HomeMy WebLinkAboutApplication (13-150)(*0r4"
Crry OP COLLr-'GH STi1T10N
Home ofTeearAGM rhiiyersHy"
11�_11 Sip
FOR OFFICE USE ONLY
CASE NO.:
DATE SUBMITTED:
TIME: A _j. CO
STAFF. :�ejL
DESIGN REVIEW BOARD APPLICATION
WOLF PEN CREEK DEVELOPMENT REVIEW
(Check all that apply. Note: All items checked must be presented to the Design Review Board at the
same time): Site Plan / Building ❑ Building tK Sign
MINIMUM SUBMITTAL REQUIREMENTS:
$350 Design Review Board Application Fee.
Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered. Please attach pages if additional information is provided.
For Site Plan / Building consideration:
(� $932 Site Plan Application Fee.
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance
is due prior to the issuance of any plans or development permit).
® $350 Non -Residential Architectural Standards Building Review Application Fee (if applicable).
Fourteen (14) folded copies of site plan.
One (1) folded copy of the landscape plan.
[� One (1) copy of the following for building review (if applicable).
Building elevations to scale for all buildings.
A list of building materials for all facade and screening.
® Color samples for all buildings or list colors to be used from the approved color palette.
Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
Two (2) copies of the public infrastructure plans and supporting documents (if applicable).
The attached Site Plan and Non -Residential Architectural Standards Building Review checklists (if
applicable) with all items checked off or a brief explanation as to why they are not check off.
For Building consideration:
$250 Non -Residential Architectural Standards Building Review Application Fee (if applicable).
( One (1) copy of building elevations to scale for all buildings.
A list of building materials for all facades and screening.
�j Color samples for all buildings or list colors to be used from the approved color palette.
The attached Non -Residential Architectural Standards Building Review checklist with all items checked off
Aor a brief explanation as to why they are not checked off (if applicable).
or Sign consideration:
.g Ten (10) copies of sign details with dimensions.
Ten (10) copies of the building elevation showing sign placement (if attached signage is proposed).
Ten (10) copies of color samples.
Material samples.
NOTE: Proposed development in Wolf Pen Creek must be reviewed by the Design Review Board. When staff has
completed their technical review of the proposal, it will be scheduled for consideration by the Design Review
Board. Ten (10) copies of all current design plans and color samples will be required for the Board.
1/11 Page 1 of 11
Date of Optional Preapplica/tion or Stormwater Management Conference
NAME OF PROJECT C.f1 ede" "'' �c -T 6C �a4��ih°� t
/ nn nn pp 7�( %
ADDRESS 23no Y0.T ( tGIVaO tz v.u, � (fin.
LEGAL DESCRIPTION (Lot, Block, Subdivision) ' le't 24—t�r '56,1-c i 6u1t�, 1'(ace_ 5obD((Vi r
'PLICANT/PROJECT MANAGER'S INFORMATION
I p
Name /04we- t 1�111A(PpMns
for the project): (�
E-mail
Street Address ( AJ'-nmj_ P-%
City C. � , State Zip Code 779�
Phone Number Fax Number
PROPERTY OWNER'S INFORMATION:
Name M4e,
Street Address
City
Csf, 4, Q -
State
Phone Number Fax Number
OTHER CONTACTS (Please specify type of
Name 5I ve, r �
t/JA(.1 1 / PoL
Street Address
E-mail Mrke `�=�AUew��r`5 - e"ivl
Zip Code `f 75703
i.e. project manager, potential buyer, local contact, etc.):
City 6)'e& v; (1� State
Phone Number qo3 — 4)5— 5631
Fax Number
E-mail oJd.P./�cjeu5
l etCcr
Zip Code
information is necessary to help staff identify the appropriate standards to review the application and will be used to
determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
ng is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
r Yes
F No
provide information regarding the first approved application and any related subsequent applications (provide
nal sheets if necessary):
Project Name:
City Project Number (in known):
Date / Timeframe when submitted:
1/11 Page 2 of 11
Proposed use of property MI'A9 i (�nic; 4;r
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? ((Yes ( No
Square footage of attached sign _% I (W )
Square footage of freestanding signFor Site Plan consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Site Lighting:
Solid Waste:
vM tJA6�e e4CIWS F'� w � 11 MA�ek 4�z ex sn'+y ��"`f" � V' )wrh"I,
Relationship of building(s) to site:
y�rlL(r�1v� i5 An All 4fctii),4vml demo,Y3.
