MEMORANDUM
January 26, 2011
TO: Chuck Ellison via email chuck@ellisonlaw.com
FROM: Molly Hitchcock, AICP
Planning Administrator
SUBJECT: TOWER POINT PH 12, L 1-3, BLK 2 (FP)
I reviewed the above -mentioned FINAL PLAT - RESIDENTIAL application turned in for today's
deadline and determined it to be incomplete. The following is the preliminary list of items
needed to complete the submittal so that staff may conduct a thorough review. Please submit
the following information by 10 a.m. on any Monday for review that week:
The engineer's dated signatures on the development permit portion of the plat
application.
The Development Permit Application/Public Infrastructure Review and Inspection
Fee. A development permit for this project was submitted in November 2010, but
without the final plat application, the submittal expired over two weeks ago. We still
have the information that was provided and will transfer it to this application if that is your
wish; otherwise, the engineering documents are also needed.
Please be aware that if this application is not completed before March 14, 2011, it will expire
and a new application and fees will be necessary to continue the platting process.
If you have any questions or need additional information, please call me at 979.764.3570.
cc: Andy Weiner via email andyweiner(o),weinerdevelopment.com
Kling Engineering & Surveying via email stewart@klingeng.com
Case file No. 11-00500010 1
TO:
FROM:
SUBJECT:
(*hK'W'"
CITY OF COLLEGE STATION
Nome ofTexmAdM University*
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
January 28, 2011
11�
Chuck Ellison, via email: chuckCo ellisonlaw.com
Molly Hitchcock, AICP
Planning Administrator
TOWER POINT PH 12, L 1-3, BLK 2 (FP)
Thank you for the engineer -signed portion of the application. As requested, I have transferred
the engineering documents that were previously submitted into this file, but the previous
application had expired; therefore, the following is still required by 10 a.m. on any Monday for
the project to be reviewed that week:
The Development Permit Application/Public Infrastructure Review and Inspection
Fee.
Please be aware that if this application is not completed before March 14, 2011, it will expire
and a new application and fees will be necessary to continue the platting process.
If you have any questions or need additional information, please call me at 979.764.3570.
cc: College Station Marketplace, via email: and weiner weinerdevelo me t/com✓/
. Kling Engineering and Surveying, via email: stewart klin en .co
Case file No. 11-00500010
(*Ort
CITY OF COLLEGE STATION
Home of Texas AcW University'
1101 Texas Avenue, P.O. Box 996.0
College Station, Texas 77842
Phone 979.764,35701 Fax 979.764.3496
MEMORANDUM
January 31, 2011
TO: College Station Marketplace, via email: andyweiner(d2weinerdevelooment.comv/
FROM: Molly Hitchcock, AICP Cc,
Planning Administrator
SUBJECT: TOWER POINT PH 12, L 1-3, BLK 2 (FP)
Thank you for the fees submittal for your FINAL PLAT application. This project will be
distributed to staff this week for their review.
cc: Chuck Ellison, via fax: 979.693.8819
Kling Engineering, via fax: 979.846.8252
Case file no. 11-00500010
Planning & Development Services
1101 Texas Avenue, P.O. Box 9960
_ College Station, Texas 77842 nn
CiTrorCora.isctsSxnru�n Phone 979.764.3570 / Fax 979.764.3496 O� LG
Home -FT"AdM tbileersl '
ry MEMORANDUM
February 7, 2011
TO: College Station Marketplace, via email: andvweiner(a)vdeinerdevelopment.com
FROM: Lauren A. Hovde, Staff Planner
SUBJECT: TOWER POINT PH 12 - Final Plat
Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, February 14, 2011, 10:00 a.m.,
your project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, March 3, 2011, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas
Avenue.
One (1) 24"x36" copy of the revised final plat;
Thirteen (13) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat (required after P&Z approval); and
One (1) copy of the digital file of the final plat on diskette or e-mail to:
P&DS_Digital_Submittal@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed your project will not be
scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at
the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments
cc: Chuck Ellison, via fax: 979.693.8819 V /
Kling Engineering, via fax: 979.846.8252✓
Case file #11-00500010
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 1 of 6
STAFF REVIEW COMMENTS NO. 1
Project: TOWER POINT PH 12 (FP) 11-00500010
PLANNING
1. Please clarify why the block decreased in size.
2. In this situation, the private access easement must be shown to verify where access will be
taken from the public right-of-way.
3. The title report shows several easements, including a blanket easement, that are not
displayed on the plat. Please show these easements, add a note, or clarify if the easement
not valid.
