ 9g
O S OAK
O
302
I I / Federal EmeCgencyManagement Agency
Tributary to
00) Spring Creek 1 Q \
307 Tributary D
� 2
/�y a �`_ .. a by P O
� \ ^�PNOPIPE v�
QGO�� 2 9 1pNE
\ P
315 o NpPeO MISTY N
��� Q W +_' V a• Thia is an oI.ial copy of a portion of the above referenced fiood map. It
LIMIT OF (G�.� \ w a w waa ,,trOotod wing F-MIT On -Line. mie map dose not reNect changes
DETAILED STUDY �� JCS 1 1 /1 . m a i (� p or amendments which may have been made subsequent to the date on the
< Z p Q U title block. For the latest product information abaut National Flood Insurance
Program flood maps check the FEMA Flood Map Store at v mew. mac fema.gov
EXHIBIT 3
Stormwater Drainage Report
for
Tower Point Site Development
for
Lot 15
College Station, Texas
Prepared for:
Weiner Development Corporation
Prepared by:
Walter P. Moore & Associates, Inc.
1301 McKinney, Suite 1100
Houston, TX 77010
TBPE Firm Registration No. 1856
January 25, 2011
Revised February 21, 2011
Revised March 11, 2011
KEVIN P.
TABLE OF CONTENTS
PROFESSIONAL CERTIFICATION.......................................................................................2
EXECUTIVESUMMARY ......................... ................................ .............................................. 3
GENERAL LOCATION AND DESCRIPTION OF PROJECT AREA.........................................4
DRAINAGE WATERSHEDS AND STUDY AREAS.............................................I...................5
DRAINAGE DESIGN CRITERIA............................................................................................6
COMPLIANCE WITH PROPOSED DEVELOPMENT ASSUMPTIONS...................................6
DRAINAGESYSTEM DESIGN..............................................................................................7
CONCLUSION.................................. .............. .... ........................................... ......................8
APPENDIX...........................................................................................................................9
Stormwater Drainage Repor
Tower Point Site Development - Lot 15 Page 1
PROFESSIONAL CERTIFICATION
This report and plans for the drainage design of Tower Point Site Development - Lot 15 project was
prepared by me (or under my supervision) in accordance with provisions of the Bryan/College
Station Unified Drainage Design Guidelines for the owners of the property. All licenses and permits
required by any and all state and federal regulatory agencies for the proposed drainage
improvements will be issued prior to construction.
Licensed Professional tngineer
State of Texas No. t0ztt(q
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 2
EXECUTIVE SUMMARY
Site development improvements are being proposed for Lot 15 within the Tower Point Subdivision
located at the west corner of the intersection of Highway 6 and Highway 40 in the City of College
Station, Texas.
Storm sewer inlets will capture stormwater runoff from the site. An underground storm sewer
system will convey runoff into an existing public storm sewer system located at the intersection of
Private Drive G and Private Drive C that ultimately discharges into Spring Creek located to the west
of the development. The existing bridge serving Highway 6 over Spring Creek contains stormwater
detention control structures to minimize peak runoff rates generated from this development. As
such, no additional stormwater detention is anticipated for this project. Previous design information
indicates that the control structures at the bridge minimize runoff rates and allow stormwater runoff
to back up within the Spring Creek tributary during storm events.
Storm sewer system components have been designed according to the Unified Stormwater Design
Guidelines of the City of College. The Rational Method was utilized to determine peak runoff rates,
pipe capacities, hydraulic grade lines, and other necessary hydraulic information. The storm sewer
system components have been designed to mitigate impacts to the existing downstream storm
sewer system and watercourses. No adverse impacts are expected with these improvements.
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 3
GENERAL LOCATION AND DESCRIPTION OF PROJECT AREA
The Tower Point Infrastructure Development — Lot 15 project is located within the Tower Point
Subdivision. This subdivision is approximately 128 acres and is located at the west corner of the
intersection of Highway 6 and Highway 40, The project area, Lot 15, is approximately 0.97 acres. It
is bounded by an existing Chase Bank property to the northeast, existing Drive G to the northwest,
an undeveloped property to the southwest, and Highway 40 to the and southeast. The extent of the
Drainage Study Area includes a third of the project area which is being captured by the site storm
sewer system and the remaining portion of the site sheet flows into the public storm sewer system in
Private Drive G.
