Loading...
HomeMy WebLinkAboutCost EstimateCONSTRUCTION COST OPINION PHASE 12, LOTS 1-3, BLOCK 2 TOWER POINT DEVELOPMENT WPM Project No. 23-05040-12 UNIT QTY UNIT PRICE TOTAL WASTE WATER ITEMS 8" Sanitary Sewer LF 431 $ 55.00 $ 23,705.00 Steel Encasement LF 59 $ 100.00 $ 6,900.00 Manholes EA 4 $ 2,600.00 $ 10,000.00 Dry -Bore Construction LF 100 $ 42.50 $ 4,250.00 WATER LINE ITEMS 8" PVC Waterline LF 350 $ 45.00 $ 15,750.00 Fire Hydrant LS 1 $2,500.00 $2,500.00 TOTAL $63,105.00 WALTER P. MOORE AND ASSOCIATES, INC. 1 TOWER POINT Construction Cost Opinion 23-05040-12 Printed 5/16/2011 $ 44,855.00 $ 18,250.00 ^.;alter P. Moore and ASSnolateS, itlC. -VE Firm Registration No.18N f9 W / O- November 18, 2010 Ms. Erika Bridges Graduate Engineer CITY OF COLLEGE STATION P.O. Box 9960 College Station, Texas 77842 RE: Tower Point Infrastructure, College Station, Texas Phase 12A, Lot 3, Block 2 Letter Acknowledging City Standards Dear Ms. Bridges: The purpose of this letter is to acknowlecigo that the construction plans for the public infrastructure for the above -referenced project, to the hest of my knowledge, do not deviate from the Q/CS Design Guideline Manual, Any alternate design or construction methodology that was used is listed below: (i`UA) I also acknowledgo, to the best of my knowledge, that the details provided in the construction plans arQ in accordance with the Elryan/college Station Standard Details. Sincerely, W 1, FR P. Qq RE AND ASSOCIATES, INC. K 'r P. S ivan, P.E. A soaiatu wTBPE firm Regist Associates, tl n No,1$56 F'A23\200S\05040-12\Corresoorrderae\Letters\Letter Aeknowiedging Dry Slandards.dc= WALTER P MOORE CONSTRUCTION COST OPINION PHASE 12, LOTS 1-3, BLOCK 2 TOWER POINT DEVELOPMENT WPM Project No. 23-05040-12 WASTE WATER ITEMS 8" Sanitary Sewer Steel Encasement Manholes Dry -Bore Construction WATER LINE ITEMS 8" PVC Waterline Fire Hydrant Dry -Bore Construction Walter P. Moore and Associates, Inc. TBPE Firm Registration No.1656 k KEVIN °. S" Lt ........... o fi rla 19 UNIT QTY UNIT PRICE TOTAL LF 468 $ 65.00 $ 25,740.00 LF 69 $ 100.00 $ 6,900.00 EA 7 $ 2,500.00 $ 17,500.00 LF 100 $ 42.50 $ 4,250.00 LF 509 $ 45.00 $ 22,905.00 LS 1 $2,500.00 $2,500.00 LF 100 $ 42.50 $ 4,260.00 TOTAL $84,045.00 WALTER P. MOORE AND ASSOCIATES, INC. 1 TOWER POINT Construction Cost Opinion 23-05040-12 Printed 11/1/2011 $ 54,390.00 $ 29,655.00