HomeMy WebLinkAboutWater ReportWater System Report
for
Saddle Creek Subdivision
Phase 6
Brazos County, Texas
June,2013
Prepared By.,
Schultz Engineering, LLC
TBPE Firm Registration No. 12327
2730 Longmire, Suite A
College Station, Texas 77845
979.764.3900
F-12,521
SCHULTZ ENGINEERING, LLC:
S-1'3
General Information
Location: Saddle Creek Subdivision, Phase 6, Lots 130-143, Block 6
General Note: The water lines to serve these 15 residential lots will be a 6" & 4" along
Vintage Oaks Court. The 6" line along Vintage Oaks Court will connect
to the 8" line that was constructed in Phase 3 with a reducer.
Land Use. Single family residential
Design Criteria/Analysis
Primary Water Supply: Existing 8" water line along Vintage Oaks Court which connects to a 12"
waterline on Saddle Creek Drive.
Existing System Pressure Tests:
Flow Hydrant - See Exhibit B
Flowrate: 1340 gpm
Static Pressure: 87 psi
Residual Pressure: 65 psi
Exhibits: Exhibit A — Location Map
Exhibit B — Hydrant Flow Test Results
Appendix A — WaterCAD Analysis Summary — Domestic Demand
Appendix B — WaterCAD Analysis Summary — Fire Flow Demand @ FHl
Fire Flow: 1,000 gpm for Single Family Residential
Domestic Use 1.5 gpm per lot for Single Family Residential
Total Domestic Demand 15 Lots = 22.5 gpm
The proposed 6" & 4" water lines are in accordance with the BCS Water
Design Guidelines. This report provides the results of the water system
analysis under the fire flow and domestic demand requirements, which
produced the lowest pressure in the system.
Conclusion
Summary of Calculations
Domestic Demand
Pressure
Min.
80.9
Velocity Max
0.47
Domestic Demand & Fire
Pressure
Min.
54.7
Hydrant 1
Velocity Max
11.52
Domestic Demand &Fire
Pressure
38.9
Hydrant 2
Velocity Max
11.52
The minimum pressure (38.9 psi) for this system occurs when a Fire
Flow demand is set at Fire Hydrant Number 2. The Max Velocity for this
system occurs at the same demand when the velocity in Pipe P-11 has a
velocity of 11.52 fps.
All of these pressures exceeds the 20 psi and 35 psi minimum pressure
requirements, respectively. The maximum pipe velocities are less than 12
fps.
The proposed 6" and 4" water lines meet or exceed all of the design
criteria for the City of College Station and the Wellborn Special Utility
District except as previously noted. It will provide adequate water
pressure, flowrate and velocity for both domestic and fire flow demands.
Exhibit A
WATER SYSTEM LAYOUT
1
43 / 37
/ I 4(i
\ 1
45 \ I
44 1
1
72R `
\ / 73
`/ 74
i' BL(C'K2
i
83 � /
76
/ \ 77
79
I
1 78
BLOCK 2 r
81B
\\ t'oJSe�Je
9�
\ 99
1
I
47 I 48 51
1 4`1 I 50
1 1 I
I ,
_ 1 I
_ R-1
High Meadow Trail r
56 1 1 54 1
57 I 1 55 I , 53 27
I I I I
I 1 I I
I I BL CK 4 1 - -
u 26
59
.SS 1
1 60 9f
De
V image Oakes
125 V 126
08 '
127
n
_ 45 `
IN \ /
LOCK. (i
/ 146
110
1
121 47
149
120 BLOCK 7 ,
/ 112
119 /113 d`iie
/
•y i
N
118 /
Q 0®
25
r'inta`` � i�`u
128 /
1491i
k \
129
L
ltz Engineering, LLC
B1W 4rymYa.3W A
hMg Slgbn, ]X)]015
ma.)&.3BOJ lYE M0. 1]311
autumn xzaxm oxAwrr Arreovm ,rofl xo. art
KEflR JPS RCF JPS 13-255 JUNE 2013
Y
/
'Fl-
/ / I 137 / 138 I / `�
I
/ 136
139
140
F 2
BLOCK 6 135
143 Q
1411'c� 134 \ N
1 142 1
I \ BLOCK6
-11 H-2 133
132 �\ �
131
� I I
]30 I I
/ 1
I
152
&d'
250 125 0 250
154 1SCALE IN FEET
B
SCALE EXHIBIT
SADDLE CREEK PHASE 6 W" BRYAN, TEXAS WA EXHIBIT
namm wu, t11
n¢ NW[] 13-255
Exhibit B
HYDRANT FLOW TEST RESULTS
EXHIBIT B
SCHULTZ ENGINEERING, LLC
FIRM #12327
WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT
Date: 4-4-2013
Water System Owner: Wellborn SUD
Development Project:
Saddle Creek Subdivision Phase 6
Flow Test Location: Between Lot 29 and 30, Block 3 on Prairie Dawn Trail
Nozzle size (in.): _2.5_ Discharge Coeff: (c) = 0.90
Pitot Reading (psi): 65 Flowrate Formula: Q=29.84cd2p1/2
1340 c = discharge coeff.
