Loading...
HomeMy WebLinkAboutCost EstimateEngineer's Estimate For Sanitary Sewer Improvements To VA.J,J,$'( ~Brook Apartments Lot 10, Block 71 -Fratemity Row College Station, Brazos County, Texas 6" Diameter STR26-3034 P.V.C. Sanitary Sewer Line 2. One Sandard Manhole -O' -8' Depth Existing 6" Water Line Stub-Out 3. 1.5 Vertical Feet Extra Depth Manhole Wall (Over 8') * June, 2000 * L.F. 1 EA. 1.5 V.F. Amount $560.00 $1,400.00 $1,400.00 $135.00 $202.50 Total Estimated Cost For Water Improvements: $2, 162.50 REVIEWED FO F{ CO"~PI ''-' f'.ICE JUN 9 2000 COLLt:Gt: ~; ;· . "··" • ENGINEERING 2. 3. 4. 5. 6. Engineer's Estimate For Water Improvements To \Me.\&'t ~Brook Apartments Lot 10, Block 71 -Fraternity Row Coll ege Station, Brazos County, Texas * June, 2000 * Estimated Amount Unit Price 6" Diameter C900 -Class 200 P.V.C. L.F. $16.00 $5,600.00 Water Line 6" x 6" x 6" M.J. Tee "Cut-In" To 1 EA. $350.00 $350.00 Existing 6" Water Line Stub-Out 6" M.J. Gate Valve With Box 1 EA. $450.00 $45 0.00 Standard City Of College Stat.ion Fire 1 EA. $1,900.00 $I .000.00 Hydrant Assembly With Appurtenances 6" Plug With 2" Blow-Off Valve 1 EA. $450.00 $450.00 6" x 2" M.J. Tee With 2" Plug For 2 EA. $250.00 $500.00 Service Connection Total Estimated Cost For Water Improvements: $9,250.00 REVIEWED FOR C0"~PI 'f\ NCE JUN 9 2000 COLLEGE Si J-..' 1 i0i,. ENGINEERING Engineer's Estimate For Pavement & Sidewalk Improvments To · ·VA~'f o0tlk: Brook Apartments Lot 10, Block 71 -Fraternity Row College Station, Brazos County, Texas Pavement & Sidewalk Improvements: 6" -3000 P.S.I. Concrete Pavement With 1/2" Diameter Bars @ 16" O.C. Bothways 2. 6" Concrete Monolithic Curb 3. 4" -3000 P.S.I. Concrete Sidewalk With #6-6" x 6" Welded Wire Mesh Reinforcement * June, 2000 * S.F. 55 L.F. 1383 S.F. Estimated Unit Price $3.75 $4.50 $2.50 Amount $4.4 1 o.nn $247 . .'iO Total Estimated Cost For Pavement & Sidewalk Improvements: $8, 11 5.00 REVlEWED FO h C0"~PI I" f\.ICE JUN 9 2000 COLLEGI:: ~ I h 1 iv " ENG\NEERING