Loading...
HomeMy WebLinkAboutDevelopment Permitc2 a) mca°no mtf c n o 2 N .O O a) c a) U 0 o N U o aa)NE vmota°i mm W L 5CcE�ac m om cO ac E m oa-O '°- °c�a mmaaio�m °c i.ac W� � m 'o`m a) 0, �2c 2n`Q2. amco cv L N 3 N N' 4= (n@ O N QO w F=- Y`o a E oo n� ���a.ma` uNU c 3 U N Z 3 0 n E o 0.0 c° L m o m t �F cZ 30 o�°�nw��°crn� Nm� aw E QU Q N m w2 a waOcmioo°my mu3� 0c o O �a°Z 0a)m.o3 cmOWo m °U �co `imo O 00� 9 E 3a c��� NCm < mrn EZ'EE�om ��qW Q(jz�WM a:IZ � ooUoE�oE om~QU Lij O = co 2Yc m�mcp'S>`o ngrn m;t Z p U J fn 0 > U w N 21 0 E ac a N E E n L n m� m U aN U�+ W d J0 d m M- ui ) a) 0c o E= U Q c a) p� aai o - M v 0 EzU) E cam. oaw °N3o ff °tea wn. 1m CL U c N o�� m ° m m ° U N m- E m w OwW as m �c Ew �a >L ow NU.E Z o J�d==rna=a3amoo� 'L3 a0�O U -Fuco a �a wo ac o cNO Za2 r4 Y WWW coW.E W O >� °- °oO $ Nm o N•N om,wBL �m o ,Nm te -E -0 c_°(L)c E` 2cm N o 2- .2 0 -co m m E 6) � 0E c m o -o MOW ti N m m z-°aci .a o c w aNWN W Q .E c w. c a3° co iOU cE aO-y°ofl- =dtm caN3�ao �m E> cpao m arnco�E�E'o 'c �m)QU s.2 crn° �cE UU)a> v >cN m u O N U o a) NoE 2-c w(D ° ° cr.9 '3 -o O O W Z >OC dd a a O O N a H Z IL CL W> 2 o N c Y L N t c r° mc=°Ow E >Uco°kNi4a c w v m W c wa�Lwom_No mm 0n°m.am°E °WW �mc�cLomm2cTcaci cU"o°"',cyo Z.0m � -FD OQ c U. a - o N$m a)UO=W nEU�wQN O aa) uE__a)O O >ON N � O �a C- NoEEA QQ QW ZZhFO oU ga�U)<ZM d U OQO - co I;i t0 CO I-� W 6 z ro m 0 ♦�1 DEVELOPMENT PERMIT c PERMIT NO. DP 13-142 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA Q I Y or CouI:cB S M) ICIN 4,, RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Castlegate II Section 102 Terminus of Muncaster DRAINAGE BASIN: Spring Creek DATE OF ISSUE: 2/24/2014 VALID FOR 24 MONTHS OWNER: CONTRACTOR: 3-D Development 4490 Castlegate Dr College Station, Tx 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. % Special Conditions: ***TCEQ PHASE II RULES IN EFFECT*** No work near pipeline until Pipeline Encroachment Agreement is finalized. No work on 12" water line until Participation Agreement iffinalized. Contractor Signature Phone number the Contractor, hereby agree to comply with all conditions herein. Date E-mail I hereby grant this permit for development. Contact 1 %, ( X KD j "��, the Public Works Inspector assigne to this project 24 hours prior to beginning construction for scheduling required Inspections. o-- Z__-- z City Engineer/Represe tive Date