The land developer for this project is the Weiner Development Corporation and the owner is College
Station Marketplace, L.P
The project area is located within the Spring Creek named regulatory watercourse. Spring Creek
proceeds into Lick Creek, followed by the Navasota River and then the Brazos River. Beyond the
west limits of the project and within the Tower Point Subdivision is a stormwater detention facility
located within Spring Creek constructed previously to serve this development. A public storm sewer
system is located along the recently constructed Private Drive G which connects to the public storm
sewer system in Private Drive C. An existing junction box and an existing 18" RCP pipe is located
near the north corner of the site in public utility easement along Private Drive G which connects into
the storm sewer system that crosses Private Drive C. No storm sewer systems currently exist within
the project limits of Lot 15.
Site improvements associated with this new commercial development include new parking, private
driveways, storm sewer systems, domestic water service systems, and sanitary sewer service
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 4
systems. The project area is a majority of undeveloped property with existing land cover consisting
primarily of rocky soil with minimal vegetation. There is also a portion of Private Drive G on this lot.
DRAINAGE WATERSHEDS AND STUDY AREAS
The entire project area is within the Spring Creek named regulatory watershed and drains into Spring
Creek. A FEMA flood panel map of the project area is located in the Appendix. From aerial
photography, it appears the Spring Creek watershed is generally undeveloped at this time.
Relatively small portions of the watershed along the northern and southern sides are currently
developed as primarily single family residential homes. The land cover of the remaining portions of
the watershed is predominately forested with small amounts of agricultural land.
Stormwater runoff in the existing undeveloped condition generally flows from southeast to northwest
across the project site area. A small portion of undeveloped land to the southwest of the project
area sheet flows across the project site and into the public storm sewer system in Drive G.
Stormwater runoff from the project area will be conveyed into the public storm sewer system by
connection into an existing junction box located at the intersection of Private Drive G and Private
Drive C. The existing 18" RCP storm sewer pipe does not have the capacity to handle the adjacent
Chase Bank lot site and Lot 15, therefore it will be removed and replaced with a new 24" RCP (Class
III) storm sewer pipe. This new 24" RCP storm sewer pipe will connect into the existing storm sewer
system located at the intersection of Private Drive G and Private Drive C and ultimately to Arrington
Road.
Proposed site improvements maintain existing drainage patterns to the extent possible. All
stormwater runoff generated from the project area proceeds overland into the proposed storm
sewer systems. The proposed storm sewer systems convey the captured runoff into the existing
Stormwater Drainage Report
Tower Point Site Development — Lot 16 Page 5
storm sewer systems as mentioned previously. A proposed drainage area map is located in the
Appendix that delineates the overall watershed boundaries and the individual drainage boundaries
for each proposed storm sewer inlet in the proposed condition.
DRAINAGE DESIGN CRITERIA
Storm sewer systems have been designed according to the Unified Stormwater Design Guidelines
contained within the Site Design Standards manual of the City of Bryan and the City of College
Station. All storm sewer inlets and pipes have been designed according to these standards to
convey stormwater runoff within the project area for a 10 year storm event. Runoff rates have been
calculated using conservative runoff coefficients of 0.90 for all areas with minimum times of
concentrations of 10 minutes. According to the above referenced Design Guideline, rainfall
intensities for the 10 year storm event were calculated using the following equation:
i = 80 / (Tc + 8.5)0'163
The 100 year storm event was also calculated to determine the impacts on the storm sewer systems
and surrounding development. The rainfall intensity equation used for this storm event was:
i = 96 / (Tc + 8.0)0.130
The existing storm sewer inlets in the vicinity of the project area along Private Drive G and near
Private Drive C were evaluated as well.
COMPLIANCE WITH PROPOSED DEVELOPMENT ASSUMPTIONS
As indicated previously, all stormwater runoff from the proposed site development is conveyed into
the existing junction box and new 24" RCP pipe within the public utility easement near the north
corner of the site. This new 24" storm sewer pipe will connect into the existing storm sewer system
located at the intersection of Private Drive G and Private Drive C and ultimately to Arrington Road.
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 6
The stormwater drainage report submitted for the storm sewer system improvements for Private
Drive G included assumptions of the anticipated runoff rates that would be generated from adjacent
lot development. These assumptions were reviewed during the storm sewer system analysis of this
site development and it was determined that both the adjacent Chase Bank lot and Lot 15 were to
be captured in the storm sewer system near the intersection of Private Drive G and Private Drive C.
Based on this information, the existing 18" RCP storm sewer pipe does not have the capacity to
handle the runoff from both lots and will be removed and replaced with a proposed 24" RCP storm
sewer. The proposed 24" RCP storm sewer pipe will connect to the existing junction located on the
east corner of Private Drive G and Private Drive C and outfall into the existing 24" storm sewer
system that crosses Private Drive C. There are no additional impacts to the existing storm sewer
systems downstream.
