Loading...
HomeMy WebLinkAboutStaff Commentsrs(uL�r 4 S�`-—,a;,iA CITY OF COIJJfiGE ST':YI7ON Home of Tex&f eUW Onaevrdry° 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 7, 2009 // TO: Mark R. Johnson, Bury + Partners; via fax 210-525-0529✓ f -7-ci FROM: Molly Hitchcock, AICP Planning Administrator SUBJECT: HEB #2 (SP) I reviewed the above -mentioned site plan/development permit/non-residential architectural standards application turned in for the October 7, 2009 deadline and determined it to be incomplete. The following is the preliminary item needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: A Traffic Impact Analysis. I understand that this is to come under separate cover, but it has not yet been submitted. Please be aware that if this application is not completed before November 23, 2009, it will expire and a new application and fees will be necessary to continue the site planning process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Mike Coontz, Weiner Development; via fax 713-623-0178 Ae-d 1 u-1 c1 Kurt Vanderwalle/HEB Grocery Co; via fax 210-938-8091 U 10-1-0 Kathy Strimple PE/HEB Grocery Co; via fax 210-938-8091 1✓41:J ta-7. Case file No. 09-00500206 Case file No. 09-00500207 Case file No. 09-10500057 b Crrl or Cojj'a.cj. Sr: rlor Hone of7exusA&V Onive,sig' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 12, 2009 TO: Mark R. Johnson, Bury + Partners; via fax 210-525-05294 FROM: Jason Schubert, AICP Senior Planner SUBJECT: HEB #2 (SP) Thank you for your submittal of the Traffic Impact Analysis, which completes the above - mentioned site plan / development permit / non-residential architectural standards applications. This project met the October 7, 2009 submittal deadline and will be distributed to staff this week for their review. cc: Mike Coontz, Weiner Development; via fax 713-623-01788i� Kurt Vanderwalle/HEB Grocery Co; via fax 210-938-8091 Kathy Strimple PE/HEB Grocery Co; via fax 210-938-8091w tZ-or-1 Case file No. 09-00500206 Case file No. 09-00500207 Case file No. 09-10500057 (Wor� CiTvor• Corj�:,cE,'SamoH e—, fv A&M v h.Y• October 23, 2009 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: Mark R. Johnson, Bury + Partners; via fax 210-525-0529 v/ L K FROM: Lauren A. Hovde, Staff Planner SUBJECT: HEB #2 (SP)- Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Cover memo providing written responses to all of staffs comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Revised TIA; Four (4) revised site plans; One (1) landscaping plan; One (1) revised erosion control plan; Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact me at 979.764.3570. Attachments: Staff review comments PC: Mike Coontz, Weiner Development; via fax 713-623-0178 V GN Kurt Vanderwalle/HEB Grocery Co; via fax 210-938-8091 ✓ Kathy Strimple PE/HEB Grocery Co; via fax 210-938-8091 ✓ 41 i Case file #09-00500206 STAFF REVIEW COMMENTS NO. 1 Project: HEB #2 (SP) — 09-00500206 7PL/jNNING The newly submitted Tower Point Preliminary Plat and Tower Point Phase 3 Final Plat must be approved by the Planning and Zoning Commission prior to. site plan approval. Those items are anticipated to be going together to P&Z on November 19. 0hank you for showing the conceptual plan of future improvement on the first site plan submittal. To simplify the finished site plan, please remove any improvements not associated with this site plan on the next submittal. Thank you. Please draw a phase line that is 20' from any new improvement associated with this site plan. Driveway/drive aisles that are not contained within a parking area must be curbed on both 17 sides. Please revise the site plan to reflect this requirementl v * L5K Please label the off -site private access easement as P�onstructed by Developer". 6 A 10' sidewalk is required on the north and south si ree wells are required along 15% of the linear front of both facades and should include at least one canopy tree of a minimum 2.5" caliper every 6' in length. Please show this information on the site plan. )) When the required 5' sidewalks cross a driveway or drive, the pedestrian crossing area should be stamped/dyed concrete or pavers instead of being painted stripes. Please add periodic pedestrian crossing to connect to future businesses across the private access easement off of Hwy 6. Thank you. Nk& 'N CJ^oEL C hnvt 6�k<5Lc Please include the square footage of the fueling area canopy. 1W This is considered a shopping center and therefore has a parking ratio of 1:250. This minimum requirement is being met, but please revise the parking calculations. Is the round area at the north e d of the parking area intended to be the 500 SF plaza? It looks like there is a wa ature, benches, and a decorative wall. This is just an assumption. If it is intended to serve this purpose, please label the area and the individual ualifying features. 