Loading...
HomeMy WebLinkAboutStaff Comments(* rf1" a'� CITY OF COT LLGL STATION Home ofTe=A&M Univeuih,' - 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 7, 2009 TO: Shaun O'Donovan, O'Donovan Builders; via fax 979-690-7545 ✓ 4 la--7•Cq FROM: Jennifer Prochazka, AICP Senior Planner SUBJECT: CASHION DENTAL (SP, NRA, DP) Thank you for your submittal of a complete site plan/development permit/non-residential architectural standards application. This project met the October 7, 2009 submittal deadline and will be distributed to staff next week for their review. cc: JCC Trinity Properties, LLC; via fax 979-693-9384VI� v7-cq Joe Shcultz, Harle Engineering; via fax 979-693-7191 ✓2� 10,7,1-*� RL Payne & Associates; via fax 9796968114 v'44 I p l Case file no. 09-00500208 Case file no. 09-00500209 Case file no. 09-10500058 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY 01; C01 axGr: STATION NoM. orru,�mns u,-w�;n MEMORANDUM October 19, 2009 TO: Shaun O'Donovan via fax 690.7545�� ID'091`D-Ca FROM: Matt Robinson, Staff Planner SUBJECT: CASHION DENTAL (SP)- Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Cover memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Four (4) revised site plans; One (1) landscaping plan; If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact me at 979.764.3570. Attachments: Staff review comments PC: JCC Trinity Properties, LLC via fax 693.9384✓ 4 tollo-cl Joe Schultz, P.E., Harle Engineering Company via fax 693.7191V�4 lbft'W R.L. Payne & Associates �,-a�o� Vjel e1rjj;;jj J ,Gbyy) Case file #09-00500208�n�QY I i STAFF REVIEW COMMENTS NO. 1 Project: CASHION DENTAL (SP) — 09-00500208 PLANNING 1. The parking calculation for a Dental Clinic is 1/200 sf. This changes the required number of spaces to 15. 2. Please remove the wheel stop on the handicap space as this reduces the allowable parking space below the minimum 18-foot required. 3. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Matt Robinson Date: 10/16/09 LANDSCAPING/STREETSCAPING/BUFFER 1. Three hundred additional landscape points are required for every 50 linear feet of frontage on a right-of-way. It appears that only right-of-way frontage on the SH6 Frontage Road was calculated. Bridle Gate Drive will need to be included in this calculation. These additional points can be dispersed throughout the site and as an fyi, driveway openings, visibility triangles, and other traffic control areas may be subtracted from the total frontage. 2. Please revise the streetscape point calculation and total point calculation to reflect the changes requested. 3. Please specify the height of the buffer and screening plantings. As an fyi, screening of the parking lot must be at a minimum of three feet above the parking lot pavement elevation and buffer plantings must be a minimum of three feet in height. Reviewed by: Matt Robinson Date: 10/16/09 ENGINEERING 1. Plans are still under review— comments are forthcoming. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. All easements on site are existing. Electric facilities will be designed within existing easements. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: gmartinez@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Gilbert Martinez al 979.764.6255. Reviewed by: Gilbert Martinez Date: 10.16.2009 FIRE 1) Fire lane markings need to be on the entire curb area to cover the building. A Fire lane sign is needed at the entrance from Bridle Gate dr. 2) A Knox Box will be needed for this building. Reviewed by: Steve Smith SANITATION 1. Sanitation is ok with this project. Date: 10/15/09 Reviewed by: Wally Urrutia Date: October 13, 2009 STAFF REVIEW COMMENTS NO. I Project: CASHION DENTAL (SP) — 09-00500208 PLANNING Z1. The parking calculation for a Dental Clinic is 1/200 sf. This changes the required number of spaces to 15. The parking analysis table has been changed. �. Please remove the wheel stop on the handicap space as this reduces the allowable parking space below the minimum 18-foot required. The wheel stop has been removed. �3. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. The electric meter location has been moved so it is not on the SH 6 fagade. LANDSCAPING/STREETSCAPING/BUFFER 11. Three hundred additional landscape points are required for every 50 linear feet of frontage on a right-of-way. It appears that only right-of-way frontage on the SH6 Frontage Road was calculated. Bridle Gate Drive will need to be included in this calculation. These additional points can be dispersed throughout the site and as an fyi, driveway openings, visibility triangles, and other traffic control areas may be subtracted from the total frontage. The table on the revised Landscape Plan addresses both street right of ways, /2. Please revise the streetscape point calculation and total point calculation to reflect the changes requested. / The point calculation table has been revised on the Landscape Plan 3. Please specify the height of the buffer and screening plantings. As an fyi, screening of the parking lot must be at a minimum of three feet above the parking lot pavement elevation and buffer plantings must be a minimum of three feet in height. The plants have been noted to be a minimum height of 3' in the size column of the table on the landscape plan. Reviewed by: Matt Robinson Date: 10/16/09 ENGINEERING 1. Please note the fire flow and number of fire hydrants required on this site based on building size and material type (Table B105.1 and C105.1 of the Fire Code). This information added to the site plan as Site Specific Note No. 12. 2. Please submit or have contractor submit NOI prior to DP approval. A copy of the Small Construction Site Notice for this project is attached. 10- Jb.AU-0 p,. �� 3. Please verify that the proposed planting along SH 6 are not located directly above the existing utilities, it may be helpful to put a note on the landscape plan. The existing utilities are shown on the Landscape Plan and the trees are shown to not be on top of existing utilities. 4. Please verify that the required fire lane pavement meets min. standard. It has been note on the plans that the existing driveway is 7" thick concrete and the fire lane area to be added is noted as 6" thick on the pavement plan so that it meets the minimum standard. 5. The TxDOT permit application has been forwarded to the state for review. Noted 6. (Drainage Report) As this project is not proposing detention, please *certify that the development is utilizing rapid conveyance to the primary channel, verifying that the sites discharge hydrograph and peak is ahead of the main channels hydrograph is such a manner that it does not create a new resulting peak greater than the main channels existing peak, so that there are no negative impacts. The certification letter is attached. 'Certification from BCS Unified Drainage Guidelines: found in Section 2.C.3.b "9 have conducted a topographic review and field investigation of the existing and proposed flow patterns for storm water runoff from (name of subdivision or site project) to the main stem of (name of creek). At build -out conditions allowable by zoning, restrictive covenant, or plat note, the storm water flows from the subject subdivision or site project will not cause any increase in flooding conditions to the interior of existing building structures, including basement areas, for storms of magnitude up through the 100-year event 7. (Drainage Report) Please verify that the parking lot does not hold more than 6 inches of water during a 100 yr event. The water depth would have exceeded 6" in the parking lot at the entrance to the curb opening so the curb opening width was increased from 2' to 3' and this change is shown on the plans. The flume width transitions from 3' to 2. The max depth in the parking lot for the 100-yr storm is calculated to be 0.49' (5.9"). The flow depth in the flume is 3" ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION All easements on site are existing. Electric facilities will be designed within existing easements. Noted GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: gmartinez@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. All comments noted. FIRE 1) Fire lane markings need to be on the entire curb area to cover the building. A Fire lane sign is needed at the entrance from Bridle Gate dr. The fire lane striping on the site plan has been revised as requested. 2) A Knox Box will be needed for this building. A note added to the site plan, Site Specific Note No. 11. SANITATION 1. Sanitation is ok with this project. Noted