HomeMy WebLinkAboutFireflow ReportBleyl & Associates Project Engineering & Management February 21 , 2008 Josh Norton, EIT Development Engineering City of College Station P.O. Box 9960 College Station, Texas 77842 Re: ReMax Office Building Fire Flow Report Dear Josh, 1 722 Broadmoor Suite 210 Bryan, TX 77802 The proposed ReMax Office Building is 11 ,822 square feet in size. An 8' x 12' storage building will also be on site bringing the total square footage to 11 ,918. The submitted design shows a proposed fire hydrant to be constructed along the north line of the property adjacent to University Drive right of way. The furthest corner of the building is 225 feet from the proposed fire hydrant, well under the 400 foot maximum. A second fire hydrant is located approximately 330' west of the proposed fire hydrant. The construction classification for this building is Type llB. Table B105.1 of the IFC shows a required fire flow of 2,250 gpm for 2 hours. Two hydrants are required with a maximum average spacing of 450 feet. This flowrate can be achieved by a combined flow of both hydrants. An 18" ductile iron water main inside a 20' easement along the south University Drive (FM 60) right of way supplies water to the site. For residual pressures, Charles Willis with College Station Utilities provided a flow test report for the closest fire hydrant along University Drive. At this location the static pressure was 110 psi. With a test flow of 1635 gpm the residual pressure remained at 110 psi. I confirm that by adding a fire hydrant onto the existing water distribution system, the combined fire flow from these two hydrants will exceed 2,250 gpm at a 20psi residual pressure as required by the Uniform Design Guidelines. r n, P.E. Project Engineer Bryan (979)-268-1125 (979)-260-3849 Austin (512)-328-7878 (512)-328-7884 Fax Conroe (936)-441-7833 (936)-760-3833 Fax lit~( Co llege Station Utilities ~ R,eJiable, Affordable, Communit Owned Date Friday, February 01, 2008 Time 1:15PM Test completed by Matthew Matcek Witness Sergio Vasguez , AJ Daily Location University Dr (By Veterans Park) Nozzle size 2.5 Flow hydrant G-056 Pltot reading 95 G.P.M. 1635 Static hydrant G-057 Static PSI 110 Residual PSI 110 Comments Item Number Quantity Unit 1 1 LS 2 2 EA 3 2 EA Mobilization CITY OF COLLEGE STATION REMAX OFFICE BUILDING Engineer's Opinion of Cost B&A Job # 7050 Description 18" x 6" tapping sleeve and valve , complete Unit Total Cost Cost $750.00 $750.00 $2,000.00 $4,000.00 Furnish and install fire hydrant unit including anchoring tee, valve, and lead $2,500.00 $5,000.00 Construction Subtotal $9,750.00 _ ..... ,, .... ,,,, ----f:, OF T \\ ;'\~ ........ ~A--\,, r~ .. ·· ···;:\$' • '*... ... * ,, it*: ·. *~ I·· ....................... I •• ·~ I SAM J. VERNON ~ ~eeeeee1e I 1e1ee1e111eelII111111 l1 ~... 99353 :' /.5 J ,°(;~{(9_~,Nm~~p~·&~ \\ S1i -,,, -- ~-4 f O \ioof>