The existing stormwater detention controls located at the bridge serving Highway 6 and the existing
storm sewer systems took into account for future development. Both the Spring Creek detention
control structures and the existing storm sewer system used hydrologic assumptions of the
anticipated land development to calculate fully developed peak runoff rates for this project site. The
hydrologic assumptions made for the proposed storm sewer system are in compliance with the
assumptions made for the existing stormwater control structures as well as the existing storm sewer
system. These assumptions include using minimum time of concentrations and fully development
runoff coefficients. As a result, no additional stormwater detention in anticipated for this project.
DRAINAGE SYSTEM DESIGN
Storm sewer system peak runoff rates and system components were designed using the Rational
Method. The Rational Method determines utilizes the peak runoff rates along with Manning's
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 7
equation and the continuity equation to determine pipe sizes, flow rates, head and friction losses,
gutter spreads, and hydraulic grade lines throughout the storm sewer system. The Rational Method
calculations are included in the Appendix for both the 10 year storm event and the 100 year storm
event.
CONCLUSION
The storm sewer system for the Tower Point Site Development — Lot 15 has been designed in
compliance with the Unified Drainage Design Guidelines for the City of College Station, Texas.
Storm sewer inlets and underground storm sewer pipes have been designed to capture and convey
stormwater runoff generated from the project area for a 10 year storm event. It should be expected
that during less frequent, more intense storm events all stormwater runoff may not be able to enter
the underground storm sewer system. It has been determined that during the 100 year storm event,
stormwater runoff that cannot enter the storm sewer system will continue flowing off site onto
Private Drive G. Runoff will continue to flow within the roadway until it has an opportunity to enter
the storm sewer system or discharges into Spring Creek as it currently does.
This report and the data contained within the Appendix should be reviewed during the design of the
storm sewer systems for future lot development within the project area to ensure that the
assumptions made in this report are valid and consistent with future land development and land use.
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 8
EXHIBIT 4
10-YEAR STORM SEWER CALCULATIONS
WALTER P. MOORE & ASSOCIATES, ING
1301 MCKINNEY, SUITE 1100
HOUSTON, TX 77010
LOCATION: Tower Point Lot 15 - College Station, TX
BY: HMG DATE: 3/14/2011
CHECKED BY: DATE:
JOB NO: 23-05040-13
MH/
MH/
AREA
AREA
SUM OF
C'A
SUM OF
INTENSITY
T.
At
REACH
DIAM.
Width
SLOPE
MANNINGS
DESIGN
FALL
FLOWUNE
Yn
ACTUAL
HYDRAULIC
CHANGE
ELEVATION OF
ELEVATION OF
INLET
INLET
AREA
C'A
I
Height
"n"
Q full
V full
ELEVATIONS
V
GRADIENT
IN HEAD
HYDRAULIC GRADIENT
GROUND
FROM
TO
(FT')
ACRES
ACRES
IN/HR
MIN
MIN
F
IN
IN
%
CFS
FT/S
F
UPSTREAM
DOWNSTREAM
F
FT/S
%
F
UPSTREAM
DOWNSTREAM
UPSTREAM
DOWNSTREAM
1-1
1-2
5055
0.12
0.12
0.10
0.10
8.63
F4.4O
10.00
0.19
56
12
0
1.00
0.009
5.146
6.55
0.56
316.10
315.54
0.28
4.93
1.000
0,560
304.090
303.53
319.10
318.85
1-2
MH-3
4019
0.09
0.21
0.08
0.19
8.57
10.19
0.22
75
12
0
1.00
0.009
5.146
6.55
0.75
315.54
314.79
0.38
5.79
1.000
0.750
303.630
302.78
318.85
319.11
MH-3
1-4
0
0.00
0.34
0.00
0.30
8.49
10.41
0.19
73
12
0
1.00
0.009
5.146
6.55
0.73
314.79
314.06
0.50
6.55
1.000
0.730
302.780
302.05
319.11
318.00
1-4
EX. JBOX
2992
0.07
0.58
0.06
0.52
8.43
10.59
0.24
105
12
0
1.00
0.009
5,146
6.55
1.05
300.05
299.00
0.71
7.36
1,000
1.050
302.050
301.00
318.00
304.00
EX, JBOX
OUTFALL
0
0.00
0.58
0.00
0.52
8.35
10.83
0.03
15
24
0
0.55
0.009
24.234
7.71
0.08
294.33
294.25
0.96
7.59
0.550
0.082
297.330
297.25
304.00
304.00
1-3A
MH-3
5525
0.13
0.13
0.11
0.11
8.53
0.99
10.00
0.10
31
12
0
1.00
0.009
5.146
6.55
0.31
1 315.36
315.05
0.30
5.05
1.000
0.310
303.090
302.78
319.11
318.60
I-4A
14
1 7657
1 0.18
0.18
0.16
0.16
8.63
1.37
10.00
0.18
60
12
0
1.00
0.009
5.1 66
6.55
0,601
313.23
1 312.63
0.35
5.54
1.000
0.600
302.650
1 302.05
318.00
318.60
CHASE
EX. JBOX
39200
0.90
0.90
0.81
0.81
8.63
6.99
10.00
0.18
60
18
0
0.32
0.009
8.583
4.86
1 0,191
305.49
1 305.30
1.03
1 5.41
1 0.320
1 0.192
1 302.972
1 302.78
1 318.60
318.60
CAPACITY OF EXISTING INLET THAT WILL TAKE THE CHASE BANK & AT&T STORM WATER IS 12.74 C.F.S.
