Loading...
HomeMy WebLinkAboutLetter of AcknowledgementSchultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 July 16, 2013 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards — Saddle Creek Subdivision — Phase 6, Brazos County, Texas Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water line, roadway and drainage construction for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. Sincerely, Jo eph . Schultz, P.E. Civil Engineer �o A O P.O. Box 11995 • College Station, Texas 77842 schuitzengineeringlic.com Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 September 19, 2013 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging Culvert Backfill Requirements — Saddle Creek Subdivision — Phase 6 Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction of the storm sewer culverts for the above -referenced project was done in accordance with the approved plans and the HDPE culvert pipe was embedded and backfilled with cement stabilized sand. Sincerely, J eph P. Schultz, P.E. Civil Engineer -f 1 F-12327 SCHULTZ ENGINEERING, LLC. P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com