HomeMy WebLinkAboutCost EstimateCONSTRUCTION COST OPINION
PHASE 12, LOTS 1-3, BLOCK 2
TOWER POINT DEVELOPMENT
WPM Project No. 23-05040-12
UNIT
QTY
UNIT PRICE
TOTAL
WASTE WATER ITEMS
8" Sanitary Sewer
LF
431
$
55.00
$
23,705.00
Steel Encasement
LF
59
$
100.00
$
6,900.00
Manholes
EA
4
$
2,600.00
$
10,000.00
Dry -Bore Construction
LF
100
$
42.50
$
4,250.00
WATER LINE ITEMS
8" PVC Waterline
LF
350
$
45.00
$
15,750.00
Fire Hydrant
LS
1
$2,500.00
$2,500.00
TOTAL $63,105.00
WALTER P. MOORE AND ASSOCIATES, INC.
1
TOWER POINT
Construction Cost Opinion
23-05040-12
Printed 5/16/2011
$ 44,855.00
$ 18,250.00
^.;alter P. Moore and ASSnolateS, itlC.
-VE Firm Registration No.18N
f9
W / O-
November 18, 2010
Ms. Erika Bridges
Graduate Engineer
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, Texas 77842
RE: Tower Point Infrastructure, College Station, Texas
Phase 12A, Lot 3, Block 2
Letter Acknowledging City Standards
Dear Ms. Bridges:
The purpose of this letter is to acknowlecigo that the construction plans for the public
infrastructure for the above -referenced project, to the hest of my knowledge, do not deviate
from the Q/CS Design Guideline Manual, Any alternate design or construction methodology that
was used is listed below:
(i`UA)
I also acknowledgo, to the best of my knowledge, that the details provided in the construction
plans arQ in accordance with the Elryan/college Station Standard Details.
Sincerely,
W 1, FR P. Qq RE AND ASSOCIATES, INC.
K 'r P. S ivan, P.E.
A soaiatu
wTBPE firm Regist Associates,
tl n No,1$56
F'A23\200S\05040-12\Corresoorrderae\Letters\Letter Aeknowiedging Dry Slandards.dc=
WALTER P MOORE
CONSTRUCTION COST OPINION
PHASE 12, LOTS 1-3, BLOCK 2
TOWER POINT DEVELOPMENT
WPM Project No. 23-05040-12
WASTE WATER ITEMS
8" Sanitary Sewer
Steel Encasement
Manholes
Dry -Bore Construction
WATER LINE ITEMS
8" PVC Waterline
Fire Hydrant
Dry -Bore Construction
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No.1656
k
KEVIN °. S" Lt
...........
o fi rla 19
UNIT
QTY
UNIT PRICE
TOTAL
LF
468
$
65.00
$
25,740.00
LF
69
$
100.00
$
6,900.00
EA
7
$
2,500.00
$
17,500.00
LF
100
$
42.50
$
4,250.00
LF
509
$
45.00
$
22,905.00
LS
1
$2,500.00
$2,500.00
LF
100
$
42.50
$
4,260.00
TOTAL $84,045.00
WALTER P. MOORE AND ASSOCIATES, INC.
1
TOWER POINT
Construction Cost Opinion
23-05040-12
Printed 11/1/2011
$ 54,390.00
$ 29,655.00