NOTES:
DESIGN BASED ON 2-YEAR RAINFALL
RUNOFF COEFFICIENT EQUALS
INTENSITY CALCULATIONS BASED ON CITY OF HOUSTON DESIGHN MANUAL CHAPTER 9 PAGE CH9115 OF 17
TIME OF CONCENTRATION (T c) = 10A0'17s + 15 MIN (USE =MIN) (6)
STARTING HGL EQUALS THE TOP OF INSIDE OF OUTFALL PIPE
ALL PIPES ARE CIRCULAR
P:\23\2005\05040-13\Design & Studies\Calculations\3-14-11 05040-13 Drainage calcs 3/11/2011
EXHIBIT 7
100-YEAR STORM SEWER CALCULATIONS
WALTER P. MOORE & ASSOCIATES, INC
1301 MCKINNEY, SUITE 1100
HOUSTON, TX 77010
LOCATION: Tower Point Lot 15 - College Station, TX
BY: HMG DATE: 3/14/2011
CHECKED BY: DATE:
JOB NO: 23-05040-13
MH/
MH/
AREA
AREA
SUM OF
- C'A
SUM OF
INTENSITY
FLOW
Tc
Al
REACH
CIAM.
Width
SLOPE
MANNINGS
DESIGN
FALL
FLOWLINE
Yn
ACTUAL
HYDRAULIC
CHANGE
ELEVATION OF
ELEVATION OF
INLET
INLET
AREA
C'A
I
Q
Hei ht
"n"
full
ELEVATIONS
V
GRADIENT
IN HEAD
HYDRAULIC GRADIENT
GROUND
FROM
TO
(FT2)
ACRES
ACRES
IN/HR
CFS
MIN
MIN
F
IN
IN
%
/S
F
UPSTREAM
DOWNSTREAM
F
FT/S
%
F
UPSTREAM
DOWNSTREAM
UPSTREAM
DOWNSTREAM
1-1
1-2
5055
0.12
0.12
0.10
0.10
11.64
122
10.00
0.17
56
12
0
1.00
0.009
55
0.56
316.10
315.54
0.33
5.36
1.000
0,560
304,439
303.88
319.10
318.85
1-2
MH-3
4019
0.09
0.21
0.08
0.19
11.56
2.17
10.17
0.20
75
12
0
1.00
0,009
55
0.75
315.54
314.79
0.45
6.27
1.000
0.750
303.879
303.13
318.85
319.11
MH-3
1-4
0
0.00
0.34
0.00
0.30
11.47
3.46
10.37
0.17
73
12
0
1.00
0.009
f24.2347.71
55
0.73
314.79
314.06
0.60
7.03
1.000
0.730
303,129
302.40
319.11
318.00
1-4
EX. JBOX
2992
0.07
0.58
0.06
0.52
11.39
5.94
10.55
0.23
105
12
0
1.00
0.009
55
1.05
300.05
299.00
1.00
7.56
1.332
1.399
302.399
301.00
378.00
304.00
EX, JBOX
OUTFALL
0
0.00
0.58
0.00
0.52
11.29
15.31
10.78
0.03
15
24
0
0.55
0.009
71
0.08
294.33
294.25
1.15
8.16
0.550
0.082
297,330
297.25
304. 00
304.00
1-3A
MH-3
5525
0.13
0.13
0.11
0.11
11.64
1.33
10.00
0.09
31
12
0
1.00
0.009
55
0.31
315.36
315.05
0.35
5.50
1.000
0.310
303.439
303A3
319.11
318.60
I-4A
1-4
1 7657
0.18
1 0.18
0.16
0.16
11.64
1.84
10.00
0.17
60
12
0
100
1 0.009
5.146
6.55
0.60
313.23
312.63
0.41
6.01
1.000
0.600
302,999
302A0
318.00
318.60
CHASE
EX. JBOX
39200
0.90
0.90
0.81
0.81
1 11.64
1 9.43
1 10.001
0.19
1 60
1 18
0
0.32
1 0.009
8.583
4.86
0.19
305.49
305.30
1.50
6.33
0.386
0.232
303.361
303.13
318.60
318.60
CAPACITY OF EXISTING INLET THAT WILL TAKE THE CHASE BANK & AT&T STORM WATER IS 12.74 C.F.S.