4. Note 8 appears to be missing the word "easement' after the phrase 'variable width".
5. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
6. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Lauren A. Hovde, Staff Planner Date: February 7, 2011
TxDOT Comments
1. Future drives to serve these lots should be planned to access Arrington Road and
include sufficient throat length from the SH 6 frontage road. Frontage length along SH 6
is not sufficient to permit an access drive.
Reviewed by: Chad Bohne Date: February 3, 2011
GREENWAYS
1. No comments
Reviewed by: Venessa Garza, Greenways Program Manager
Date: February 4, 2011
ENGINEERING COMMENTS NO. 1
Final Plat
1. Was the TxDOT Drainage Easement released?
2. As per our discussion, the 100-yr floodplain line per the WP Moore pending LOMR may
be the only floodplain line shown. We will need correspondence from FEMA indicating
that WP Moore can proceed with notifications to neighboring residents.
3. A 20-ft rear lot PUE is required for all lots adjacent to unplatted property.
4. Is the 20-ft PUE along the outer southwest perimeter of the property proposed?
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 2 of 5
5. Please verify if the following easements are located on the property:
• 10-ft PUE (Vol.723, P.889)
• 15-ft PUE (Vol.589, P.223)
6. Please show the 40-ftAccess Easement between the lots, as shown in the construction
plans. As proposed, Lot 2 currently does not have access to a public street.
7. Please coordinate with WP Moore for current easement locations and widths, as
necessary for the water and sanitary sewer infrastructure.
Construction Plans & Documents
1. C1.0 - Please revise the Title to indicate that these are the infrastructure plans for all
lots in Phase 12.
2. C1.0 - It looks like the Index should also list C3.0 & C6.2. Also, C3.1 was listed on the
Index and not included in the plan set.
3. C2.0 - You may want to add another note stating that the contractor must provide digital
construction pictures in accordance with Spec 01 30 00.
4. C4.0 - Please show the spoils from construction and associated erosion control.
5. C4.0 - Please include additional erosion control measures downstream between the
creek and construction activities.
6. C5.1 - A drop connection is required at MH Ex-1.
7. C5.1 - Please add a note specifying that a dry mechanical bore is required in
accordance with Spec 31 78 00.
8. C5.1 - The steel encasement pipe must have a nominal diameter of 16-inches.
9. C5.1 - Please make the existing 12-inch waterline pipe more visible.
10. C5.1 - Please label the flowline of the waterlines at crossings.
11. C5.1 - Provide a 0.1-ft drop across the inverts.
12. C5.1 - Please label flowlines at least every 100-ft.
13. C5.1 -Where the sanitary sewer is 6-14' deep, a minimum 20-ft PUE will be required.
14. C5.1 - Please label the PUE for the sanitary sewer extension to Lots 1 & 2.
15. C5.1 - The stubbed out and plugged sanitary sewer line needs to be one full joint with a
cleanout.
16. C5.2 - A TS&V may be used for the connection to the existing 12-inch waterline.
17. C5.2 - Please provide 3 valves at the cross and 2 valves at any tee.
18, C5.2 - Each lot is required to meet the commercial fire flow requirement of 2500 gpm
which can be split between 2 fire hydrants. If a development that requires a fire line
wants to build on Lot 2, there would not be a hydrant within 150-ft of the FDC.
19. C5.2 - Please specify how services should be plugged for future use.
20. C5.2 - Please label all locations where bends or deflections are proposed.
21. Water/Wastewater Reports - Please update the Title and Page 2 to reflect that this
infrastructure is for Lots 1-3, Phase 12 rather Lot 3, Phase 12A.
22. WaterNVastewater Reports - The acreage in the reports should be the same acreage as
the plat (5.44 Ac.). Please revise.
23. Water/Wastewater Reports - Under the Proposed Site Conditions and Analysis sections
of the reports, part of the land use should be Restaurant use rather than just
"commercial retail shops."
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 3 of 5
24. Water Report — The Waterline Analysis references 4 proposed hydrants within 600 feet
of each other. Please provide an exhibit of these hydrants and label distances between
the lots and hydrants.
25. Water Report — Please include the KY -Pipe data (or other Hardy -Cross software used) in
the appendix to support the pressure and velocities in the Proposed Analysis. .This
should include Normal and Fire Flow Analysis for the proposed system.
26. Wastewater Report — Please update Exhibit 1 to reflect the plans.
27. Wastewater Report — Is 16.96cfs total capacity of the 27" pipe or estimated current
flows?
28. Cost Estimate — The cost estimate needs to be updated to include all 8" sanitary sewer
line, additional manholes, and fire hydrants (if necessary).
29. Please provide an NOI.
30. Will there be public storm sewer extended to serve these lots? If so, please submit a
drainage report and drawings.
31. Please provide a traffic control plan if any portion of Arrington will need to be closed
during construction (i.e. when boring under Arrington).
