Loading...
HomeMy WebLinkAboutWater ReportWater Line Report for Tower Point Infrastructure Development Phase 12, Lots 1-3, Block 2 College Station, Texas Prepared for: Weiner Development Corporation Prepared by: Walter P. Moore & Associates, Inc. 1301 McKinney, Suite 1100 Houston, TX 77010 Walter P. Moore and Associates, Inc. T3PE Firm Registration No, 1856 OF ,re`ys'�1� ANDRES A. SALAZAR,% \► �e..... '~� 5/13/2011 e/3v May 2011 TABLE OF CONTENTS WATERLINE OVERVIEW.......................................................................................2 PROJECT DESCRIPTION......................................................................................2 EXISTING CONDITIONS........................................................................................2 PROPOSED SITE CONDITIONS.............................................................................3 WATERLINE ANALYSIS.........................................................................................3 APPENDIX............................................................................................................. 6 Note: This report supersedes the report dated April 27, 2011. WATER LINE OVERVIEW The water line is to serve Tower Point Subdivision Phase 12, Lots 1-3, Block 2 located in College Station Texas. The water line has been prepared in general conformance with the requirements of College Station and TxDOT. The purpose of the report is to verify water line pressures and velocities of the proposed water line system serving the commercial development for this phase. This water line analysis consists of this narrative plan, the accompanying exhibits included in the appendices. PROJECT DESCRIPTION The site is located is at approximately Latitude 300 33' 48" N and Longitude 960 15' 57" W determined using the USGS map. The site is located in the Wellborn SE Quadrangle Brazos County, Texas. The site slopes from north to south of the property. EXISTING CONDITIONS The site of the project is located approximately 2,900 feet from the northwest corner of the intersection of Highway 6 and Highway 40 in College Station, Texas. The site is bounded by Arrington Road to the north, Highway 6 to the east, and the detention Area of Phase 14, Lot 4, Block 2 on the west and south. The project size is approximately 5.44 acres in size and is currently not developed. The site consists of primarily rocky soil with minimal vegetation. Water Line Report Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 2 PROPOSED SITE CONDITIONS Proposed development consists of a restaurant and commercial retail shops with associated parking, drives, sidewalk, and landscaping. The public infrastructure being constructed consists of new private roadways, public water mains, public storm sewer systems, and public sanitary sewer systems. The new 8" PVC public waterline to serve the proposed lots will be connected to an existing 12" PVC water line system running east - west along the south side of Arrington Road. The tie-in location will be approximately 325' west of Highway 6. The new water line extension will extend south to serve future development on lots 1, 2, and 3 (See Exhibit 1). WATERLINE ANALYSIS Analysis Procedures The analysis procedure used for this waterline system is using the Hardy Cross method determining the waterline flows (gpm), residual pressures (psi), and velocities (fps). Static pressures are higher than residual pressures as the system is impacted by a water flow demand. Calculations were performed with the program WNET. ,JCAJ fnS sViovjv) IV, Required and Design Waterline Criteria for Restaurant a d Col Required O fl C'1 rlc�1 T� { ➢ The required fire hydrant demands are 1,500 gpm per hydrant, or 750 gpm per hydrant for 2 hydrants within 600 feet of each other. In this case, there is only one hydrant and a