NOTES:
DESIGN BASED ON 2-YEAR RAINFALL
RUNOFF COEFFICIENT EQUALS 0.9 (5)
INTENSITY CALCULATIONS BASED ON CITY OF HOUSTON DESIGHN MANUAL CHAPTER 9 PAGE CH9/15 OF 17
TIME OF CONCENTRATION (Tc)=10A0"6+15 MIN (USE =MIN) (6)
STARTING HGL EQUALS THE TOP OF INSIDE OF OUTFALL PIPE
ALL PIPES ARE CIRCULAR
P:\23\2005\05040-13\Design & Studies\Calculations\3-14-11 05040-13 Drainage calcs 3/11/2011
Stormwater Drainage Report
for
Tower Point Site Development
for
Lot 15
College Station, Texas
Prepared for:
Weiner Development Corporation
Prepared by:
Walter P. Moore & Associates, Inc.
1301 McKinney, Suite 1100
Houston, TX 77010
TBPE Firm Registration No. 1856
January 25, 2011
Revised February 21, 2011
Revised March 11, 2011
Revised November 21. 2011
21 1W V
13 :W
�� �3 �g'
TABLE OF CONTENTS
PROFESSIONAL CERTIFICATION
EXECUTIVE SUMMARY....................................................................................................... 3
GENERAL LOCATION AND DESCRIPTION OF PROJECT AREA ........................................ 4
DRAINAGE WATERSHEDS AND STUDY AREAS................................................................ 5
DRAINAGE DESIGN CRITERIA............................................................................................ 6
COMPLIANCE WITH PROPOSED DEVELOPMENT ASSUMPTIONS ................................... 7
DRAINAGE SYSTEM DESIGN............................................................................................. 8
CONCLUSION..................................................................................................................... 8
APPENDIX......................................................................................................................... 10
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 1
PROFESSIONAL CERTIFICATION
This report and plans for the drainage design of Tower Point Site Development - Lot 15 project was
prepared by me (or under my supervision) in accordance with provisions of the Bryan/College
Station Unified Drainage Design Guidelines for the owners of the property. All licenses and permits
required by any and all state and federal regulatory agencies for the proposed drainage
improvements will be issued prior to construction.
Licensed Professional Engineer
State of Texas No.
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 2
EXECUTIVE SUMMARY
Site development improvements are being proposed for Lot 15 within the Tower Point Subdivision
located at the west corner of the intersection of Highway 6 and Highway 40 in the City of College
Station, Texas.
Storm sewer inlets will capture stormwater runoff from the site. An underground storm sewer
system will convey runoff into an existing public storm sewer system located along Private Drive G,
near the intersection at Private Drive C that ul imately discharges into Spring Creek located to the
west of the development. The existing bridge serving Highway 6 over Spring Creek contains
stormwater detention control structures to minimize peak runoff rates generated from this
development. As such, no additional stormwater detention is anticipated for this project. Previous
design information indicates that the control structures at the bridge minimize runoff rates and allow
stormwater runoff to back up within the Spring Creek tributary during storm events.
Storm sewer system components have been designed according to the Unified Stormwater Design
Guidelines of the City of College. The Rational Method was utilized to determine peak runoff rates,
pipe capacities, hydraulic grade lines, and other necessary hydraulic information. The storm sewer
system components have been designed to mitigate impacts to the existing downstream storm
sewer system and watercourses. No adverse impacts are expected with these improvements.
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 3
GENERAL LOCATION AND DESCRIPTION OF PROJECT AREA
The Tower Point Infrastructure Development — Lot 15 project is located within the Tower Point
Subdivision. This subdivision is approximately 128 acres and is located at the west corner of the
intersection of Highway 6 and Highway 40. The project area, Lot 15, is approximately 0.97 acres. It
is bounded by an existing Chase Bank property to the northeast, existing Drive G to the northwest,
an undeveloped property to the southwest, and Highway 40 to the and southeast. The extent of the
Drainage Study Area includes a third of the project area which is being captured by the site storm
sewer system and the remaining portion of the site sheet flows into the public storm sewer system in
Private Drive G.