32. FYI... For the as -built drawings, the contractor's certification is required on every sheet,
while the engineer's certification is only necessary on sheets with drainage
infrastructure. The engineer's as -built certification does not need to be included on
C1.0.
33. FYI ... The cost estimate, water report, and sanitary sewer report need to be sealed by an
Engineer prior to plan approval.
34. FYI... Additional Development Permit Fee may be required for a total fee of 1% of public
infrastructure costs.
Reviewed by: Erika Bridges
Date: 2/4/11
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes and provides
descriptive easements for electric infrastructure as designed by CSU for electric lines
(including street lights where applicable).
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
3. The following easements will be required:
➢ Temporary blanket easement for construction purposes.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 4 of 5
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull
boxes and secondary pedestals provided by CSU).
8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to:
g m a rt i n ez(a) c s t x. g ov.
9. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
10. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
11. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: 02.04.2011
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: February 3, 2011
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 5 of 5
Planning & Development Services A 111
1101 Texas Avenue, P.O. Box 9960 Cc
College Station, Texas 77842
ClrrorCor.i.iscL,Srnrion Phone 979.764.3570 / Fax 979.764.3496
How ofT"&A&M Univenil'
MEMORANDUM
February 17, 2011
TO: College Station Marketplace, via email: andyweiner(a)-weinerdevelopment.comJ
FROM: Lauren A. Hovde, Staff Planner
SUBJECT: TOWER POINT PH 12 - Final Plat Comments #2
Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, February 28, 2011, 10:00 a.m.,
your project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, March 17, 2011, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas
Avenue.
One (1) 24"x36" copy of the revised final plat;
Thirteen (13) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat (required after P&Z approval); and
One (1) copy of the digital file of the final plat on diskette or e-mail to:
P&DS_Digital_Submittal@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed your project will not be
scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at
the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments /
cc: Chuck Ellison, via fax: 979.693.8819_
Kling Engineering, via fax: 979.846.8252 .
Case file #11-00500010
ENGINEERING COMMENTS NO. 2
1. Please keep the current FEMA Firm Panel noted on the plat.
2. We would prefer that the 20-ft rear lot PUE at least be split with 10-ft on each side of the
property line, if possible. FYI... Please note that all offsite easements, including this one, will
need to be filed prior to the final plat being forwarded to P&Z or a variance will need to be
requested.
3. FYI... Please note that public infrastructure to support this plat must be built or guaranteed
prior to the final plat being forwarded to P&Z.
Reviewed by: Erika Bridges Date: 2/16/11
Planning & Development Services
1101 Texas Avenue, P.O. Box 9960
_ College Station, Texas 77842
CTTS'OP Ccxr.r:ci: Srnru)n Phone 979.764.3570 / Fax 979.764.3496
Home ofTexasAe'iM Universit '
I MEMORANDUM
March 25, 2011
TO: College Station Marketplace, via email: andyweiner(a)weinerdevelopment.com
FROM: Erika Bridges
SUBJECT: TOWER POINT PH 12 — Engineering Comments
ENGINEERING COMMENTS NO. 2 — Construction Plans & Documents
1. (Repeat) C5.1 — Please label the flowline of the waterlines at crossings. Please label the
12" waterline's flowline.
2. (Repeat) C5.1 — Please label flowlines at least every 100-ft. FL 256.55 at Sta.11+00 needs
to be revised.
3. (Repeat) C5.2 — Please label all locations where bends or deflections are proposed. Per
Table III, the maximum deflection for 6" waterline is 5.2°.
4. (Repeat) Water/Wastewater Reports — Under the Proposed Site Conditions and Analysis
sections of the reports, part of the land use should be Restaurant use rather than just
"commercial retail shops." The analysis needs to reflect restaurant and commercial
uses as well.
5. (Repeat) Water Report — Please include the KY -Pipe data (or other Hardy -Cross software
used) in the appendix to support the pressure and velocities in the Proposed Analysis. This
should include Normal and Fire Flow Analysis for the proposed system.
6. (Repeat) Cost Estimate — the cost estimate needs to be updated to include all 8" sanitary
sewer line, additional manholes, and fire hydrants (if necessary). Does this include the
cost to dry bore? It is my understanding that this is a significant construction
expense.
7. (Repeat) Please provide an NO].
8. C5.1-5.4 — Please note or label water/sanitary sewer crossings with TCEQ requirements (i.e.
center one full joint of pipe, etc.).