1/1ll parking islands must be 180 SF with a 6" curb around it. Several of the parking rows do not meet this requirement. In addition, the parking island near the front door is not 180 SF. Please revise. (E25)The dashed line for the fire lane is a little confusing. Is this intended to be the boundary of the fire lane -built concrete? If so, the fire lane for this building, if more than 30' in height, is 26' in width. c O' i v\ MW --13) Please identify the square at the northeast corner of the property. — 14) There are numerous areas that are not labeled or easily identifiable, particularly at the rear of the building. Please see the word "what" on the attached copy of the site plan and indentify these area on the next submittal. Thank you. 15) Please indentify what screening material is being referenced in Note 16 and the fence material being referenced in Note 3. 'y10� ON e V�o'h.S Please indentify on the site plan which parking concept from Section 7.9 of the UDO is being utilized in this plan. When parking island square footage is dimensioned, Staff will be able to determine if the island requirement is being satisfied. Page 2 of 9 07' There are two fire hydrants that appear to be in an awkward position. One can be found in the middle of the sidewalk on the north side of the building closer to the carwash. The other is behind the main building but is set back way from the fire lane. Please reposition these two hydrants. 18 The outdoor storage area in the rear must be screened 100% from view with a fence or wall of at least 6' and not greater than 8' in height. It is understood that screening from the right- of-way is difficult, and this will be taken into consideration w en reviewing your next submittal detailing the intended screening method. r10 vkkkG Commercial driveway approaches must be a minimum of 24' in width. Several of the driveways shown on the site plan are 20' in width. Please revise. Staff was unable to locate the dumpster area. Please label and dimension the specified area. In addition, please identify what screening method is being proposed around the dumpster. The dumpster enclosure should match the building. Thank you. JYrrSI Con^?4c-ft)rS Please add the street light symbol to the legend. �Is the shape in front of the fueling canopy intended to represent the gasoline storage tanks? ? Isso, please clarify that they will be below grade. the carwash building a place that the customers will be able to enter to pay for services? There is not a door being shown; however, the building appears larger than what was constructed at the HEB at Holleman and Texas Avenue. 24) Please label the following on the site plan: -,aYall setbacks, including those associated with the fuel sales area as found in Section 6.3.G.8, ® all fire lanes, which should be 26' in width, cr'the property owner of abutting lots (a all easements with their volume and page number, building height, carwash pay box (if applicable). 25) Please add the following items to the site plan: vicinity map with Arrington Road displayed, -- b) FEMA floodplain note, ! -= (W curb detail, @ pavement detail, OWN-4 LW bicycle rack detail. 26) Please add the following items to the title block: — a<legal description of the property, including any lot being affected by this site plan, Owner's name, phone number, and address, �KArchitect's name, phone number, and address. Please dimension the following items on the site plan: throat depth of each driveway (including parking area drives), drive aisle widths (parking drive aisles are already dimensioned, iPY'leach parking island square footage, Or"Parking spaces, 0 cart storage areas, , 1,V outdoor display/sales area square footage, J)' outdoor storage area in rear, Private Access Easements as shown on the Final Plat, ;ghts-of-way width (Hwy 6 and Hwy 40), �Odistance to nearest to Arrington Road and intersection of Hwy 6 and Hwy 40 for both connections on the highways. t24 FYI ... A TxDOT permit is required for connections to Highway 6 and 40. Since both highways have a speed limit over 50 miles/hour, deceleration lanes are needed for both connections. There should be a curb around the queuing and parking spaces at the carwash. 29 Please identify the exact area and square footage of the outdoor sales area on the site plan. Merchandise may be stored or displayed on site for sale to customers. Permanent outdoor sales areas shall be enclosed by a minimum six-foot screen or wall. Such areas shall not exceed 2,500 square feet or ten percent (10%) of the total site area, whichever is less. Permanent areas open to the public for the display and/or sale' �of merchandise must be included in parking requirement calculations. P1QQ p� y�0 Are the the private access easements intended to be only 20' in width? The queuing spaces at the pharmacy must be 10.5' in width. V32'A 12' bypass lane needs to be provided for the pharmacy drive-thru. The bypass lane can bump out around the outside lane and then connect back to it on the other side of the pick- up station. 13319ending machines and ice machines cannot be freestanding at the fueling area. They must be enclosed within a building. 3 A carwash and Fueling Area Plan is referenced on the site plan, but Staff was unable to locate it. Curbing needs to be constructed along the property edge abutting the parking spaces. —3& Please provide a detail of the retaining wall. The wall should be screened or treated to replicate. stone or brick. 