Relationship of building(s) and site to adjoining areas:
fl, 40Z b,;R;45 Olil 41d`l-f 41 (IkIA(" s ri will W&'Ck well w,11. Av- dol�\iey s;{N,
Building footprint design:
t�yiyw et "KAt �n� l es a? �iti Gke eu;s :N5 64v vr-- C is 41 it All') pr
lcr<i)s.
Miscellaneous structures and street hardware:
Landscaping:
J1
�rx�P�.(•AP7'?J 15 R ,P4+,— NriS)iti4 la+l)SCaf/7C C,^ 'de,
Site Maintenance:
1/11 Page 3 of 11
For Building consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Building Lighting:
LEI ti.� If ( 4 (e JJA4U ham- J li'�— ex,y� ry Iryt ,a�.
Solid Waste Screening:
See, 414 P, AA
Relationship of building(s) to site:
/, s:')e pkcn SeAA.
Relationship of building(s) and site to adjoining areas:
�(e 54p ly 5'"010 •
Building design:
6L'Jk",J i5 J'-'I')"ed �e M'A dO, 'qtl "� A"Z- Atria; 44',"1 e(eweeJ5 I �krs�„y b.iQQ5-
Maintenance (as related to Building design):
For Sign consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Signs:
Tk6 5tga6 XO;11 be A#'V�J 6b1a5 AAA Wal �,��y wk 41,c U6o ce.plgir4;
V'? 51mfja.r * 46v— rxislr a 6nP6 an o; ;q
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true,
correct, pnd conklvto.
I—q-l3
Date
1/11 Page 4 of 11
FOR OFF VU7 4Y
CASE SUB DATE SUBMITTE
+ TIME:
CITY 01: COLLEGE STATION' SITE PLAN APPLICATION STAFF, .n �
Home of Tr AEM Unim%W
GENERAL
MINIMUM SUBMITTAL REQUIREMENTS:
W 932 Site Plan Application Fee.
350 Non -Residential Architectural Standards / Northgate Building Review Application Fee (if applicable).
® $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
® Application completed in full. This application form provided by the City of College Station must be used
nd may not be adjusted or altered.
Fourteen (14) folded copies of site plan.
One (1) folded copy of the landscape plan.
ne (1) copy of the following for Non -Residential Architectural Standards building review or Northgate
Building Review (if applicable).
E' Building elevations to scale for all buildings.
(� A list of building materials for all facade and screening.
® Color samples for all buildings or list colors to be used from the approved color palette.
® Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov.
4j Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
Alp,0 Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
nit❑ Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
r- proposed request (if applicable).
