Loading...
HomeMy WebLinkAboutCorrespondenceE-mail Correspondence From: Kevin Sullivan Sent: Monday, December 27, 2010 5:09 PM To: 'Ihovde@csb(.gov'; 'Ebridges@cstx.gov' Cc: Lakshmi Palamadai; Heather Guillen Subject: Tower Point Lot 15 (AT&T) << File: 2010-12-27_Exhibit-Accessibility.pdf>> << File: 2010-12-24_Exhibit-Connectivity Masterplanl.pdf>> Lauren, See below for the 2 issues we discussed last week: 1. Sidewalk along Private Drive "G": Drive "G" is currently at a 6%slope in some areas. The sidewalk adjacent to the drive would need to be at 5% max to be accessible (see blue sidewalk attached for accessible route). As you can see, making this sidewalk accessible will require some switchback ramps and potentially some small walls. However, this sidewalk is not required to be accessible because there is an alternate accessible route to the public ROW (see red sidewalk attached for accessible route). Please let us know whether the sidewalk along Drive "G" should be accessible. 2. Access from Building to Drive "G": The difference in elevation from the building to Drive "G" is 11' to 17'. Therefore, it will be very difficult to obtain access from the building to the drive. We would be required to build switchback ramps with walls (see ramps in green attached). This switchback ramp and walls would be built over a PUE. Alternatively, see the attached map with connectivity routes in cyan. Please confirm the access from the Building to Drive "G" can be eliminated and that access will come elsewhere. Let me know should you have any questions or comments. Thanks, Kevin P. Sullivan, P.E., LEEDO AP Associate WALTER P MOORE From: Lauren Hovde To: Erika Bridges; Kevin Sullivan CC: 'Mike Coontz'; Heather Guillen; Lakshmi Palamadai; Ray; Stuart Allison Date: 1/4/2011 12:05 PM Subject: RE: Tower Point Lot 15 (AT&T) Kevin, Thanks for the time to consider this issue. A sidewalk will be required to extend up the length of the driveway that comes off of Private Drive G. No switchback sidewalk will be necessary. Lauren Lauren Amelia Hovde '06 From: Kevin Sullivan <KSullivan@walterpmoore.com> To: Lauren Hovde <Lhovde@cstx.gov>, "Ebridges@cstx.gov" <Ebridges@cstx.gov> CC: Ray <rayd@cdaarchitects.com>, Stuart Allison <stuarta@cdaarchitects.com>... Date: 1/4/2011 12:30 PM Subject: RE: Tower Point Lot 15 (AT&T) Attachments: 2011-01-04_Exhibit - Accessibility.pdf Lauren, We will need to widen the drive to allow for the sidewalk. I have attached another sketch that shows how we propose to do this. Please let me know should you have any comments. We will proceed. Thanks,Kevin P. Sullivan, P.E., LEEDOAP From: Lauren Hovde To: Erika Bridges; Kevin Sullivan CC: Steve Smith Date: 1202011 11:14 AM Subject: Re: Tower Point Lot 28 Kevin, I still don't think that an aerial truck is going to be able to make the turn into the two fire lane driveways. Can you send me an exhibit of how you've made it work? Thanks! Lauren From: Kevin Sullivan <KSullivan@walterpmoore.com> To: Lauren Hovde <Lhovde@cstx.gov>, Erika Bridges <Ebridges@cstx.gov> CC: Heather Guillen <hguillen@walterpmoore.com>, Mike Coontz <mcoontz@weiner... Date: 1202011 11:02 AM Subject: Lot 15 Site Plan Attachments: 5040-13-C200-LA Layoutl (1).pdf Lauren/Erika, Here is the site plan for Lot 15. As discussed we are providing access to Drive G via the stairs. Let me know should you have any questions or comments. We'll be submitting our drawings shortly for review. Thanks, Kevin P. Sullivan, P.E., LEEDO AP Associate WALTER P MOORE 5040-13-C200-LA Layoutl (1).pdf WALTER P MOORE April 6, 2011 Ms. Erika Bridges Graduate Engineer CITY OF COLLEGE STATION P.O. Box 9960 College Station, Texas 77842 RE: Fire Flow Demands Tower Point Infrastructure Lot 15, Block 3 WPM Project No. 23-05040-13 Dear Ms. Bridges: The fire flow requirement for a 3887 SF, type IIB building construction classification,1s 1,500 gallons per minute based on the 2009 International Fire Code. A fire hydrant is proposed along the approved fire lane within 300 feet from the proposed building. Sincerely, WA ER P. MO RE AND ASSOCIATES, INC. Kev n P. Sul P.E. Associate Walter TOPE Firm Rellikh Lion No. IV! P:\23\2005\05040-13\Correspondence\Letters\04-06-2011 Fire Flow Reqts Letter.doex 1301 MCKINNEY, SUITE lion HOUSTON, TEXAS 77010 PHONE: 713.630.7300 FAX:713.630.7396 www.WALTERPMOORE.com WALTER P MOORE January 26, 2010 Ms. Erika Bridges Graduate Engineer CITY OF COLLEGE STATION P.O. Box 9960 College Station, Texas 77842 RE: Tower Point Infrastructure, College Station, Texas Lot 15, Block 3 Letter Acknowledging City Standards Dear Ms. Bridges: The purpose of this letter is to acknowledge that the construction plans for the public infrastructure for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. Any alternate design or construction methodology that was used is listed below: (N/A) I also acknowledge, to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. Sincerely, A ER. 00RE AND ASSOCIATES, INC. K P. S ivan, P.E. A sociate Walter P. Moore and Associates, Inc. TBPE Firm Reoistitlon No.1856 P:\23\2005\05040-13\Correspondence\Letters\Letter Acknowledging City Standards.docx 1301 MCKINNEY, SUITE 1100 HOUSTON, TEXAS 77010 PHONE:713.630.7300 FAX:713.630.7396 WWW.WALTERPMOORE.com