Loading...
HomeMy WebLinkAboutDrainage ReportDrainage Report for Saddle Creek Subdivision, Phase 6 Brazos County, Texas July 2013 Engineer: Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979)764-3900 Developer: Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690-2642 Saddle Creek Subdivision, Phase 6 Drainage Report ENGINEER Schultz Engineering, LLC. P.O. Box 11995 College Station, Texas 77842 Phone: (979) 764-3900 Fax:(979) 764 OWNERIDEVELOPER Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979)690-2642 GENERAL DESCRIPTION AND LOCATION Location: Saddle Creek Subdivision, Phase 6, is located on the south west side of FM 2154, off of Stousland Rd. Description: • Area: • Proposed Land Use. • # of Lots: • Existing Land Use: • Land Description: Primary Drainage Facility: Flood Hazard Information: FEMA FIRM: Floodplain: 25.546 acres Single Family Residential 16 lots Vacant The terrain slopes towards the southwest. Boggy Creek # 48041C0375E (May 16, 2012) Un-shaded Zone X HYDROLOGIC CHARACTERISTICS The existing site is predominately wooded. The elevations range from 304 to 272, sloping generally in a south westerly direction. The runnoff enters tributaries of Boggy Creek. GENERAL STORMWATER PLAN The drainage plan for this development will involve the construction of ditches, channels and the installation of a culvert structure. DRAINAGE DESIGN General (formation: Stormwater runoff from Phase 6 of the subdivision will be collected in the ditches along Vinatge Oaks Court to be discharged into a proposed drainage channel. The proposed channel will discharge into an existing drainage way. See Exhibits A and B for drainage areas and culvert and channel locations. Page 1 of 3 T, Methodology: TR 55 T, Minimum 10 minutes Design Storm Event: 25-year & 100-year -residential street & culvert, drainage channel Culvert Materials: HDPE Pipe with cement stabilized sand backfill Manning's n Value: 0.012 Runoff Coefficient: 0.45 The Rational Equation was used for the ditch and channel design Design Results — Culvert Pipe: Design Results — Channel: Applicable Exhibits: Culvert No. 601 Culvert Size 3-24" Pipes Top of Road Elev 283.09 Qz5 50.32 V25 6.75 HW25 281.50 Qioo 60.15 Viao 7.41 HW,00 281.36 The data presented above and in the Appendices indicates the culvert size is in accordance with the requirements. The head water elevation for the culvert is less than the top of road elevation for the 100-yr storm runoff. The ditch at the outlet of the proposed culvert will be lined with rock riprap to prevent erosion from high velocities. The velocities in the roadside ditches will be such that grass lined ditches are adequate. Channel No. 1 Sloe 0.8 z5 54.89 Vz5 3.40 D25 1.44 as 65.55 Vioo 3.56 Dioo 1.56 Channel No. 1 has a 4' bottom width, 5H:1 V side slopes. The channel will have a minimum depth of 2' for adequate freeboard. The design velocity is less than 4.5 fps which allows a grass lined channel. Exhibit A — Drainage Area Map — Culvert 601 Exhibit B - Drainage Area Map Appendix A — Drainage Area Summary Appendix B — Time of Concentration Appendix C — Pipe Design Summary & Culvert Reports Appendix D - Ditch Design Summary Appendix E - Channel Design Summary and Reports Page 2 of 3 F-12391 ` SCHUL Z ENGINEERING LLd CONCLUSION The culverts, roadside ditches, and drainage channel for this subdivision were designed in accordance with appropriate engineering standards. CERTIFICATION I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for Saddle Creek Subdivision, Phase 6, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge Department. ,6�/3 Jos P. chintz, P.E. Page 3 of 3 Exhibit A Drainage Area Map — Culvert 601 126 19 /22 u 23 �5 96 LB�LOC 6 24 1 128 601, LvtK v oc rF 301 143, 5.6 $00 302/-t 304- 13 CHA NELl 141 B /140 1�8 /I 'v 4 v zy L 302 i m BLOCK '00- 1�6( 1-33 1 64 xr.3 13� I J Schultz Engineering, LLC 2?M t�. 5�9 A C I U iu�7ii'll PCP JP3 13-235 2013 SADDLE CREEK SUBDIVISION DRAINAGE AREA SCALE EXHIBIT PHASE 6 BMZOS COUNTY, TX MAP Exhibit B Drainage Area Map — Ditch Design 126 �.. 94- `` \ 24 128 \a \� 60 VERT /�, �\ \ ` / / / / / \ / / / / / r I/ ol.11�l` ,l;.a( /�� \ / / \ 19.76 fj� 2�y r- __.�. ---• [ ?9 /�1 9 ///Gq 14&-%/% \4G1 / !1 / 0,5 /' �I�3 /)/ Q 0 \ \� / 3010 / / � //`j'w $/ r — — / .,--J __//'.. •^'"' / \ \(`%�'�' ,�/.✓"/ I 13 / /� \ 0.31 i // (I I '_ I ' I }►� 'Y I p / / I / `/% -�� \_r 30M1'---- \ / \U� \ \I (�ry�y CHA,NEL t X. 141 BL, 0� i1 1I1111/011 g 13.1 /l //r7"�/4/N�/Lryq�' yoo '1/ M" o/� _� , 1� ♦<� I� ( �\_.-//�!/'�I1f l torn / 3.17 ' (I BLoCK0.66 \` a '. 1-33 1 4 \ I�I� \�� \ I 1 6 [y�q(� r 'Jf�it1 1� �� t.JItiL�l K_()���p/' II�I� � \IiI 13� \�\ t' �o \ �`^\� \?D 00 / f — ! _ `+. Zeg\ `-•-. ?8j\ Wgy ��Y�S. �, . �I N N N \ \ �� \ \ '1 \ � \ � / I � \ I 0 0� E ltz Engineering, LLC of .s . '91B.iGd9i0 i0PEN0. i}3}I UMSY{P COgM[D gUMM NMOV{0 NN M0. MR JPS SCi JPS 13-255 JUNE 2015 SCALE EXHIBIT SADDLE CREEK SUBDIVISION DRAINAGE AREA BnaPHASEZOS 6 MAP TX DITCH DESIGN � 13-253 Appendix A Drainage Area Summary Saddle Creek Subdivision - Phase 6 Appendix A Drainage Area Summary Area # Area, A (acres) C te (min) 25 year storm 100 year storm 125 (in/hr) Q25 (cfs) 1100 (in/hr) Q100 (cfs) 301 25.61 0.45 46.0 4.367 50.32 5.219 60.15 301A 5.03 0.45 10.0 9.861 22.32 11.639 26.35 301B 0.31 _ _ 0.45 _ 10.0 9.861 1.38 11.639 1.62 301C 0.50 0.45 10.0 9.861 2.22 _ 11.639 2.62 301 D 19.76 0.45 46.0 4.367 38.83 5.219 46.41 302 1.03 __.._ 0.45 10.0 9.861 4.57 11.639 5.39 302A _ 0.20 _ 0.45 _ 10.0 _ 9.861_ 0.89___ 11.639_ 1.05__ 3028 O.t7 _ 0.45 _ 10.0 9.881 0.75 11.639 0.89 302C 0.66 0.45 10.0 9.861 2.93 11.639 3.46 The Rational Method: Q = CIA Q = Flow (cfs) A = Area (acres) C = Runoff Coeff. I = Rainfall Intensity (in/hr) Brazos County: I = b / (tc+d)e tc = Time of concentration (min) 25 year storm 100 year storm b = 89 b = 96 d = 8.5 d = 8.0 a = 0.754 e = 0.730 t, = L/(V*60) L = Length (ft V = Velocity (ft/sec) Appendix B Time of Concentration m m U) LL Appendix C Culvert Design Summary & Culvert Reports o, v U QLo N N M OI G y � � N 5 M O V K N =p C C N QCL o � y o 7 U c � � N C �... er N . OC- a m aZ � Culvert