The land developer for this project is the Weiner Development Corporation and the owner is College
Station Marketplace, L.P
The project area is located within the Spring Creek named regulatory watercourse. Spring Creek
proceeds into Lick Creek, followed by the Navasota River and then the Brazos River. Beyond the
west limits of the project and within the Tower Point Subdivision is a stormwater detention facility
located within Spring Creek constructed previously to serve this development. A public storm sewer
system is located along the recently constructed Private Drive G which connects to the public storm
sewer system in Private Drive C. An existing junction box and an existing 18" RCP pipe is located
near the north corner of the site in public utility easement along Private Drive G which connects into
the storm sewer system that crosses Private Drive C. No storm sewer systems currently exist within
the project limits of Lot 15.
Site improvements associated with this new commercial development include new parking, private
driveways, storm sewer systems, domestic water service systems, and sanitary sewer service
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 4
systems. The project area is a majority of undeveloped property with existing land cover consisting
primarily of rocky soil with minimal vegetation. There is also a portion of Private Drive G on this lot.
DRAINAGE WATERSHEDS AND STUDY AREAS
The entire project area is within the Spring Creek named regulatory watershed and drains into Spring
Creek. A FEMA flood panel map of the project area is located in the Appendix. From aerial
photography, it appears the Spring Creek watershed is generally undeveloped at this time.
Relatively small portions of the watershed along the northern and southern sides are currently
developed as primarily single family residential homes. The land cover of the remaining portions of
the watershed is predominately forested with small amounts of agricultural land.
Stormwater runoff in the existing undeveloped condition generally flows from southeast to northwest
across the project site area. A small portion of undeveloped land to the southwest of the project
area sheet flows across the project site and into the public storm sewer system in Drive G.
Stormwater runoff from the new shared driveway between Lot 15 and Lot 16 will be collected by a
new BB -inlet located on the north side of the shared driveway, near Private Drive G. The new BB -
inlet will connect to the existing junction box located near the west corner of the property where the
new shared driveway connects to Private Drive G. This existing junction box is designed to collect
drainage from Lot 16 per the Drainage Area Map - Exhibit 6, therefore a new 18" stub -out has been
extended into Lot 16 for future development. Stormwater runoff from the rest of the project area will
be conveyed into the public storm sewer system by a new BB -inlet located on the north corner of
the property and a new 12" connection into an existing junction box north located northwest of the
property, near the intersection of Private Drive G and Private Drive C. The existing junction box also
captures the drainage from the adjacent Chase Bank lot site and is connected by an existing 18"
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 5
RCP storm sewer pipe to the existing storm sewer system located at the intersection of Private Drive
G and Private Drive C and ultimately to Arrington Road.
Proposed site improvements maintain existing drainage patterns to the extent possible. All
stormwater runoff generated from the project area proceeds overland into the proposed storm
sewer systems. The proposed storm sewer systems convey the captured runoff into the existing
storm sewer systems as mentioned previously. A proposed drainage area map is located in the
Appendix that delineates the overall watershed boundaries and the individual drainage boundaries
for each proposed storm sewer inlet in the proposed condition.
DRAINAGE DESIGN CRITERIA
Storm sewer systems have been designed according to the Unified Stormwater Design Guidelines
contained within the Site Design Standards manual of the City of Bryan and the City of College
Station. All storm sewer inlets and pipes have been designed according to these standards to
convey stonnwater runoff within the project area for a 10 year storm event. Runoff rates have been
calculated using conservative runoff coefficients of 0.90 for all areas with minimum times of
concentrations of 10 minutes. According to the above referenced Design Guideline, rainfall
intensities for the 10 year storm event were calculated using the following equation:
i = 80 / (To + 8.5)""
The 100 year storm event was also calculated to determine the impacts on the storm sewer systems
and surrounding development. The rainfall intensity equation used for this storm event was:
i = 96 / (Tc + 8.0)0 730
The existing storm sewer inlets in the vicinity of the project area along Private Drive G and near
Private Drive C were evaluated as well.
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 6
COMPLIANCE WITH PROPOSED DEVELOPMENT ASSUMPTIONS
As indicated previously, stormwater runoff from the proposed site development is conveyed into
existing junction boxes located on the west and north corners of the property and outfall into the
existing storm sewer system located at the intersection of Private Drive G and Private Drive C and
ultimately to Arrington Road. The stormwater drainage report submitted for the storm sewer system
improvements for Private Drive G included assumptions of the anticipated runoff rates that would be
generated from adjacent lot development. The storm sewer system analysis of this site
development included review of the design runoff from the adjacent Chase Bank lot and Lot 15 to
be captured in the storm sewer system near the intersection of Private Drive G and Private Drive C.