Reviewed by: Erika Bridges Date: 3/25/11
y t Rf F
F ss
Chuck Ellison, via fax: _R_n� r k� %
Kling Engineering, via fax: e z
Case file #11-00500010...f r
(*Wrq"
CITY OF COLLEGE STATION
Planning & Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
November 22, 2011
TO: Heather Guillen, via email: hquillen(Lbwalterpmoore.com tJ
FROM: Erika Briges
SUBJECT: Engineering Document Comments for Tower Point Ph 12 L1-3 BIk2
Staff reviewed the above -mentioned engineering documents as requested. The following page
is a list of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information by Monday, DATE, at 10:00 a.m. for further staff
review and approval of the plans:
One (1) set of revised construction documents.
Please note that the Development Permit Balance (Public Infrastructure Review and Inspection
Fee), will be calculated and requested once the construction documents and engineer's
estimates have been reviewed and approved.
If you have any questions or need additional information, please call Erika Bridges at
979.764.3570.
Attachments: Staff review comments
PC: Mike Coontz, via email: mcoontzCo).weinerdevelopment.com V/
Case File No. 11-500010
ENGINEERING COMMENTS NO. 4
1. Please verify that all previously approved sheets did not change. FYI... Full sets will be
required for stamping.
2. Please verify that lot grading is not being proposed with this project.
3. FYI ... All required easements need to be dedicated via plat or separate instrument prior to
issuance of CO.
4. C4.0 — Please verify that additional silt fence is not needed along the south side of
Arrington.
5. C5.1 — Show and label the external drop structure and flowline.
6. C5.1 — Please label the match line station and flowline.
7. C5.3 — Please provide at least 9-ft horizontal separation distance between the waterline and
sanitary sewer manhole.
8. C5.4 — Why is there a 12x8 TS&V proposed at Sta.10+00?
9. C5.4 — Shouldn't the steel encasement stop between the back of curb and the cross?
10. C5.4 — Label the 12x8 cross in plan view.
11. C5.4 — At Sta.12+63, the waterlines connecting at the cross needs to be shifted such that
they connect at 90-degree angles.
12. C5.4 — Please provide a valve at each end of the steel encasement.
13. C5.4 — Please verify that all lots will have adequate fire flow for commercial properties (2500
gpm split between 2 fire hydrants within 600-ft of each other).
Reviewed by: Erika Bridges Date: 11/21/11
WALTER P MOORE
April 29, 2011
Erika Bridges
City of College Station
Department of Publics Works
1101 Texas Avenue
College Station, TX 77842
Re: Project: Tower Point Phase 12 - Response to City comments
WPM Project: 23.05040.12
Dear Erika:
The following are the responses to the Planning, Engineering, and Sanitation review comments we
received on March 25, 2011 from the City of College Station for the above referenced project. The
responses for each item are in red italics and are below each comment that we received.
7(RINEERING COMMENTS NO. 2 - Construction Plans & Documents
epeat) C5.1 - Please label the flowline of the waterlines at crossings. Please label the 12"
waterline's flowline. Done.
V(Repeat) C5.1 - Please label flowlines at least every 100-ft. FL 256.55 at Sta.11+00 needs
Yto a revised. Done.
Repeat) C5.2 - Please label all locations where bends or deflections are proposed. Per
Table III, the maximum deflection for 6" waterline is 5.2D. Revised.
(4)(Repeat) Water/Wastewater Reports - Under the Proposed Site Conditions and Analysis
sections of the reports, part of the land use should be Restaurant use rather than just
"commercial retail shops." The analysis needs to reflect restaurant and commercial uses as
well. Done. aSfiV\ � Vo \pt&V\ fftjSeoi `h Yo jrb r'�• IC.�tNttM,.
G(Repeat) Water Report - Please include the KY -Pipe data (or other Hardy -Cross software
used) in the appendix to support the pressure and velocities in the Proposed Analysis. This
should include Normal and Eire Flow Analysis for the proposed system. Done.
-�Pft -v
at=
1301 MCKINNEV, SUITE 11DO
HOUSTON, TEXAS 77010
PHONE: 713.630.7300 FAX! 713,630.7396
ir ID
5-a-ll
I? = �
www.WALTERPMOORE.coN
Erika Bridges
Tower Point Lot 15
Page 2 of 2
Repeat) Cost Estimate — The cost estimate needs to be updated to include all 8" sanitary
ewer line, additional manholes, and fire hydrants (if necessary). Does this include the cost to
dry b re? It is my understanding that this is a significant construction expense. Done.
YRe eat Please provide an NOI. Done.
V�C5.1-5.4 — Please note or label water/sanitary sewer crossings with TCEQ requirements (i.e.
center one full joint of pipe, etc.). Done. Added callouts to reference Note fVC2.0.
Sincerely,
WALTER P. MOORE AND ASSOCIATES, INC.