Report Hydraflow Express Extension for AutOCAD® Civil 3DB 2013 by Aulodesk, Inc. Tuesday, Jul 9 2013 Pipe 601 - 25 yr Storm Invert Elev Din (ft) = 278.66 Calculations Pipe Length (ft) = 67.00 Qmin (cfs) = 50.32 Slope (%) = 0.81 Qmax (cfs) = 60.15 Invert Elev Up (ft) = 279.20 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 50.32 No. Barrels = 3 Qpipe (cfs) = 50.32 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 5.79 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 6.75 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dirt (ft) = 280.40 HGL Up (ft) = 280.68 Embankment Hw Elev (ft) = 281.50 Top Elevation (ft) = 283.09 Hw/D (ft) = 1.15 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 a. (e) 284M 28300 28200 261.00 28e00 2]9.00 2)8.00 21M Pipe 601-25 yr Storrs CkWarCulved - HOL Embank H. OepM (8) Culvert Report Hydraflow Express Extension for AUtoCAD® Civil 3D® 2013 by Autodesk, Inc. Tuesday, Jul 9 2013 Pipe 601 - 100 yr Storm Invert Elev Dn (ft) = 278.66 Calculations Pipe Length (ft) = 67.00 Qmin (cfs) = 50.32 Slope (%) = 0.81 Qmax (cfs) = 60.15 Invert Elev Up (ft) = 279.20 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 60.15 No. Barrels = 3 Qpipe (cfs) = 60.15 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 6.72 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 7.41 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 280.46 HGL Up (ft) = 280.81 Embankment Hw Elev (ft) = 281.86 Top Elevation (ft) = 283.09 Hw/D (ft) = 1.33 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 elav (ft) 294.00 283.00 282.00 281 M 28000 279.00 278A0 277,00 Pipe 601-100 yr Storm — ch.lercelved HOL — embank Hwoeplh(ft) I80 380 2,80 1.80 0.80 .0.20 -1.20 Appendix D Ditch Design Summary a ! ! ! ! ! ! $! !! ! ` $ 0 - |■ ) ) ) ) ) | ) ) ) ) ) 7 ! ! £ ! « ! ! § « ( Appendix E Channel Design Summary & Reports 8 O x N 8 n 8 � � uNi b � � i yd. O Nj p �1 O L to Ili C tiJ' M C C W y c y�j X C N a OR C C N d A t U h d N O N a V 0 U Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Channel No 1 - 25 yr Storm Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 278.66 Slope (%) = 0.80 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 54.89 Elev (ft) Highlighted Depth (ft) Q (cfs) Area(sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jul 9 2013 = 1.44 = 54.89 = 16.13 = 3.40 = 18.69 = 1.16 = 18.40 = 1.62 Depth (ft; 289.00 2.34 280.50 280.00 279.50 279.00 278.50 0711. OO Secti n 9 1.84 1.34 0.34 5 10 15 20 25 30 Reach (ft) 35 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Channel No 1 - 100 yr Storm Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 278.66 Slope (%) = 0.80 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 65.55 Elev 281.00 280.50 280.00 279.50 279.00 278.50 278.00 (ft) Section Tuesday, Jul 9 2013 Highlighted Depth (ft) = 1.56 Q (cfs) = 65.55 Area (sgft) = 18.41 Velocity (ft/s) = 3.56 Wetted Perim (ft) = 19.91 Crit Depth, Yc (ft) = 1.27 Top Width (ft) = 19.60 EGL (ft) = 1.76 ------------ - kf- Depth (ft; 2.34 1.84 1.34 �! 0.34 0.16 5 10 15 20 25 30 Reach (ft) 35