Based on this information and review of the new hydraulic grade line, the existing 18" RCP storm
sewer pipe and the existing junction box near the north property corner can handle the runoff from
both the Chase Bank lot and Lot 15 and can remain in place with the new 12" storm sewer installed
per the elevations on the plans. Assumptions of the anticipated runoff rates from Lot 16, along with
the additional runoff from a portion of Lot 15 were also reviewed and it was determined the new BB -
inlet can capture the runoff from the shared driveway and not cause an adverse impact to the
existing storm sewer systems downstream.
The existing stormwater detention controls located at the bridge serving Highway 6 and the existing
storm sewer systems took into account for future development. Both the Spring Creek detention
control structures and the existing storm sewer system used hydrologic assumptions of the
anticipated land development to calculate fully developed peak runoff rates for this project site. The
hydrologic assumptions made for the proposed storm sewer system are in compliance with the
assumptions made for the existing stormwater control structures as well as the existing storm sewer
Stormwater Drainage Report
Tower Point Site Development — Lot 15 Page 7
system. These assumptions include using minimum time of concentrations and fully development
runoff coefficients. As a result, no additional stormwater detention in anticipated for this project.
DRAINAGE SYSTEM DESIGN
Storm sewer system peak runoff rates and system components were designed using the Rational
Method. The Rational Method determines utilizes the peak runoff rates along with Manning's
equation and the continuity equation to determine pipe sizes, flow rates, head and friction losses,
gutter spreads, and hydraulic grade lines throughout the storm sewer system. The Rational Method
calculations are included in the Appendix for both the 10 year storm event and the 100 year storm
event.
CONCLUSION
The storm sewer system for the Tower Point Site Development - Lot 15 has been designed in
compliance with the Unified Drainage Design Guidelines for the City of College Station, Texas.
Storm sewer inlets and underground storm sewer pipes have been designed to capture and convey
stormwater runoff generated from the project area for a 10 year storm event. It should be expected
that during less frequent, more intense storm events all stormwater runoff may not be able to enter
the underground storm sewer system. It has been determined that during the 100 year storm event,
stormwater runoff that cannot enter the storm sewer system will continue flowing off site onto
Private Drive G. Runoff will continue to flow within the roadway until it has an opportunity to enter
the storm sewer system or discharges into Spring Creek as it currently does.
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 8
This report and the data contained within the Appendix should be reviewed during the design of the
storm sewer systems for future lot development within the project area to ensure that the
assumptions made in this report are valid and consistent with future land development and land use.
Stormwater Drainage Report
Tower Point Site Development - Lot 15 Page 9
10-YEAR STORM SEWER CALCULATIONS
WALTER P. MOORE & ASSOCIATES, INC
1301 MCKINNEY, SUITE 1100
HOUSTON, TX 77010
LOCATION: Tower Point Lot 15 - College Station, TX
BY: HMG DATE: 11/15/2011
CHECKED BY: DATE:
JOB NO: 23-05040-13
MH/
MH/
AREA
AREA
SUM OF
C*A
SUM OF
INTENSITY
FLOW
Tc
At
REACH
DIAM.
Width
SLOPE
MANNINGS
DESIGN
FALLI
FLOWLINE
Yn
ACTUAL
HYDRAULIC
CHANGE
ELEVATION OF
ELEVATION OF
INLET
INLET
AREA
C*A
I
Q
Height
W.I
Q full
V full
ELEVATIONS
V
GRADIENT
IN HEAD
HYDRAULIC GRADIENT
GROUND
FROM
TO
FT
ACRES
ACRES
IN/HR)
(CFS)
(MIN
MIN
F
IN
IN
%
CFS
FT/S
F
UPSTREAM
DOWNSTREAM
F
FT/S
%
F
UPSTREAM
DOWNSTREAM
UPSTREAM
DOWNSTREAM
1-1
EX. JBOX
0
0.52
0.52
0.47
0.47
8.63
4.04
10.00
0.21
90
12
0
1.00
0.009
5.146
6.55
0.90
301.90
301.00
0.67
7.25
1.000
0.900
302,142
301.24
318.00
304.00
EX, JBOX
OUTFALL
0
0.00
1.42
0.00
1.28
8.56
17.93
10.21
0.02
15
18
0
0.32
0.009
8,583
4.86
0.05
298.08
298.03
1.50
10.15
1.397
0.210
301.242
301.03
304.00
302.35
CHASE
EX. JBOX
39200
0.90
0.90
0.81
0.81
8.63
6.99
10.00
0.18
60
18
0
0.32
0,009
8,583
4.86
0.19
305.49
305.30
1.03
5.41
0.320
0.192
301.434
301,24
304.00
318.60
1-2
EXJBOX2
0A0
0,40
0.36
0.36
8.63
3.11
moo
0.06
23
12
0
1.00
0.009
5.146
6.55
0.23
299A7
299.24
0.56
6.86
1.000
0.230
302.470
302.24
30900
308.75
CAPACITY OF EXISTING INLET THAT WILL TAKE THE CHASE BANK & AT&T STORM WATER IS 12.74 C.F.S.