Heather Guillen
Associate
Enclosures:
STAFF REVIEW COMMENTS NO.1
Project: TOWER POINT PH 12 (FP) - 11-00500010
PLANNING
1. Please clarify why the block decreased in size.
Block decreased in size so that no portion of the block would lie in the 100 year floodplain as
defined in the Walter P. Moore FEMA submittal - see southeast block line.
2. In this situation, the private access easement must be shown to verify where access will be
taken from the public right-of-way.
40' Private Access Easement has been shown along common line between Lots 1 and 3.
3. The title report shows several easements, including a blanket easement, that are not
displayed on the plat. Please show these easements, add a note, or clarify if the easement
not valid.
•Citgo Pipeline easement, Vol. 3440, Pg, 40. This pipeline lies 8780' southwest of the
subject tract, is not applicable to the subject tract, and is not shown hereon.
•Wellborn Water Corp. easement, Vol. 531, Pg. 722. This easement is not applicable to the
subject tract and is not shown hereon.
*College Station Utility Easement, Vol. 589, Pg. 218. This easement lies along the northeast
block line, is applicable to. the subject tract and is shown hereon.
.College Station Electrical Easement, Vol. 723, Pg. 689. This easement Iles along the
northeast block line, is applicable to the subject tract and is shown hereon.
•TXU Gas Easement, Vol, 4137, Pg. 37. This easement adjoins South Park Addition and is
not applicable to the subject tract and is shown not hereon.
*College Station Sanitary Sewer Easement, Vol. 4328, Pg. 164. This easement lies along
the northeast block line, is applicable to the subject tract and is shown hereon.
•College Station Public Utility and Access Easement, Vol. 5247, Pg. 82. This easement lies
within Arrington Road Right-of-way - 80' per Volume 7800, Page 12. This easement is not
applicable to the subject tract and is not shown hereon.
•Designation of Property Participating in Regional Storm Water Detention Pond, Vol. 7157,
Pg. 124. This instrument is not applicable to the subject tract and is not shown hereon.
•College Station Public Utility Easement, Vol. 8002, Pg. 249. This easement lies along the
northwest block line, is applicable to the subject tract and is shown hereon.
*College Station Public Utility Easement, Vol. 8002, Pg. 289. This easement is not
applicable to the subject tract and lies along the east right-of-way line of Arrington Road and
terminates at the southwest line of Lot 3 - 2.01 acres. This easement is shown hereon.
4. Note 8 appears to be missing the word "easement" after the phrase "variable width".
Acknowledged and corrected.
5. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
6. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Lauren A. Hovde, Staff Planner Date: February 7, 2011
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained In your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review, 2 of 6
TxDOT Comments
Future drives to serve these lots should be planned to access Arrington Road and
include sufficient throat length from the SH 6 frontage road. Frontage length along SH
is not sufficient to permit an access drive.
Reviewed by: Chad Bohne
GREENWAYS
Date: February 3, 2011
1. No comments
Reviewed by: Venessa Garza, Greenways Program Manager
Date: February 4, 2011
ENGINEERING COMMENTS NO. 1
Final Plat
1. Was the TxDOT Drainage Easement released?
The channel easement has been submitted to TxDOT for release and is currently being
processed by TxDOT.
2. As per our discussion, the 100-yr floodplain line per the WP Moore pending LOUR may
be the only floodplaln line shown. We will need correspondence from FEMA indicating
that WP Moore can proceed with notifications to neighboring residents.
Walter P. Moore will provide the requested correspondence.
3. A 20-ft rear lot PUE is required for all lots adjacent to unplatted property.
The required 20' PUE will be provided by Separate Instrument on the "outside"
(southeast) of the block line and In the Detention Area.
4. Is the 20-ft PUE along the outer southwest perimeter of the property proposed?
The required ,20' PUE will be provided by Separate Instrument on the "outside"
(southeast) of the block line and in the Detention Area.
5. Please verify if the following easements are located on the property:
• 10-ft PUE (Vol.723, P.889) —Located along northeast block line.
41 15-ft PUE (Vol.589, P.223) — I have never seen on this project, however, Vol. 589,
Pg. 218 - lies along the northeast block line.
6. Please show the 40-ft Access Easement between the lots, as shown in the construction
plans. As proposed, Lot 2 currently does not have access to a public street.
Provided.
7. Please coordinate with WP Moore for current easement locations and widths, as
necessary for the water and sanitary sewer infrastructure.
Coordination has been provided.
Construction Plans & Documents
1. C1.0 — Please revise the Title to indicate that these are the infrastructure plans for all
lots in Phase 12. DONE.
