HomeMy WebLinkAboutLetter of AcknowledgementSchultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
July 16, 2013
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging City Standards — Saddle Creek Subdivision — Phase 6, Brazos
County, Texas
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the water line,
roadway and drainage construction for the above -referenced project, to the best of my
knowledge, do not deviate from the B/CS Design Guideline Manual.
Sincerely,
Jo eph . Schultz, P.E.
Civil Engineer
�o A
O
P.O. Box 11995 • College Station, Texas 77842
schuitzengineeringlic.com
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
September 19, 2013
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging Culvert Backfill Requirements — Saddle Creek Subdivision —
Phase 6
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction of the storm sewer
culverts for the above -referenced project was done in accordance with the approved plans
and the HDPE culvert pipe was embedded and backfilled with cement stabilized sand.
Sincerely,
J eph P. Schultz, P.E.
Civil Engineer
-f 1
F-12327
SCHULTZ ENGINEERING, LLC.
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com