3 Please revise the carwash lane to be 15' in width to accommodate one-way traffic. WThe north arrow on the site plan does not appear point to true north. Please revise. ease add a note stating, "Phase 3 and Phase 7 of the Tower Point Subdivision are considered one building plot. This building plot must comply with standards found in Section 7.9 of the Unified Development Ordinance pertaining to building plots over 150,000 square feet or greater." 40 Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. &Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 42) Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. 43) The Final Plat for Phase 3 has not been reviewed and may result is additional comments. Reviewed by: Lauren A. Hovde, Staff Planner Date: October 21, 2009 I recommend scheduling a meeting to discuss these comments prior to the second submittal. LA N DS CA P I N GISTRE ETSCAPI N GIB U F F E R 1. Landscaping calculations should be based on the total land area being developed with this site plan, including the private access easements being constructed. 2. A 10' sidewalk is required on the north and south side. Tree wells are required along 15% of the linear front of both facades and should include at least one canopy tree of a minimum 2.5" caliper ever 6' in length. 3. Lot 12 does not have frontage on Hwy 40; therefore, street streets are not required. 4. Are the selected trees appropriate for the sloped area in the rear? 5. Please add the following items to the title block: a) legal description of the property, including any lot being affected by this site plan, b) Owner's name, phone number, and address, c) Architect's name, phone number, and address. 6. Please add a note that non -canopy trees will be measured 12" from grade on a single cane. 7. Though none is being shown on the landscape plan, be aware that loose rock is not an approved groundcover. Reviewed by: Lauren A. Hovde, Staff Planner Date: October 21, 2009 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. TXDOT Access driveways to SH 6 & SH 40 must meet TxDOT's current "Regulations for Access Driveways to State Highways". Regulations are "primarily" based on posted speed limits and distances between proposed & adjacent access points. Where the posted speed limit is 50 MPH or greater the required minimum spacing between access points is 425% @ 45 MPH spacing is 360'; @ 40 MPH spacing is 305'. Where access spacing is insufficient joint access will be required or access to internal/external streets. Any proposed Access driveways should take into account the location of the ramps along the west ROW of SH 6 & the section of controlled access along the north ROW of SH 40. Appropriate data, including drainage will be required for any future work/permits in the ROW @ this development site. Reviewed by: Karl Nelson Date: October 16, 2009 ENGINEERING COMMENTS NO. 1 1. Sh.C1.0 — It appears that some of the erosion control measures are being duplicated by this HEB and Tower Point Ph. 3. 2. Sh.C1.0 —Where are the construction exits? 3. Sh.C1.1 — Detail A3 should specify ASTM D448 on Note #1, a minimum width of 12-ft on Note #4, and a Geotextile Fabric beneath the stone on the profile (please see City Std. Details — Sheet SWPP1). 4. Sh.C2.0 — Water, sanitary sewer, and storm sewer lines need to be shown on the site plan. More detail can be provided on Sheet C3.0, but they need to at least be shown on the site plan. 5. Sh.C2.0 — Key Notes #13 and #14 should both be Public Utility Easements. 6. Sh.C2.0 — For clarity, a written label should be added to delineate where the PUEs are located. 7. Sh.C2.0 — Please add a Floodplain Information note to this sheet as well. 8. Sh.C2.0 — Please add a note stating that this development is within the Spring Creek Sanitary Sewer Impact Fee Area. FYI ... These fees are due at time of Building Permit issuance. 9. Sh.C2.0 — Please verify that the fire lane continues around the building since the FDC needs to be next to the fire lane. 10. Sh.C2.0 — Please include water and sanitary sewer minimum, average, and peak demands on the site plan as well. 11. Sh.C3.0 — Please continue to coordinate the location of utilities with WP Moore. 12. Sh.C3.0 — Please provide flowline information for the sanitary sewer tie-ins. 13. Sh.C3.0 — Please label water, sanitary, and storm sewer lines with length, size, material, and slope, if not already included. 14. Please label access drives to SH6 Frontage Rd. and Hwy. 40 as being built by others. 