2. C1.0 — It looks like the Index should also list C3.0 & C6.2. Also, C3.1 was listed on the
Index and not included in the plan set. DONE.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained In your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 3 of 5
ADDED
EROSION
CONTROL
NOTE #6
2ESPONSE:
'AN
.00ATED
(VITHIN 20'
DUE WHEN
;OMBINED
KITH PUE
ALONG
\CCESS R
ZESPONSE:
.ABELED AS
'0' PUBLIC
ACCESS
:ASEMENT
AND PUBLIC
)TILITY
:ASEMENT
3. C2.0 - You may want to add another note stating that the contractor must provide digital
construction pictures in accordance with Spec 0130 00. JADDED NOTE #31
:�i. C4.0 - Please show the spoils from construction and associated erosion control.
5. C4.0 - Please include additional erosion control measures downstream between the
creek and construction activities. DONE
6. C5.1 -Adrop connection is required at MH Ex-1. INEW SAN DROP MH ADDED
7. C5.1 - Please add a note specifying that a dry mechanical bore is required in
accordance with Spec 31 78 00. JADDED HEXAGON NOTE #2
8. C5.1 -The steel encasement pipe must have a nominal diameter of 16-inches. UPDATED
9. C5.1 - Please make the existing 12-inch waterline pipe more visible. DONE
10. C5.1 - Please label the flowline of the waterlines at crossings, DONE
11. C5.1 - Provide a 0.1-ft drop across the inverts. Wa.
12. C5.1 - Please label flowlines at least every 10�13. C5.1 -Where the sanitary sewer is 6'-14'deep, minimum t PUE will be required.
14 C5.1 - Please label the PUE for the sanitary sewer extension to Lots 1 & 2.
1 . C5.1 - The stubbed out and plugged sanitary sewer line needs to be one full joint with a
cIeanout. DONE
6. C5.2 - A TS&V may be used for the connection to the existing 12-inch waterline. OK
17. C5.2 - Please provide 3 valves at the cross and 2 valves at any tee. DONE
18. C5.2 - Each lot is required to meet the commercial fire flow requirement of 2500 gpm
which can be split between 2 fire hydrants. If a development that requires a fire line
wants to build on Lot 2, there would not be a hydrant within 150-ft of the FDC. ADDED FH
19. C5.2 - Please specify how services should be plugged for future use. DONE
20. C5.2 - Please label all locations where bends or deflections are proposed. DONE
21. WaterMastewater Reports - Please update the Title and Page 2 to reflect a this
infrastructure is for Lots 1-3, Phase 12 rather Lot 3, Phase 12A. DONE
22. WaterMastewater Reports - The acreage in the reports should be the same acreage as
the plat (5.44 Ac.). Please revise. ACREAGE UPDATED
23. WaterMastewater Reports - Under the Proposed. Site Conditions and Analysis sections
of the reports, part of the land use should be Restaurant use rather than just
"commercial retail shops." ADDED "RESTAURANT"
24, Water Report - The Waterline Analysis references 4 proposed hydrants within 600 feet
of each other. Please provide an exhibit of these hydrants and label distances between
the lots and hydrants, IREVISED TO REFERENCE 1 EXIST. FH AND 1 PROPOSED FH
25. Water Report - Please include the KY -Pipe data (or other Hardy -Cross software used) in
the appendix to support the pressure and velocities in the Proposed Analysis. This
should include Normal and Fire Flow Analysis for the proposed system.
26. Wastewater Report - Please update Exhibit 1 to reflect the plans. DONE
27. Wastewater Report - Is 16.96cfs total capacity of the 27" pipe or estimated current
flows? TOTAL CAPACITY OF THE 27" PIPE
28. Cost Estimate - The cost estimate needs to be updated to include all 8" sanitary sewer
line, additional manholes, and fire hydrants (If necessary), DONE
29, Please provide an NOI.
30. Will there be public storm sewer extended to serve these lots? If so, please submit a
drainage report and drawings. STM SWR WILL BE PROVIDED WITH
ACCESS ROAD AT A LATER DATE
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additlonal changes on these plans
that have not been pointed out to the Clty, wlll constitute a completely new revlew, 4 of 5
31. Please provide a traffic control plan if any portion of Arrington will need to be closed
during construction (i.e. when boring under Arrington). NOT REQUIRED FOR BORE
32. FYI... For the as -built drawings, the contractor's certification is required on every sheet,
while the engineer's certification is only necessary on sheets with drainage
infrastructure. The engineer's as -built certification does not need to be included on
C1.0. DONE
33. FYI ... The cost estimate, water report, and sanitary sewer report need to be sealed by an
Engineer prior to plan approval. DONE
34. FYI... Additional Develo ment Permit Fee may be required for a total fee of 1 % of public
infrastructure costs. LEASE LET US KNOW THE ADDITIONAL FEE
Reviewed by: Erika Bridges Date: 2/4/11
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes and provides
descriptive easements for electric infrastructure as designed by CSU for electric lines
(including street lights where applicable).