demand of 1,500 gpm was used. ➢ The required fire hydrant residual pressure is 20 psi. ➢ The maximum velocity is 12 fps, maximum velocity maybe increased on a case by case basis. Water Une Report Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 3 ➢ Normal Flow (Average Daily Flow) is calculated using Method #3, Gross Area Determination, which assumes 7000 gallons/day per acre of lot. Fire hydrants are excluded in this scenario and only water service use from each lot is considered. Demands using Method #2 were calculated, but the demands resulted in lower values than Method #3 and therefore, Method #3 was adopted. Water demands are presented in Exhibit 2, ➢ The Peak Hourly Flow is four times the Average Daily Flow. Existing Analysis The existing 12" water line runs east -west along the south side of Arrington Road, near the intersection of Highway 6. A hydrant test conducted by the City of College Station on April 13, 2011 indicated a residual pressure of 90 psi for a flow of 1,500 gpm. The new waterline analysis below utilized this existing water line pressure information. Proposed Analysis The proposed 8" PVC waterline connects to the existing 12" water line running east -west along the south side of Arrington Road, near the intersection of Highway 6. The proposed line was analyzed under the following scenarios: Scenario 1: No demand. This results in the highest hydrostatic pressure in the system. Scenario 2: Peak hour demand. This reflects typical conditions during periods of high demand. Scenario 3: Peak hour demand plus fire flow. A worse -case scenario, stressing normal conditions with fire flow demand. The peak flow residual pressure is in the order of 88 psi. The residual pressures are much greater than the required 40 psi for the peak flow calculation. The velocity within the 8" Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 4 waterline is less than 0.5 fps for the normal conditions. The maximum velocity adding fire flow is 10 fps, which is within the acceptable limits. Conclusion The new waterline system as proposed has adequate pressure and velocities to provide the water services to the new lots under all scenarios analyzed. Water Line Report Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 5 _00JOWNMW Exhibit 1.....................................................................Proposed Waterline Layout Exhibit 2.......................................................................Input Data for Waterline Modeling Exhibit 3............................................................................ Results of Waterline Modeling Water Line Report Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 6 FWAMIR-owns PROPOSED WATERLINE LAYOUT PROPOSED WATERLINE LAYOUT I I I- i I �66 iII I � II�I I II �- 1 Cm O'N '02) e423 N019NIaJ sa s 8� G^ w0millwallm INPUT TO WATERLINE MODELING VA A ON k \\ k kj k \ \ )\ :} §\ ®�) !!n !!/ ±!/ k }} ■ \!) . ! k )f !j Calculations of Water Demands Demand by Method 2 Lot Area Daily Demand Restaurants Daily Demand Retail Total Daily Demand Average Demand Peak Demand (acres) (gallons) gallons gallons (gpm) m Lot 1 1.87 6,732 1,403 8,135 5.65 22.6 Lot 2 1.56 5,616 1,170 6,786 4.71 18.9 Lot 2.01 7,236 1,508 8,744 6.07 1 24.3 Demand by Method 3 Lot Area Daily Average Peak Demand Demand Demand (acres) (gallons) (gpm) (gpm) Lot 1 1,87 13,090 9.09 36.36 Lot 2 1.56 10,920 7.58 30.33 Lot 3 2.01 14,070 9.77 39.08 Method 3 results in higher demand than Method 2 and is adopted for water demand FVF RESULTS OF WATERLINE MODELING Scenario 1 : No Demand Node Number Node Id, Head Pres. Head Pres. Head Base Demand Elevation Balance ft (ft)(psi) (gpm) (ft) (gpm 4 Lot-1 474.6 208.1 90.22 0 266.5 0 5 Lot-2 474.6 209.4 90.78 0 265.2 0 6 Lot-3 474.6 207.6 90.00 0 267.0 0 1 Sta10+00 474.6 207.6 90.00 0 267.0 0 2 Sta10+43.31 474.6 208.1 90.22 