Loading...
HomeMy WebLinkAboutApplication (09-208)CITY OP COLLEGE .STATION Home of7crm A&M Vmmniry' SITE PLAN APPLICATION GENERAL MINIMUM SUBMITTAL REQUIREMENTS: FOR OFFICE USE O(//N1�� CASE NO.: me DATE SUBMITTED: IQ D61 TIME: STAFF: - n�i $668 Site Plan Application Fee. $250 Non -Residential Architectural Standards Building Review Application Fee (if applicable). $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 0.75% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ❑x Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Fourteen (14) folded copies of site plan. WOne (1) folded copy of the landscape plan. ❑x One (1) copy of the following for Non -Residential Architectural Standards building review or Northgate Bui ing Review (if applicable). Building elevations for all buildings. ❑X A list of building materials for all facade and screening. OX Color samples for all buildings or list colors to be used from the approved color palette. \C] Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ❑x Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Notice of Intent (NOi) if disturbed area is greater than five (5) acres cumulatively. Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of approval (if applicable). The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT A New Office Building for Cashion Dental ADDRESS 4050 SH 6 South College Station TX 778454 LEGAL DESCRIPTION (Lot, Block, Subdivision) Lick Creek Subdivision Phase 1 Lot 3 Block 1 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name O'Donovan Builders - Shaun O'Donovan E-mail odonovanbuilders@suddenlink.net Street Address 1404 Mission Hills City College Station Phone Number 979.218.5664. PROPERTY OWNER'S INFORMATION: Name JCC Trinity Properties, LLC Street Address 1605 Rock Prairie Road, Suite 216 City College Station Phone Number 979.693.8037 State TX Zip Code 77845 Fax Number 979.690.7545 State TX E-mail joy. cashion@verizon.net Zip Code 77845 Fax Number 979-693.9384 10/09 Page 1 of 9 ARCHITECT OR ENGINEER'S INFORMATION: Name Hade Engineering Company - Joe Schultz, P.E. Street Address 3002 Texas Ave. South City College Station Phone Number 979.693.7191 OTHER CONTACTS (Please specify type of contact): Name R. L. Payne & Associates Street Address 1509 Emerald Pkwy City College Station Phone Number 979.696.7272 Current zoning C-1 Present use of property Proposed use of property Dental Office E-mail joeschultz84@veiizon.net State Texas Zip Code 77845 Fax Number 979.693.7191 E-mail Mmikeska@r/payne.com State Texas Zip Code 77845 Fax Number 979.696.8114 Number of parking spaces required 12 Number of parking spaces proposed 23 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? F- Yes V No MULTI -FAMILY RESIDENTIAL Total Acreage Floodplain Acreage Housing Units # of 1 Bedroom Units # of 2 Bedroom Units # of 3 Bedroom Units # of 4 Bedroom Units PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) # of Multi -Family Dwelling Units X$1646=$ # of acres in floodplain # of acres in detention # of acres in greenways Date dedication approved by Parks & Recreation Advisory Board COMMERCIAL FOR 2 BEDROOM UNITS ONLY # Bedrooms = 132 sq. ft. Total Acreage .573 Building Square Feet 2,831 # Bedrooms < 132 sq. ft. Floodplain Acreage 0 * Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. Signature and title t & �`� S Date w. 10109 Page 2 of 9 GENERAL PROVISIONS FOR DEVELOPMENT PERMIT 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re -issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no work is commenced within 24 months of issuance. 6. Applicant is hereby informed that other permits may be required to fulfill local, state, and federal regulator requirements. 7. Applicant hereby gives consent to the City representatives to make reasonable inspections required to verify compliance. 8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 9. I, THE OWNER, CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. vP t6l�lo Prope er(s) Date ACKNOWLEDGMENTS (required for all develoomentl- 1. I, Joy io-s��o� rT JCI.Zf" the ownerereby knowledge oraffirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. v P Ja IG �i Proper�y r(s) Date I J cc P r l-LL prior to 'construction. certify that all necessary State and Federal permits will be obtained Date 3. I, Jy I l t�f� ci Ki the Owner, authorize release of plans to a� o u i for bidding purposes only. I understand that final approval and release of plans for construction is contingent on contractor signature on approved Development Permit. 16111 Ivq Date 1 ofo9 Page 2 of 9 ENGINEERING CERTIFICATIONS (required for development in Special Flood Hazard Areas): A. I, certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date B. 1, certify that the finished floor elevation of the lowest floor including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and map, as amended. Engineer t i f Date r C. 1, ose P 1.T2 wle !r^q Co- J c do certify that the alterations qt72q ent cLred by this permit shall not diminish he flood -carrying capacity of the waterway adjoining o i itted site and that such alterations or development are consistent with requirements of the Ci featlo Code, Chapter 13 P q �{ P concernin encroachments of floodways and of floodway fringes. A* ?° 1.„ C® dJOSEP.... SC......Z4�� sec Engineer Date/STEP`:'p N�'oivs�g D. I, certify that the proposed alterations do not raise the level of the 100-year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval: Page 3 of 9 10/09 Proposed Site Plan for A New Office Building for Cashion Dental Project location: Lick Creek Subdivision, Phase 1, Lot3, Block 1 Intersection of Bridle Gate Drive and SH 6 West Frontage Road Current Land Use —Vacant Current Peak Hour Vehicle Trips-0 Projected Peak Hour Vehicle Trips per Use: C-1 Zoning 3.75 trips/KSF 2,813 SF x 3.75 Trips per KSF = 11 Vehicle Trips Building Plat, Lots 1R, 2 and 3—19,724 SF 19,724.SF x 3.75 Trips per KSF = 74 Vehicle Trips 74 Vehicle Trips < 150 Vehicle Trips TIA not required 06' ` �I