(� The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all iteris checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT ilea• et "n !&b •
ADDRESS '2;tV0 'c4r'1 R0001tr twy uV• I • "D -
LEGAL DESCRIPTION (Lot, Block, Subdivision) f s�'_&1 �114� U S'' ''
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name 64vt "J0IPre^ E-mail SWaMtwt;@ MAC, Go+h
Street Address 30-Z. Ayy ( 645 W,
City heyeAyilia _State 'Tx Zip Code
Phone Number 214, 1-3 �l Fax Number --
PROPERTY OWNER'S INFORMATION: n l t
Name AV-4- �A`ffA;fr t*&11 frNf^P E-mail ent,tt (d uVrtl�j� Street Address Me S' FiMotglrJlkT
city _ State �X Zip Code 7570 3
Phone Number Qa3 7oiASOcI Fax Number qo3,
Page 1 of 11
7(11
ARCHITECT OR ENGINEER'S INFORMATION:
Name A e-01
Street Address
City
(. -W,;r �.rrcbro�ne.�c .tom
State IK Zip Code 75 2 79$45
Phone Number 16S- 4N3' ` 452 41", Fax Number
OTHER CONTACTS (Please specify type of contact): '3388
Name
E-mail <igV�GAYE�2JS.tP+e
Street Address' Wr i w w "E "—�
City -N AvN _ State Tic Zip Code %Spa 1
Phone Number RVS— 511-41gL Fax Number
Current zoning W F'l
Present use of property "
Proposed use of property R6IO.A`
Number of parking spaces required Number of parking spaces proposed
Is there Special Flood Hazard Area (Zone A or Zone AE r—
, on FEMA FIRM panels) on the property? Yes o
This information is necessary to help staff identify the a�pprapriate standards to review the application and will ba used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion nwde,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
r Yes
V4- No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name: --
City Project Number (in known):
Date / Timeframe when submitted:
Page 2 of 11
1l11
MULTIFAMILY RESIDENTIAL
Total Acreage
Floodplain Acreage
Housing Units
#of 1 Bedroom Units
# of 2 Bedroom Units
# of 3 Bedroom Units
# of 4 Bedroom Units
FOR 2 BEDROOM UNITS ONLY
# Bedrooms = 132 sq. ft.
PARKLAND DEDICATION
(Fees due prior to the issuance of a Building Permit)
# of Multi -Family Dwelling Units
X$1636=$
# of acres in floodplain
# of acres in detention
# of acres in greenways
Date dedication approved by Parks &
Recreation Advisory Board
COMMERCIAL
Total Acreage ...,
Building Square Feet �� ,��flfjpnlE�t51�
Bedrooms -132 sq. ft. Floodplain Acreage
Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government
Code may be assessed a different amount, Please contact city staff for additional information.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
and correct.
i/f�V�Pi �GIMQ/ti �6�t l�l�iv
Signature and title
ill
�VI'l 3 2013
Date
Page.-,, of 11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit maybe revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is reissued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates Wit be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If. stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets. or
existing drainage facilities. Ali development shall be in accordance with the plans and specifications submitt
m ed to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release., of plans and development for construction is contingent on
contractor signature on approved Devei pment Permit.
TS HEREIN, 13 ITHE DEVEL R. ENT P CvRETO D C ,,RTIFY THAT ALL STATEMEN LICA ION, ARE, TO THE BEST OF MY KNOWDEDGE, TRUE; AND IN ATTACHMENTS FOR
7-3-13
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 wilt obtain or can show compliance with all necessary Local. State and Federal Permits prior to construction
including NOt and SWPPP. Design will not preclude compliance with TPDES: i,e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code. Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. 1, THE ENGINEER. AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AN D IN ATTACHMENTS
FOR THE DEVELQPMENT PERMIT APPLICATION. ARE. TO THE BEST OF MY KNOWLEDGE. TRUE, AND
ACCURAT,E-,,, //
Engineer
11l
Date
3-[3
P, = 0' ..
The following CERTIFICATIONS apply to development In Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:*
A I �VfFCOJ l vr&F'KSP N certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(III) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood Is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those are a empted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances.
tj
Engin Date
Initial
* If a platting -status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill I Grading Permits:
B, I �N L . t 1t .,. , certify to the following:
(i) that any nonresidential or multi -family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm.
EnginIL
r
-?h )i3
Dat
Additional certification for Floodway Encroachments:
C. i , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer
Date
Page b of 11
1/11
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
Engineer / Surveyor
Commercial Structures:
Date
E. 1, , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer I Surveyor Date
IM
1, , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood -proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided wtth elevations certified during construction (forms at slab pre -
pour) and post construction.
Engineer / Surveyor
Conditions or comments as part of approval:
Date
1/11 Page 6 of 11