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
3. The following easements will be required:
➢ Temporary blanket easement for construction purposes. COORDINATED
GENERAL ELECTRICAL COMMENTS WITH GILBERT
1. Developer Installs conduit per CSU specs and design. MARTINEZ
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull
boxes and secondary pedestals provided by CSU).
8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to:
amartinez aOcstx.00v.
9. Developer provides load data to CSU as soon as It is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
10. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
11. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764,6255.
Reviewed by: Gilbert Martinez Date: 02.04.2011
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutla Date: February 3, 2011
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained In your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 5 of 5
STAFF REVIEW COMMENTS NO. 1
Project: TOWER POINT PH 12 (FP) - 11-00500010
PLANNING
1. Please clarify why the block decreased in size.
Block decreased in size so that no portion of the block would lie in the 100 year floodplain as
defined in the Walter P. Moore FEMA submittal — see southeast block line.
2. In this situation, the private access easement must be shown to verify where access will be
taken from the public right-of-way.
40' Private Access Easement has been shown along common line between Lots 1 and 3.
3. The title report shows several easements, including a blanket easement, that are not
displayed on the plat. Please show these easements, add a note, or clarify if the easement
not valid.
•Citgo Pipeline easement, Vol. 3440, Pg. 40. This pipeline lies 8780' southwest of the
subject tract, is not applicable to the subject tract, and is not shown hereon.
*Wellborn Water Corp. easement, Vol. 531, Pg. 722. This easement is not applicable to the
subject tract and is not shown hereon.
•College Station Utility Easement, Vol. 589, Pg. 218. This easement lies along the northeast
block line, is applicable to the subject tract and is shown hereon.
*College Station Electrical Easement, Vol. 723, Pg. 689. This easement lies along the
northeast block line, is applicable to the subject tract and is shown hereon.
•TXU Gas Easement, Vol. 4137, Pg. 37. This easement adjoins South Park Addition and is
not applicable to the subject tract and is shown not hereon.
*College Station Sanitary Sewer Easement, Vol. 4328, Pg. 164. This easement lies along
the northeast block line, is applicable to the subject tract and is shown hereon.
•College Station Public Utility and Access Easement, Vol. 5247, Pg. 82. This easement lies
within Arrington Road Right-of-way — 80' per Volume 7800, Page 12. This easement is not
applicable to the subject tract and is not shown hereon.
•Designation of Property Participating in Regional Storm Water Detention Pond, Vol. 7157,
Pg. 124. This instrument is not applicable to the subject tract and is not shown hereon.
*College Station Public Utility Easement, Vol. 8002, Pg. 249. This easement lies along the
northwest block line, is applicable to the subject tract and is shown hereon.
•College Station Public Utility Easement, Vol. 8002, Pg. 289. This easement is not
applicable to the subject tract and lies along the east right-of-way line of Arrington Road and
terminates at the southwest line of Lot 3 — 2.01 acres. This easement is shown hereon.
4. Note 8 appears to be missing the word "easement" after the phrase "variable width".
Acknowledged and corrected.
5. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
6. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Lauren A. Hovde, Staff Planner Date: February 7, 2011
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 2 of 5
TxDOT Comments
1. Future drives to serve these lots should be planned to access Arrington Road and
include sufficient throat length from the SH 6 frontage road. Frontage length along SH 6
is not sufficient to permit an access drive.
Reviewed by: Chad Bohne Date: February 3, 2011
GREENWAYS
1. No comments
Reviewed by: Venessa Garza, Greenways Program Manager
Date: February 4, 2011
ENGINEERING COMMENTS NO. 1
Final Plat
1. Was the TxDOT Drainage Easement released?
The channel easement has been submitted to TxDOT for release and is currently being
processed by TxDOT.
2. As per our discussion, the 100-yr floodplain line per the WP Moore pending LOMR may
be the only floodplain line shown. We will need correspondence from FEMA indicating
that WP Moore can proceed with notifications to neighboring residents.
Walter P. Moore will provide the requested correspondence.
3. A 20-ft rear lot PUE is required for all lots adjacent to unplatted property.
The required 20' PUE will be provided by Separate Instrument on the "outside"
(southeast) of the block line and in the Detention Area.
4. Is the 20-ft PUE along the outer southwest perimeter of the property proposed?
The required .20' PUE will be provided by Separate Instrument on the "outside'
(southeast) of the block line and in the Detention Area.
5. Please verify if the following easements are located on the property:
• 10-ft PUE (Vol.723, P.889) — Located along northeast block line.
