HomeMy WebLinkAboutLetter of Completionp--\-1s
LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
DATE: �� I
RE: COMPLETION OF WATER
THOMAS PARK LOFTS
Dear Sir:
The purpose of our letter is to request that the following listed Improvements be
approved and accepted as being constructed under City Inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas, This approval and acceptance by the City is requested in .order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the Improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by
and by their subcontractors as Indicated by signatures below.
WORK COMPLETED
Water 12 _ 1-3
Owner: CC BCS 1 LP
Phone Number: 979.260.7000
Address: 1700 RESEARCH PARKWAY
SUITE 246
COLLEGE ST TION, TEXAS 7845
Signature:
ACCEPTANCE & APPROVAL
City Representative
Revised 1131107
WARRANTY DATE
- z5' ' 15-
L&S CONTRACTING, INC
Contractor:
Phone Number:979.690.9232
Address; PO BOX 9100
COLLEGE STATION, TEXAS 77842
Iq
yet>PLAT FILED
AR OFFSITE ESMTS FILED
�Wd—TEMP 13LANKET ESMT FILED'
NO OTHER ESMTS NEEDED
0- ris
LETTER OF COMPLETION
CITY ENGINEER DATE: I11 Iy
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS SIDEWALKS
RE: COMPLETION OF
THOMAS PARK LOFTS
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by C L (I &5j L
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WARRANTY DATE
SIDEWALK V I21 I l
6V,4-j �j V
CC BCS 1 LP
Owner:
Phone Number: 979.260.7000
Address: 1700 RESEARCH PARKWAY
SUITE 246
Contractor: D&S CONTRACTING, ING
979.690.9232
Phone Number:
Address: PO BOX 9100
COLLEGE STATION, TEXAS 77842
COLLEGE STATION, TEXAS 7784
Signature: Signature
ACCEPTANCE & APPROVAL
dko -Z7 -14
City Representative
ify Engineer
Revised 1131107
Aid —PLAT FILED
WAA OFFSITE BOUTS FILED
ja&TEUP BLANKET ESMT FILED
-40..NO OTHER ESMTS NEEDED
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No.12327
Public Water, Sanitary Sewer, and Sidewalk Improvements
Foster Avenue Apartments
Engineer's Estimate or Conduction
Item
Description
Unit
I
Es
Q timated
uantit
unit Price
Total
General Items
1
Mobilization and Staking
LS
1
$ 1,000.00
$ 1,000.00
2
Erosion and Sediment Control
LS
1
$ 500.00
$ 500.00
General Items Subtotall
$ 1,500.00
Sidewalk Construction Items
3
Site and Subgrade Preparation
LS
1
$ 1,500.00
$ 1,500.00
4
Concrete Sidewalk - 4" thick
SF
2,470
$ 3.80
$ 9,386.00
5
Concrete Sidewalk & Laydown Curb- Fire Lane Rated
SF
300
$ 4.80
$ 1,440.00
6
ADA Ramps - Detectable Warning Surfaces
EA
4
$ 600.00
$ 2,400.00
7
Junction Box, complete in place
EA
1
$ 3,000.00
$ 3,000.00
Sidewalk Construction Items Subtotal
$ 17,726.00
Water Construction Items
8
6' C900 Water Pipe - Structural Backfill
LF
10
$ 50.00
$ 500.00
9
Fire Hydrant Assembly (w/ vert. extension)
EA
1
$ 3,500.00
$ 3,500.00
10
8" x 6" Tapping Sleeve and Valve
EA
1
$ 3,500.00
$ 3,500.00
11
6" M.J. Gate Valve
EA
I
$ 950.00
$ 950.00
12
6" M,J. Tee
EA
1
$ 500.00
$ 500.00
13
6" M.J. 45 Deg. Bends
EA
2
$ 500.00
$ 1,000.00
14
6"x2" Tapped Tee w/Cap
EA
1
$ 350.00
$ 350.00
15
Waterline Testing
LS
1
$ 500.00
$ 500.00
Water Construction Items Subtotal
$ 10,800,00
Sanitary Sewer Construction Items
16
Tie-in to Existing Manhole w/outside drop
EA
1
$ 1,750.00
$ 1,750.00
17
6" PVC Pipe
LF
30
$ 30.00
$ 900.00
18
Clermont
EA
1
$ 200.00
$ 200.00
19
Remove Pavement
SF
120
$ 8.00
$ 960.00
20
Replace Pavement
SF
120
$ 20.00
$ 2,400.00
21
Sewer Line Testing
LS
1
$ 350.00
$ 350.00
Sanitary Sewer Construction Items Subtotal
$ 6,560.00
General Items Subtotal
$ 1,500.00
Sidewalk Construction Items Subtotal
$ 17,726.00
Water Construction Items Subtotal
$ 10,800.00
Sanitary Sewer Construction Items Subtotal
$ 6,560.00
ESTIMATED TOTAL CONSTRUCTIONJ
1 $ 36,586.00
4-/2
SCHULTZ ENGINEERING, LLC.