From: Kevin Sullivan
Sent: Monday, December 27, 2010 5:09 PM
To: 'Ihovde@csb(.gov'; 'Ebridges@cstx.gov'
Cc: Lakshmi Palamadai; Heather Guillen
Subject: Tower Point Lot 15 (AT&T)
<< File: 2010-12-27_Exhibit-Accessibility.pdf>> << File: 2010-12-24_Exhibit-Connectivity Masterplanl.pdf>>
Lauren,
See below for the 2 issues we discussed last week:
1. Sidewalk along Private Drive "G":
Drive "G" is currently at a 6%slope in some areas. The sidewalk adjacent to the drive would need to be at 5% max
to be accessible (see blue sidewalk attached for accessible route). As you can see, making this sidewalk accessible
will require some switchback ramps and potentially some small walls. However, this sidewalk is not required to be
accessible because there is an alternate accessible route to the public ROW (see red sidewalk attached for
accessible route). Please let us know whether the sidewalk along Drive "G" should be accessible.
2. Access from Building to Drive "G":
The difference in elevation from the building to Drive "G" is 11' to 17'. Therefore, it will be very difficult to obtain
access from the building to the drive. We would be required to build switchback ramps with walls (see ramps in
green attached). This switchback ramp and walls would be built over a PUE. Alternatively, see the attached map
with connectivity routes in cyan. Please confirm the access from the Building to Drive "G" can be eliminated and
that access will come elsewhere.
Let me know should you have any questions or comments.
Thanks,
Kevin P. Sullivan, P.E., LEEDO AP
Associate
WALTER P MOORE
From:
Lauren Hovde
To:
Erika Bridges; Kevin Sullivan
CC:
'Mike Coontz'; Heather Guillen; Lakshmi Palamadai; Ray; Stuart Allison
Date:
1/4/2011 12:05 PM
Subject:
RE: Tower Point Lot 15 (AT&T)
Kevin,
Thanks for the time to consider this issue. A sidewalk will be required to extend up the length of the
driveway that comes off of Private Drive G. No switchback sidewalk will be necessary.
Lauren
Lauren Amelia Hovde '06
From:
Kevin Sullivan <KSullivan@walterpmoore.com>
To:
Lauren Hovde <Lhovde@cstx.gov>, "Ebridges@cstx.gov" <Ebridges@cstx.gov>
CC:
Ray <rayd@cdaarchitects.com>, Stuart Allison <stuarta@cdaarchitects.com>...
Date:
1/4/2011 12:30 PM
Subject:
RE: Tower Point Lot 15 (AT&T)
Attachments:
2011-01-04_Exhibit - Accessibility.pdf
Lauren,
We will need to widen the drive to allow for the sidewalk. I have attached another sketch that
shows how we propose to do this. Please let me know should you have any comments. We will
proceed.
Thanks,Kevin P. Sullivan, P.E., LEEDOAP
From:
Lauren Hovde
To:
Erika Bridges; Kevin Sullivan
CC:
Steve Smith
Date:
1202011 11:14 AM
Subject:
Re: Tower Point Lot 28
Kevin,
I still don't think that an aerial truck is going to be able to make the turn into the two fire lane
driveways. Can you send me an exhibit of how you've made it work? Thanks!
Lauren
From:
Kevin Sullivan <KSullivan@walterpmoore.com>
To:
Lauren Hovde <Lhovde@cstx.gov>, Erika Bridges <Ebridges@cstx.gov>
CC:
Heather Guillen <hguillen@walterpmoore.com>, Mike Coontz <mcoontz@weiner...
Date:
1202011 11:02 AM
Subject:
Lot 15 Site Plan
Attachments:
5040-13-C200-LA Layoutl (1).pdf
Lauren/Erika,
Here is the site plan for Lot 15. As discussed we are providing access to Drive G via the stairs. Let me
know should you have any questions or comments. We'll be submitting our drawings shortly for review.
Thanks,
Kevin P. Sullivan, P.E., LEEDO AP
Associate
WALTER P MOORE
5040-13-C200-LA
Layoutl (1).pdf
WALTER P MOORE
April 6, 2011
Ms. Erika Bridges
Graduate Engineer
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, Texas 77842
RE: Fire Flow Demands
Tower Point Infrastructure Lot 15, Block 3
WPM Project No. 23-05040-13
Dear Ms. Bridges:
The fire flow requirement for a 3887 SF, type IIB building construction classification,1s 1,500 gallons
per minute based on the 2009 International Fire Code.
A fire hydrant is proposed along the approved fire lane within 300 feet from the proposed building.
Sincerely,
WA ER P. MO RE AND ASSOCIATES, INC.
Kev n P. Sul P.E.
Associate
Walter
TOPE Firm Rellikh Lion No. IV!
P:\23\2005\05040-13\Correspondence\Letters\04-06-2011 Fire Flow Reqts Letter.doex
1301 MCKINNEY, SUITE lion
HOUSTON, TEXAS 77010
PHONE: 713.630.7300 FAX:713.630.7396
www.WALTERPMOORE.com
WALTER P MOORE
January 26, 2010
Ms. Erika Bridges
Graduate Engineer
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, Texas 77842
RE: Tower Point Infrastructure, College Station, Texas
Lot 15, Block 3
Letter Acknowledging City Standards
Dear Ms. Bridges:
The purpose of this letter is to acknowledge that the construction plans for the public infrastructure
for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design
Guideline Manual. Any alternate design or construction methodology that was used is listed below:
(N/A)
I also acknowledge, to the best of my knowledge, that the details provided in the construction plans
are in accordance with the Bryan/College Station Standard Details.
Sincerely,
A ER.
00RE AND ASSOCIATES, INC.
K P. S ivan, P.E.
A sociate
Walter P. Moore and Associates, Inc.
TBPE Firm Reoistitlon No.1856
P:\23\2005\05040-13\Correspondence\Letters\Letter Acknowledging City Standards.docx
1301 MCKINNEY, SUITE 1100
HOUSTON, TEXAS 77010
PHONE:713.630.7300 FAX:713.630.7396
WWW.WALTERPMOORE.com