NOTES:
1. DESIGN BASED ON 2-YEAR RAINFALL
2. RUNOFF COEFFICIENT EQUALS 0.9 (5)
3. INTENSITY CALCULATIONS BASED ON CITY OF HOUSTON DESIGHN MANUAL CHAPTER 9 PAGE CH9/15 OF 17
4. TIME OF CONCENTRATION (Tc) = 10A°"c+ 15 MIN (USE =MIN) (6)
5. STARTING HGL EQUALS THE TOP OF INSIDE OF OUTFALL PIPE
6. ALL PIPES ARE CIRCULAR
P:\23\2005105040-13\Design & Studies\Calculations\11-15-11 05040-13 Drainage caics 11/21/2011
100-YEAR STORM SEWER CALCULATIONS
WALTER P. MOORE & ASSOCIATES, INC
1301 MCKINNEY, SUITE 1100
HOUSTON, TX 77010
LOCATION: Tower Point Lot 15 - College Station, TX
BY: HMG DATE: 11/15/2011
CHECKED BY: DATE:
JOB NO: 23-05040-13
MH/
MH/
AREA
AREA
SUM OF
C-A
SUM OF
INTENSITY
FLOW
Tc
et
REACH
MANNINGS
DESIGN
FALL
FLOWUNE
Yn
ACTUAL
HYDRAULIC
CHANGE
ELEVATION OF
ELEVATION OF
INLET
INLET
AREA
C`A
1
Q
"n.,
O full
V full
ELEVATIONS
V
GRADIENT
IN HEAD
HYDRAULIC GRADIENT
GROUND
FROM
TO
FT
ACRES
ACRES
IN/HR
CFS
MIN
MIN
CFS
FT/S
UPSTREAM
DOWNSTREAM
FT/S
%
F
UPSTREAMDOWNSTREA
UPSTREAM
DOWNSTREAM
1-1
EX. JBOX
0
0.52
0.52
0.47
0.47
11.64
5.45
10.00
0.20
90
0.009
5.146
6.55
0.90
301.90
301.00
0.89
7.40
1,000
0.900
302.313
301.41
318.00
304.00
EX. JBOX
OUTFALL
0
0.00
1.42
0.00
1.28
11.54
24.18
10.20
0.02
15
0.009
8.583
4.86
0.05
298.08
298.03
1,50
13.68
2.540
0,381
301.413
301.03
304.00
302.35
CHASE
EX. JBOX
3 2200
0.90
0.90
0.81
0.81
11.64
9.43
10.00
0.19
60
0.009
8S83
4S6
0.19
305.49
305.30
1.50
5.33
0.386
0,232
301.645
301.41
304.00
318.60
1-2
EX JBOX2
0.40
0.40
0.36
0.36
11.64
4.19
10.00
0.05
23
001.00
0.009
5.146
6.55
0,23
299.47
299.24
6.69
7.30
1.000
0.230
302.470
302.24
309.00
308.75
CAPACITY OF EXISTING INLET THAT WILL TAKE THE CHASE BANK & AT&T STORM WATER IS 12.74 C.F.S.
NOTES:
1. DESIGN BASED ON 2-YEAR RAINFALL
2. RUNOFF COEFFICIENT EQUALS 0.9 (5)
3. INTENSITY CALCULATIONS BASED ON CITY OF HOUSTON DESIGHN MANUAL CHAPTER 9 PAGE CH9/15 OF 17
4. TIME OF CONCENTRATION (Tc) = 10A°''76 + 15 MIN (USE =MIN) (6)
5. STARTING HGL EQUALS THE TOP OF INSIDE OF OUTFALL PIPE
6. ALL PIPES ARE CIRCULAR
P:\23\2005\05040-13\Design & Studies\Calculations\11-15-11 05040A3 Drainage talcs 11/21/2011