Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station,Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 6 Engineer's Estimate of Street Construction Item Description Unit Estimated uantit Unit Price Total Sitework & Pavement 1 Mobilization/Construction Staking LS 1 6,000.00 6,000 2 Site Preparation/Clearing and Grabbing AC_ 3 2,000.00 6,600 3 Topsoil Removal & Replacement LS 1 6,000.00 6,000 4 Excavation Grading LS 1 15,000.00 15,000 5 Mixing & incorporation of lime, 6" deep _ SY 4,612 2.20 10,146 6 Hydrated Lime (271b/sy) Ton 62 ___ 170.00 10,540 7 6" Crushed Limestone Base _ _ _ SY_ 4,112 11.06 45,232 8 2" Hot Mix Asphaltic Concrete SY _3,338 _ 11.00 36,718 9 Seeding (edge of pavement to ROW & easements SY 10,480 0.30 3,144 Sitework and Paving Subtotal $138,780 Drainage System 10 24" HDPE Pipe - Structural Backfill LF 60.00 12,060 11 Silt Fence LF 250 0 12 Rock Riprap4"to8" SY [:201 40.00 5,040 13 Drainage Channel Excavation and Grading LF 1500 8,175 14 Construction Exit EA 1,000.00 1,000 15 SWPPP Im lementation & Maintenance LS 1,000.00 1,000 Drainage Subtotal $27,275 STREET ESTIMATED CONSTRUCTION TOTAL $166,05511 (B - l3 swuLTZ ENGINEERING. LLCi q {o Z stied 'oll '9)NI833NWN3 Z.11nH3S V1 91'1 6LL`9£$ NOL land, LSN03 3NI7N3d tlM Q3d tlW1 LS3 Ob8$ 09$ bI V2 saxogxalaW 61 OOS$ OOS$ I S1 Bull SolouipaluM 81 Oob'Z$ _ 008$ £ tla apls 8u01- aalnaag 1a19M 1,51 Ll 096'I$ 099$ £ tlH apisuogs-aalvagaaleM ,S'I 91 080'1$ 01$ 80l d'7 sanaalSDAd�,b SI 099$ 099$ _ t _ tlff opts 8uol - 03lAI0s aaleM „I bt apis lJogs - aatnaas aalLM j £ t OOS$ OOS$ ! _ tlH aut-I xaleM 8upsira of laauu03 ZI OOS$ __ OOS$ _ t d3 Algwasstl,}}omolg „Z I I oSZ$ OSZ$ 1 tlH puag'f'W oSb „b OI OOZ$ OOZ$ I V3 pu08 'm ,SZ' l 1 „4 8 00L`1$ OS8$_ Z_ tlH anleAal-6'f'W„9 L 00£$ 00£$ __ I tld aaonpoll 'PW ,b X „9 9 OS£$ OS£$ [ tlH 1a3upa-Iv fW ,9 x ,18 S 006$ OSb$ _ Z ___va aay •f' W 119 X ,9 7 OOS'9$ OSZ'£$ _ .91$ Z _ dH (uolsualxa •IiaA `aAleA/m) ,Clgwassy luwp6g alid £ SZS`£$ — S£Z_ d1 IlmoeHlexnlon.pS-uofy-adldXaleM006n7b Z b81`171$ 81$ 88L d I — !lg>faeg lejnlamlS-uoN-adldaalgM 0063 „9 1 uials,Cg �aleM Isloy aalid llun !luunj� polewllsg Ilan uolldlaasa4 wall u01113n.>lsu03 cull ialeM;o alamilsd s,Jaau!Sud 9 asegd °uoisiAipgnS 31aa i,D aippvS UM 'ON WJIJ SVOL1 Sexal `uol}e;S 060110a d ellnS `GAlaa GllwBuol 0£LZ 'ail `JNIH33NIJN3 wnHaS SCHULTZ ENGINEERING, LLC, 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 6 Engineer's Estimate of Street Construction Item Description Unit Estimated Unit Price Total uantit Sitework &Pavement 1 Mobilization/Construction Staking LS 1 6,000.00 6,000 2 Site Preparation/Clearing and Grubbing AC 3 6,000 3 Topsoil Removal & Replacement - ---- _ LS 1 _2,000.00 6,000.00 6,000 4 Excavation/Grading LS 1 15,000.00 15,000 5 Mixing & incorporation of lime, 6" deep _ SY 4,612 2.20 _ 10,146 6 Hydrated _Lime (27 Ib/sy) Ton 62 170.00 _ 10,546 7 6" Crushed Limestone Base SY 4,112 11.00 45,232 8 2" Hot Mix Asphaltic Concrete SY 3,338 11.00 36,718 9 Seedin (edge of pavement to ROW &easements SY 10,480 0.30 3,144 Sitework and Paving Subtotal $138,780 Drainage S stem 10 24" HDPE Pipe - Structural Backfill LF 201 60.00 12,060 11 Silt Fence LF 2.50 0 12 Rock Riprap 4" to 8" SY 126 40.00 5,04o 13 Drainage Channel Excavation and_Grading LF 545 15.00 8,175 14 Construction Exit EA 1 1,000.00 1,000 15 SWPPP Implementation & Maintenance LS I 1,0 00.0-6 1,000 Drainage Subtotal $27,275 STREET ESTIMATED CONSTRUCTION TOTAL $166 O55 r6- 13 SCHULTZ ENGINEERING, LLC; SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No.12327 Saddle Creek Subdivision, Phase 6 Engineer's Estimate of Waterline Construction Item Description p Unit Estimated Quanti Unit Price Total Water System l 6"C900Water Pipe - Non -Structural Backfill LF $14,184 2 4"C900WaterPipe - Non -Structural Backfill LF $IS_ $3,525 3 Fire Hydrant Assembly (w/valve, vert. extension) EA $3,250 $6,500 4 6" x 6" M.J. T_ee EA T788$I8 $450 $900 5 8" x 6" M.J. Reducer EA$350 $350 6 6" x 4" M.J. Reducer EA $300 $300 _ 7 6" M.J. Gate Valve EA 2 $850 $1,700 8 4" 11.25° M.J. Bend _ EA 1 $200 $200 10 4" 45° M.J. Bend _ EA 1 _ $250 _ $250 11 _ 2" BlowoffAssembly _ 1 $500 $500 12 Connect to Existing Water Line _EA EA 1 $500 $500 _ 13 l" Water Service - short side EA 1 $450 $450 14 _ l"Water Service -long side EA 1 $650 $650 15 4" PVC Sleeves LF _ 108 $10 $1,080 16 1.5" Water Service - short side EA 3 $6501 $1,950 17 1.5" Water Service - long side EA 3 _ $8001 $2,400 18 Waterline Testing LS 1 $500 $500 19 jMeterBoxes EA 14 $60 $840 ESTIMATED WATERLINE CONSTRUCTION $36,779 V — 1 cyi1 SCHULTZ ENGINEERING, LLC. Page 2 of 4