Loading...
HomeMy WebLinkAboutLetter Acknowledging City Standards44ZIultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 July 11, 2013 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards — Castlegate II Subdivision — Section 102 Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B/CS Standard Details. h P. Schultz, P.E. Engineer F-12327 SCHULTZ ENGINEERING, LLC, P.O. Box 11995 • College Station, Texas 77842 sch u Itzengi neeringllc. com J / �3 44ZIulfEngineering, LLC Office: 979.764.3900 Fax: 979.764.3910 December 17, 2013 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards — WS Phillips Parkway 12" Waterline Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the waterline for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual except that due to the minimum clearance requirement for the Explorer Pipeline, Waterline W-2A exceeds the maximum bury depth of 5 feet. No other alternate design or construction methodology was used. I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B/CS Standard Details, Sincerely, C Jo ph P. Schultz, P.E. Civil Engineer «-1J-( F-12327 5CHULTZ ENGINEERING, LLC. P.O. Box 11995 • College Station, Texas 77842 13 10, schultzengineeringllc.com la 1-7i3 i� Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 December 16, 2013 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards — Castlegate II Subdivision— Section 102 Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual except that W. S. Phillips Parkway horizontal and vertical alignment was designed for a design speed of 35 mph instead of 40 mph as required by the Design Guidelines. No other alternate design or construction methodology was used. I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B/CS Standard Details. Sincerely, Jo eph P. Schultz, P.E. Civil Engineer A................... JOSEPH P. SCHULTZ 6588� NAL iz.i7-r3 F-12327 SCHULTZ ;ENGINEERING, LLC. P.O. Box 11995 • College Station, Texas 77842 schultzengineeri ng Ilc. com