Loading...
HomeMy WebLinkAboutPCN & Report, March 6, 2015 Mr. Stephen L Brooks Regulatory Division (CESWF-DE-R) Fort Worth District U.S. Army Corps of Engineers 819 Taylor Street, Room 3A37 Fort Worth, Texas 76102-0300 RE: Creek Meadows -Section 7, Phase One & Two USACE -NWP 29 PCN Cover Letter RME No. 260-0551 Mr. Brooks: 3800 SH No. 6 South, Ste. 108G <77845> P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 764-0704 email: civil@rmengineer.com Please find attached the PCN (Pre-Construction Notification) and the Delineation Report for the realignment of Peach Creek South Tributary 16.4.3. It is my understanding that the above referenced project, is covered by the general NWP 29 and the proposed disturbances are below the maximum "losses". It is the intent of the developer to receive approval of this General Permit prior to commencement of construction. Please do not hesitate to call if you have any questions. Sincerely, Rabon A. Metcalf, P .. No. 885 3 Texas Firm Registration No. F-4695 rabon@nnengineer.com CD 1-260-0551-LO l .docx Page 1 of l