Loading...
HomeMy WebLinkAboutReponse to CommentsRESPONSE TO STAFF REVIEW COMMENTS NO. 1DATED111312008 Project: CASTLE ROCK PH 28 (FP) -08-00500244 ENGINEERING COMMENTS NO. 2 1. For roadway fill in existing drainage ditch areas please note Specs 302, 303, 305, 310, and 315. Added Note 6 to Sheets 2 & 3 and Note 7 to Sheet 4. 2. Service connection to Manhole No . 1 shall be close to flow line or drop installed. The flowline of the sewer service has been lowered closer to the f/owline of the sewer line, and the service flowline is shown on the profile. 3. Verify flushing assembly is not needed on Waterline W-1 at 42" storm crossing. (Sheet 8) A fire hydrant has been added near the low point. ADDITIONAL REVISIONS A plan and profile of Waterline W-8 has been added to Sheet 8.