HomeMy WebLinkAboutLetter Acknowledging City StandardsBleyl & Associates
Project Engineering & Management
February 21 , 2008
Josh Norton, EIT
Planning and Development Services
City of College Station
P 0 Box 9960
College Station, TX 77842
RE: LETTER ACKNOWLEDGING CITY STANDARDS
ReMax of Bryan/College Station
Dear Mr. Norton:
1 722 Broadmoor
Suite 210
Bryan, TX 77802
The purpose of this letter is to acknowledge that the construction plans for the water, sanitary
sewer, streets and drainage for the above-referenced project, to the best of my knowledge,
do not deviate from the B/CS Design Guideline Manual.
I also acknowledge, that to the best of my knowledge, the details provided in the construction
plans are in accordance with the Bryan/College Station Standard Details.
Sam J. Vernon, P.E.
Project Manager
Bryan
(979)-268-1125
(979)-260-3849
Austin
(512)-328-7878
(512)-328-7884 Fax
Conroe
(936)-441-7833
(936)-760-3833 Fax
Item
Number Quantity Unit
1 1 LS
2 1 EA
3 42 LF
4 1 EA
5 1 LS
Mobilization
CITY OF COLLEGE STATION
REMAX OFFICE BUILDING
Engineer's Opinion of Cost
B&A Job # 7050
Description
Unit
Cost
$750.00
18" x 6" tapping sleeve and valve, complete $2,000.00
6" PVC waterline including fittings by open cut $25.00
Furnish and install fire hydrant unit $2,500.00
Trench safety $500.00
Construction Subtotal
___ ..... ,,,,
----'C-OF r ''\ ;,,~ ........ 12"¥_ ''• ~ eb' •• •• * ··;:'ld' • J' * .. ·. * ., !!*:° ... *~ ~··········· ............. ·····~ ~ SAM J. VERNON I , ........................ ·····1
l ~ .._ 99353 /~I
fft Q ···~(C£N5~~··· ~ f ,, "····~·~~-\ StONAL€ -''"~I.,_., J ioo9J
Total
Cost
$750.00
$2,000.00
$1 ,050.00
$2,500.00
$500 .00
$6,800.00