0 266.5 0 3 Sta12+56,74 474.E 212.1 91.95 0 262.6 0 Pipe Summar Pipe Number Pipe Id. From Node To Node Flow V Diameter (gpm (fps) inches 1 P1 Sta10+00 Sta10+43,31 0 0 8 NDW 2 P2 Sta10+43.31 Sta12+56.74 0 0 8 3 P-Lott Sta10+43.31 Lot-1 0 0 8 4 P-Lot2 Sta10+43.31 Lot-2 0 0 8 DW 5 P Lot3 Sta10+00 Lot-3 0 0 8 DW Scenario 2: Peak Hour Demand Node mary Node Number Node Id. Head Pres. Head Pres. Head Base Demand Elevation Balance (ft) (si (gpm) (ft) g m 4 Lot-1 208.1 90.2 -36.36 266.5 0 5 Lot-2 K474.6 209.4 90.76 -30.33 265.2 0 6 Lot-3 207.6 89.99 -39,08 267 0 1 Sta10+00 207.6 90.00 105.77 267 0 2 Sta10+43,31. 208.1 90.21 0 266.5 0 3 Sta12+66.74 474.E 212.1 91.94 0 262.5 0 Pipe Summar Pipe Number Pipe Id. From Node To Node Q V Diameter Friction Formula (gpm)f s (inches) 1 P1 Sta10+00 Sta10+43.31 66.69 0.43 8 DW 2 P2 Sta10+43.31 Sta12+56.74 0 0 8 DW 3 P-Lott Sta10+43,31 Lot-1 36.36 0.23 8 DW 4 P-Lot2 Sta10+43.31 Lot-2 30.33 0.19 8 DW 5 P-Lot3 Sta10+00 Lot-3 39.08 0.25 8 DW Scenario 3: Peak Hour Demand plus Fire Flow IR.r.M- *5 iTi1 7, Node Number Node Id. Head Pres. Head Pres. Head Base Demand Elevation Balance ft (ft) (psi) (gpm ft (gpm) 7 Fire nozzle 268.5 0 0.00 -1500 268.5 0 4 Lot-1 471.8 205.3 88.97 -36.36 266.5 0 5 Lot-2 471.8 206.6 89.53 -30.33 265.2 0 6 Lot-3 474.6 207.6 90.00 -39.08 267 0 1 Sta10+00 474.6 207.6 90.00 1605,77 267 0 2 Sta10+43.31 471.8 205.3 88.97 0 266.5 0 3 Sta12+56.74 464.3 201.8 87.49 0 262.5 0 Pipe Summa Pipe Number Pipe Id. From Node To Node Q V Diameter Friction Formula (gpm) (fps) (inches) 1 P1 Sta10+00 Sta10+43.31 1566.69 10.00 8 DW 2 P2 Sta10+43.31 Sta12+56.74 1500 9.57 8 DW 3 P-Lott Sta10+43.31 Lot-1 36.36 0.23 8 DW 4 P-Lot2 Sta10+43.31 Lot-2 30.33 0.19 8 DW 5 1P Lot3 Sta10+00 Lot-3 39.08 0.25 8 DW Water Line Report for Tower Point Infrastructure Development Phase 12, Lots 1-3, Block 2 College Station, Texas Prepared for: Weiner Development Corporation Prepared by: Walter P. Moore & Associates, Inc. 1301 McKinney, Suite 1100 Houston, TX 77010 P. Moore dnd Inc. TOPE Firm Hon No, 1858 ANDRES A. SALAZAR 5/27/2011 1/�zv May 2011 TABLE OF CONTENTS WATER LINE OVERVIEW.......................................................................................2 PROJECT DESCRIPTION......................................................................................2 EXISTING CONDITIONS........................................................................................2 PROPOSED SITE CONDITIONS.............................................................................2 WATERLINE ANALYSIS.........................................................................................3 APPENDIX.............................................................................................................6 Note: This report supersedes the reports dated May 13, 2011 and older. WATER LINE OVERVIEW The water line is to serve Tower Point Subdivision Phase 12, Lots 1-3, Block 2 located in College Station Texas. The water line has been prepared in general conformance with the requirements of College Station and TxDOT. The purpose of the report is to verify water line pressures and velocities of the proposed water line system serving the commercial development for this phase. This water line analysis consists of this narrative plan, the accompanying exhibits included in the appendices. PROJECT DESCRIPTION The site is located is at approximately Latitude 300 33' 48" N and Longitude 96' 15' 57" W determined using the USGS map. The site is located in the Wellborn SE Quadrangle Brazos County, Texas. The site slopes from north to south of the property. EXISTING CONDITIONS The site of the project is located approximately 2,900 feet from the northwest corner of the intersection of Highway 6 and Highway 40 in College Station, Texas. The site is bounded by Arrington Road to