Flowrate (gpm): d = orifice size (in)
P = pitot pressure (psi)
Pressure Gauge Location: Between Lot 51 and 52, Block 3 on High Meadow Trail
Static Pressure (psi): 87_
Residual Pressure (psi): 65
Computed Discharge at 20 psi Residual Pressure: QR = 2440
Discharge Formula: QR = QF X (hr0.54/hf .54)
------------------------------------------------------------------------------------------------------
Note: The flow test and report were prepared in accordance with NFPA 291,
Report Prepared by: Joe Schultz
Ricky Flores
Others Present: _ Clenden Adams — Wellborn SUD
Britt Curless
OiAr
� L 'a d J
F-12327
ENGINEERING. LLG.
Appendix A
WATERCAD ANALYSIS SUMMARIES
Domestic Demand
Appendix A
WaterCAD Analysis Summary
Pine Analysis - DnmPcrir namnnri
Pipe
Number
Length (ft)
Size (in)
Material
Hazen-
Williams C
Flow
( m)NO
Velocity
P-1
272
4
PVC
150
-9
0.23
P-3
P-4
525
568
8
8
PVC
PVC
150
150
-26
-12
0.16
0.08
P-5
646
12
PVC_
150
-20
0.06
P-6
1,013
8
PVC
150
-41
_
0.26
P-7
118
8
PVC
150
22
0.14 --
P-8
814
6
PVC
150
22
0.25
P-9
19
8
PVC_
150
74 —
0.47
P-10
628
6
PVC
150
-15
0.17
P-11
155
6
PVC
150
-15
0.17
Appendix A
WaterCAD Analysis Summary
Junction Analysis - Domestic Demand
Junction
Elevation
Junction
Demand
(gpm)
Pressure
(psi)
_J-2
295
9
80.9
FH-2
290
6
83
J-4
282
11
86.5 —
J-5
280
9
87.4
J-6 _
274.5
7
89.7
J-7
273
21
90.4
J-8
281.5
11
86.7
J-9
282.5
0
86.3_
FH-2
283.59
0
85.8
Appendix B
WATERCAD ANALYSIS SUMMARIES
Fire Flow Demand
Appendix 8
WaterCAD Analysis Summary
Pine Analvsis - Fira rImA, I[u_i i
Pipe
Number
Length (ft)
Size (in)
Material
Hazen-
Williams C
Flow
( m)
Velocity
(ft/s
P-1
P-3
P-4
272
525
568
4
8
8
PVC
PVC
PVC
150
150
150
9
-1,026
-609
0.23
6.55
3.89
P-5 _
_ 646
12
PVC
150
-616
1.75_
P-6
1,013
8
PVC
150
-637
_
4.07
P-7
118 —
_ 8
PVC
150
426_
2.72
P-8
— 814
6_
PVC
426
4.83
P-9
19
8
PVC
_150
150
1,074_
6.85
P-10
_628
6
PVC
150
-15
0.17
P-11 1
155
6
PVC
150
-1,015
11.52
mPNenu!x n
WaterCAD Analysis Summary
Junction Analysis - Fire Flow Demand (FH-11
Junction
Elevation
Junction
Demand
(gpm)
Pressure
(psi)
J-2
295
9
54.7
FH-2 _
290
6
J-4
282
11
_56.9 _
64.3
J-5
280
9
88.5
J-6
274.5
7
72.3
J-7
273
21
73.1_
J-8
281.5
_
11
72.1
_J-9
282.5
0
71.5
FH-2
283.59
1,000
59.7
Appendix B
WaterCAD Analysis Summary
Pipe Analysis - Fire Flow Demand
Pipe
Length (ft)
Size (in)
Material
Hazen-
Flow
Velocity
Number
Williams C
g m
NO
P-1
272
4
PVC
150
-9
0.23
P-3
525
8
PVC
150
1,026
6.55
P-4
568
8
PVC
150
-609
3.89
P-5
646
12
PVC
150
-616
1.75
P-6
1,013
8
— —
PVC
--._
150
---
-637
4.07
P-7
118
8
PVC
_
150
426_
2.72 -
-P-8
814
_ 6
PVC
150
426
P_g
-- 19 -
8 _
PVC
150_
1,074
_4.83
6.85
_
P-10
628
6
PVC
150
-1,015
_
11.52
P-11
155
6
PVC
150
-1,015
11.52
Appendix is
WaterCAD Analysis Summary
Junction Analvsis - Fire Flow Demand lFNat
Junction
Elevation
Junction
Demand
(gpm)
Pressure
(psi)
J-2 _
_ 295
9
38.9_
FH-2
290
1,006
41
1-4
282
64.3
J-5
280
_11
9
68.5
J-6
274.5
7
72.3_
J-7
273
21
73.1
1-8
281.5
11
72.1
J-9
282.5
0_
71.5
FH-2
283.59
0
59.7