• 15-ft PUE (Vol.589, P.223) — I have never seen on this project, however, Vol. 589,
Pq. 218 - lies along the northeast block line.
6. Please show the 40-ft Access Easement between the lots, as shown in the construction
plans. As proposed, Lot 2 currently does not have access to a public street.
Provided.
7. Please coordinate with WP Moore for current easement locations and widths, as
necessary for the water and sanitary sewer infrastructure.
Coordination has been provided.
Construction Plans & Documents
1. C1.0 — Please revise the Title to indicate that these are the infrastructure plans for all
lots in Phase 12.
2. C1.0 — It looks like the Index should also list C3.0 & C6.2. Also, C3.1 was listed on the
Index and not included in the plan set.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 3 of 5
3. C2.0 - You may want to add another note stating that the contractor must provide digital
construction pictures in accordance with Spec 01 30 00.
4. C4.0 - Please show the spoils from construction and associated erosion control.
5. C4.0 - Please include additional erosion control measures downstream between the
creek and construction activities.
6. C5.1 - A drop connection is required at MH Ex-1.
7. C5.1 - Please add a note specifying that a dry mechanical bore is required in
accordance with Spec 31 78 00.
8. C5.1 - The steel encasement pipe must have a nominal diameter of 16-inches.
9. C5.1 - Please make the existing 12-inch waterline pipe more visible.
10. C5.1 - Please label the flowline of the waterlines at crossings.
11. C5.1 - Provide a 0.1-ft drop across the inverts.
12. C5A - Please label flowlines at least every 100-ft.
13. C5.1 - Where the sanitary sewer is 6'-14' deep, a minimum 20-ft PUE will be required.
14. C5.1 - Please label the PUE for the sanitary sewer extension to Lots 1 & 2.
15. C5.1 - The stubbed out and plugged sanitary sewer line needs to be one full joint with a
cleanout.
16. C5.2 - A TS&V may be used for the connection to the existing 12-inch waterline.
17. C5.2 - Please provide 3 valves at the cross and 2 valves at any tee.
18. C5.2 - Each lot is required to meet the commercial fire flow requirement of 2500 gpm
which can be split between 2 fire hydrants. If a development that requires a fire line
wants to build on Lot 2, there would not be a hydrant within 150-ft of the FDC.
19. C5.2 - Please specify how services should be plugged for future use.
20. C5.2 - Please label all locations where bends or deflections are proposed.
21. Water/Wastewater Reports - Please update the Title and Page 2 to reflect that this
infrastructure is for Lots 1-3, Phase 12 rather Lot 3, Phase 12A.
22. Water/Wastewater Reports - The acreage in the reports should be the same acreage as
the plat (5.44 Ac.). Please revise.
23. Water/Wastewater Reports - Under the Proposed Site Conditions and Analysis sections
of the reports, part of the land use should be Restaurant use rather than just
"commercial retail shops."
24. Water Report - The Waterline Analysis references 4 proposed hydrants within 600 feet
of each other. Please provide an exhibit of these hydrants and label distances between
the lots and hydrants.
25. Water Report - Please include the KY -Pipe data (or other Hardy -Cross software used) in
the appendix to support the pressure and velocities in the Proposed Analysis. This
should include Normal and Fire Flow Analysis for the proposed system.
26. Wastewater Report - Please update Exhibit 1 to reflect the plans.
27. Wastewater Report - Is 16.96cfs total capacity of the 27" pipe or estimated current
flows?
28. Cost Estimate - The cost estimate needs to be updated to include all 8" sanitary sewer
line, additional manholes, and fire hydrants (if necessary).
29. Please provide an NOI.
30. Will there be public storm sewer extended to serve these lots? If so, please submit a
drainage report and drawings.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 4 of 5
31. Please provide a traffic control plan if any portion of Arrington will need to be closed
during construction (i.e. when boring under Arrington).
32. FYI... For the as -built drawings, the contractor's certification is required on every sheet,
while the engineer's certification is only necessary on sheets with drainage
infrastructure. The engineer's as -built certification does not need to be included on
C1.0.
33. FYI ... The cost estimate, water report, and sanitary sewer report need to be sealed by an
Engineer prior to plan approval.
34. FYI... Additional Development Permit Fee may be required for a total fee of 1 % of public
infrastructure costs.
Reviewed by: Erika Bridges Date: 2/4/11
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes and provides
descriptive easements for electric infrastructure as designed by CSU for electric lines
(including street lights where applicable).
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
3. The following easements will be required:
➢ Temporary blanket easement for construction purposes.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull
boxes and secondary pedestals provided by CSU).
8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to:
q m a rti n ez(o)cstx.gov.
9. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
10. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
11. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: 02.04.2011
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: February 3, 2011
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 5 of 5