the north, Highway 6 to the east, and the detention Area of Phase 14, Lot 4, Block 2 on the west and south. The project size is approximately 5.44 acres in size and is currently not developed. The site consists of primarily rocky soil with minimal vegetation. PROPOSED SITE CONDITIONS Proposed development consists of a restaurant and commercial retail shops with associated parking, drives, sidewalk, and landscaping. The public infrastructure being constructed consists of Water Line Report Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 2 new private roadways, public water mains, public storm sewer systems, and public sanitary sewer systems. The new 8" PVC public waterline to serve the proposed lots will be connected to an existing 12" PVC water line system running east - west along the south side of Arrington Road. The tie-in location will be approximately 325' west of Highway 6. The new water line extension will extend south to serve future development on lots 1, 2, and 3 (See Exhibit 1). WATERLINE ANALYSIS Analysis Procedures The analysis procedure used for this waterline system is using the Hardy Cross method determining the waterline flows (gpm), residual pressures (psi), and velocities (fps). Static pressures are higher than residual pressures as the system is impacted by a water flow demand. Calculations were performed with the program EPANET. Required and Design Waterline Criteria for Restaurant and Commercial Developments ➢ The required fire demand is 2,500 gpm. This demand can be split in 1,000 gpm at one existing hydrant on Arrington Dr and 1,500 gpm at the proposed hydrant in the development. In this case, the model included the existing fire hydrant. ➢ The required fire hydrant residual pressure is 20 psi. ➢ The maximum velocity is 12 fps, maximum velocity may be increased on a case by case basis. ➢ Normal Flow (Average Daily Flow) is calculated using Method #3, Gross Area Determination, which assumes 7000 gallons/day per acre of lot. Fire hydrants are excluded in the normal flow scenario and only water service use from each lot is considered. Demands using Water Una Report Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 3 Method #2 were calculated, but the demands resulted in lower values than Method #3 and therefore, method #3 was adopted. Water demands are presented in Exhibit 2, ➢ The Peak Hourly Flow is four times the Average Daily Flow. Existing Analysis The existing 12" water line runs east -west along the south side of Arrington Road, near the intersection of Highway 6. A hydrant test conducted by the City of College Station on April 13, 2011 indicated a residual pressure of 90 psi for a flow of 1,500 gpm. The new waterline analysis below utilized this existing water line pressure information. Proposed Analysis The proposed 8" PVC waterline connects to the existing 12" water line running east -west along the south side of Arrington Road, near the intersection of Highway 6. The proposed line was analyzed under the following scenarios: Scenario 1: No demand. This results in the highest hydrostatic pressure in the system. Scenario 2: Peak hour demand. This reflects typical conditions during periods of high demand. Scenario 3: Peak hour demand plus fire flow. A worse -case scenario, stressing normal conditions with fire flow demand. The peak flow residual pressure is in the order of 88 psi. The residual pressures are much greater than the required 40 psi for the peak flow calculation. The velocity within the 8" waterline is less than 0.5 fps for the normal conditions. The maximum velocity adding fire flow is 10 fps, which is within the acceptable limits. Water Line Report Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 4 CONCLUSION The new waterline system as proposed has adequate pressure and velocities to provide the water services to the new lots under all scenarios analyzed. Water Line Report Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 5 /_1=00117►7 Exhibit 1.....................................................................Proposed Waterline Layout Exhibit 2.......................................................................Input Data for Waterline Modeling Exhibit 3............................................................................ Results of Waterline Modeling Water Line Report Tower Point Infrastructure Development - Phase 12, Lots 1-3, Block 2 Page 6 PROPOSED WATERLINE LAYOUT PROPOSED WATERLINE LAYOUT EXHIBIT 2 INPUT TO WATERLINE MODELING MODELING AND NAMING CONVENTION Dry 1. tzpa AM Existing Hydrant Modeling of friction loss uses Darcy-Weisbach equation with roughness equal to 0.005 milifeet. Calculations of Water Demands Demand by Method 2 Lot Area Daily Demand restaurants Daily demand retail Total Daily Demand Average Demand Peak Demand (acres) (gallons) (gallons) (gallons) m m Lot 1 1.87 6,732 1,403 8,135 5.65 22.6 Lot 2 1.56 5,616 1,170 6,786 4.71 18.9 Lot 3 2.01 7,236 1,508 8 7q4 6.07 24.3 Demand by Method 3 Lot Area Daily Average Peak Demand Demand Demand (acres) (gallons) (gpm) (gpm) Lot 1 1.87 13,090 9.09 36.36 Lot 2 1.56 10,920 7.58 30.33 Lot 3 2.01 14,070 9.77 39.08 Method 3 results in higher demand than Method 2 and is adopted for water demand EXHIBIT 3 RESULTS OF WATERLINE MODELING Scenario 1- No Demand Network Table - Links Length Diameter Roughness Flow Velocity Unit Headloss Friction Factor Link ID ft in mft GPM fps ft/Kft Pipe 1 157 12 0.005 0 0 0 0 Pipe 2 43 8 0.005 0 0 0 0 Pipe 3 213 8 0.005 0 0 0 0 Pipe 4 12 8 0.005 0 0 0 0 Pipe 5 70 8 0.005 0 0 0 0 Pipe 6 1 8 0.005 0 0 0 0 Pipe 7 10 12 0.005 0 0 0 0 Network Table - Nodes Elevation Base Demand Demand Head Pressure Node ID ft GPM GPM ft psi JuncSta10+00 267.0 0 0 475 90.1 JuncSta12+56 262.5 0 0 475 92.1 Junc Lot2 262.5 0 0 475 92.1 Junc Lott 266.5 0 0 475 90.3 JuncSta10+43 266.5 0 0 475 90.3 Junc Lot3 262.5 0 0 475 92.1 Junc Hyd1 267.0 0 0 475 90.1 Resvr PipeFeed 475.0 kN/A 01 475 0.0 Scenario 2 - Peak Hour Demand Network Table - Links Length Diameter Roughness Flow Velocity Unit Headloss Friction Factor Link ID ft in mft GPM fps ft/Kft Pipe 1 157 12 0.005 105.77 0.3 0.04 0.03 Pipe 2 43 8 0.005 105.77 0.68 0.4 0.037 Pipe 3 213 8 0.005 30.33 0.19 0.03 0.03 Pipe 4 12 8 0.005 -36.36 0.23 0.11 0.085 Pipe 5 70 8 0.005 39.08 0.25 0.05 0.037 Pipe 6 1 8 0.005 30.33 0.19 0.61 0.699 Pipe 7 10 12 0.005 105.77 0.3 0.03 0.024 Network Table - Nodes Elevation Base Demand Demand Head Pressure Node ID ft GPM GPM ft psi Junc Sta10+00 267.0 0 0 474.99 90.1 Junc Sta12+56 262.5 0 0 474.97 92.1 Junc Lot2 262.5 30.33 30.33 474.97 92.1 Junc Lott 266.5 36.36 36.36 474.97 90.3 Junc Sta10+43 266.5 0 0 474.98 90.3 Junc Lot3 262.5 39.08 39.08 474.97 92.1 Junc Hyd1 267.0 0 0 475.00 90.1 Resvr PipeFeed 475.0 #N/A -105.77 475.00 0.0 Scenario 3 - Peak Hour Demand Plus Fire Flow Network Table - Links Length Diameter Roughness Flow Velocity Unit Headloss Friction Factor Link ID ft in mft GPM fps ft/Kft Pipe 1 157 12 0.005 1605.77 4.56 6.44 0.02 Pipe 2 43 8 0.005 1605.77 10.25 69.09 0.028 Pipe 3 213 8 0.005 1530.33 9.77 28.53 0.013 Pipe 4 12 8 0.005 -36.36 0.23 0.11 0.085 Pipe 5 1 701 8 0.005 39.08 0.25 0.05 0.037 Pipe 6 1 11 8 0.005 30.33 0.191 0.61 0.699 Pipe 7 1 101 12 0.005 2605.771 7.391 10.63 O.o13 Network Table - Nodes Elevation Base Demand Demand Head Pressure Node ID ft GPM GPM ft psi JuncSta10+00 267.0 0.00 0.00 473.88 89.6 JuncStal2+56 262.5 1500.00 1500.00 464.83 87.7 Junc Lott 262.5 30.33 30.33 464.83 87.7 Junc Lott 266.5 36.36 36.36 470.91 88.6 Junc Sta10+43 266.51 0.001 0.001 470.91 88.6 Junc Lot3 262.51 39.081 39.081 470.91 90.3 1uncHydl 267.01 1000.001 1000,001 474.89 90.1 Resvr PipeFeed 475.0 #N/A 1 -2605.771 475.00 0.0