15. FYI ...The development permit documents for Tower Point Ph.3 are still under review and may affect the site plan. 16. In addition to the following standard comments, if more than 5 acres will be disturbed during construction of this project a NOI must be filed with the state and a copy provided to the CoCS. Storm water management requirements are as follows, any questions may be directed to Donnie Willis, CoCS Drainage Inspector, at 979-764-6375: Storm Water Discharges from Small Construction Activities The Texas Commission on Environmental Quality has issued a general permit for construction activities under the Texas Pollution Discharge Elimination System. The general permit (TXR150000) is for construction activities disturbing at least 1 but less than 5 acres or is part of a common plan of development disturbing at least 1 but less than 5 acres. You will need to follow these steps to discharge storm water from your construction site to the City of College Station's Municipal Separate Storm Water Sewer System (MS4): 1. Read the general permit (TXR150000) to make sure it applies to your situation. 2. Adhere to the requirements of the general permit (TXR150000). 3. Prepare and implement a Storm Water Pollution Prevention Plan in accordance with Part 111 of the general permit (TXR150000). 4. Sign and post a construction site notice. 5. At least 2 days before beginning construction, provide a copy of the site notice to the operator of any Municipal Separate Storm Water Sewer System (MS4) into which storm water will be discharged. A MS4s include streets, channels, gutters, ditches or anything else that is publicly owned, designed or used to collect or transport storm water. As long as you meet the conditions of this general permit, you are authorized to discharge storm water. No notice of intent (NOI), notice of termination (NOT), or fee is required under this option —as long as the requirements of this general permit are followed. This particular general permit will expire at midnight on March 5, 2008. A copy of General Permit TXR150000 can be obtained from TCEQ at.- h ttp/www. tceq. state. U. us/assets/publis/permitting/waterquality/attachments/storm water/txr150000. pdf A copy of the construction site notice can be obtained from TCEQ at. http/www. tceq. state. tx. us/assets/publis/permitting/waterquality/attachments/stormwater/txr152d2. pdf Reviewed by: Erika Bridges Date: 10/23/09 TRANSPORTATION 1. First Paragraph in the Executive Summary page i, describes the HEB build out as 88,000 SF, earlier site plan submissions illustrated an expansion on either side of the HEB of approximately another 20,000 SF. TIA should include total build out including future expansion. 2. Last Paragraph in the Executive Summary page i, concerning the intersection of Arrington and SH 40 `The signalization of the intersection is considered sufficient and appropriate mitigation for the anticipated conditions." The City has programmed the signal and is under design and will be in place before HEB build -out. 3. Table 4 page 20 the Supermarket AM Peak Gross Trips are wrong. Based on ITE generation rates for land use 850, am peak hour average generation rate is 10.05 per 1000 sq ft with 49% entering and 51 % exiting this produces 433 trips exiting and 451 trips entering.The Gas Station trips rates are also wrong. The rates on Table 4 are based on 14 pump stations, the ITE rates are based on fueling positions. So you would have 28 fueling positions. The trips on Table 4 should be doubled. 4. Based on observed field conditions at SH 40 and SH 6 the SYNCHRO output sheet in the appendix Tab 1 for the existing conditions am peak hour is in question. More specifically the column for EBL; the output data sheet illustrates this movement as LOS A, field conditions say otherwise. The storage length was left off the analysis. A storage length of 410 per lane should be used. Based on observed field conditions the queue at these two storage lanes were at capacity in the am peak period for each signal phase with the queue spilling on to the through lanes on SH 40. 5. Rerun analysis with corrected data inputs. Did the analysis include traffic utilization of alternative routes more specifically Barron Rd after the completion of the overpass at SH6? 6. The mitigation solution of optimizing the signals for the intersection of SH 40 and SH 6 for the three movements that are failing should be modeled to illustrate the intersection LOS to be D or better after the mitigation. The optimizing of the signals at the intersection will not do anything to address to queuing at the SH 6 SB to SH 6 NB turnaround. Furthermore it is anticipated that traffic coming out of the development will use the turnaround to go northbound. 7. Include language in TIA report that describes the Unified Development Ordinance right turn deceleration construction requirement at each driveway based on 50 trip generation per the peak hour or 25 trip generation per peak hour based on 40 mph. Reviewed by: Joe Guerra, Transportation Planning Coordinator Date: 10/16/2009 FIRE 1) Show two Knox Box locations at the front and back of the building. The front location should be near the front main entrance and the back near an entrance door. 2) Any gates, fencing or secure areas will need a Knox Pad Lock. 3) Knox F.D.C. caps are required. Reviewed by: Steve Smith Date: 10/14/09 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines (where applicable, including street lights). 2. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: gmartinez@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 10.16.2009 SANITATION 1 _ 1. Sanitation is okwith this project. �(��Ck'l 6v- W1 `rush 'bo-' i4D✓ Reviewed by: Wally Urrutia Date: October 13, 2009 1101 Texas Avenue,P.O. Box 9960 College Station,,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CUYOP COTJE,G8 STATION HomeA&MUniiiersiry MEMORANDUM November 20, 2009 TO: Mark R. Johnson, Bury + Partners; via fax 210-525-0529 FROM: Lauren Hovde, Staff Planner SUBJECT: Heb #2 (Sp) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $668 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Eight (8) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Four (4) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Mike Coontz, Weiner Development; via fax 713-623-0178 Kurt Vanderwalle/HEB Grocery Cc; via fax 210-938-8091 Kathy_Strimple PE/HEB Grocery Cc; via fax 210-938-8091 Case file #09-00500206 STAFF REVIEW COMMENTS NO.2 Project: Heb #2 (SP) - 09-00500206 PLANNING VIf Since the HEB site is being expanded to include the neighboring retail. Please label these plans for HEB as Phase I. LX Please clarify why the phase line bumps out along the drive aisle to the south of the main building. LY The pedestrian crossing to connect to future businesses across the private access easement off of Hwy 6 must be shown on the site plan. The construction of those crosswalks can be decided between HEB and the developer of Tower Point. The crosswalks are required for pedestrian connectivity which was a condition of the plat and can also be found in Section 7.9.E.4. There should be a crosswalk on either side of the four-way stop next to the 500 SF plaza and across the drive that enter the HEB site in that area. There should also be one at each private access easement connecting to the main private drive coming off Hwy 6 frontage. In addition, a 5' paved path needs to be provided to lead to those crosswalks. This pathway can extend along the edge of the parking islands against the drive. An exhibit of this comment is attached. �} Please include the square footage of the carwash as part of the total site building square footage. �5t During a previous discussion, it was agreed that a 26' wide fire lane would be provided at the rear of the building. Please clarify. At least 26' must be provided at the hydrant at the rear as per IFC 2006. �j Chain link is not an acceptable fencing or screening material. Please revise Note 31. 7) What type of screening material is being used for the employee area on the north side of the building? I,81 Note 15 refers to the architectural plans, however, this EFIS wall is shown as plaster and stone on the fagade elevations. -- 9) The outdoor storage area in the rear must be screened 100% from view with a fence or wall of at least 6' and not greater than 8' in height. It is understood that screening from the right- of-way is difficult, and this will be taken into consideration when reviewing your next submittal detailing the intended screening method. ,/Is the gasoline storage tank below grade? LIAI'The firewall between the main building and the future retail has been removed. Are the 'moldings proposed to be separated? here must be a 3' clear space between the bike racks and the building. L"SJ Please indentify the rounded area next to the car war. Is this just a paved area? --44) Please revise the main drive coming off of Hwy 6 to be 26' wide. This was revised by the developer. All drive aisles being constructed with the HEB site need to be shown and dimensioned on the site plan. This includes drives that are off -site. 15) Before the site plan can be approved, the easements need to be revised to show the volume and page number provided from the filing of the final plat. 'tKPlease,label each structure with its height. 17) The Final Plat for Tower Point Phase 3 states that this property does not lie within a floodplain. Please explain the floodplain note on the site plan stating the opposite. 18) Please provide a detail of the stamped concrete crosswalks including profile drawing and treatment method and color. T" 19) Permanent outdoor sales areas shall be enclosed by a minimum six-foot screen or wall. Such areas shall not exceed 2,500 square feet or ten percent (10%) of the total site area, whichever is less. Permanent areas open to the public for the display and/or sale of merchandise must be included in parking requirement calculations. t,AO) The queuing spaces at the pharmacy must be 10.5' in width. The outside lane is still 9' wide. If it is HEB's preference to not show off -site drives on the site plan, please add a note stating that details for off -site drives may be found in the construction documents for Tower Point Phase 3. The 500 SF plaza has structural seating and a raised planter bed. One additional element should be added such as a shade tree or a decorative railing. See Section 7.9.F.1. 23) Should the knox box on the front fagade have an "18" by it like the back fagade? �ny gates, fencing, or secure areas will need a Knox Pad Lock. Note 10 does not refer to VrT ,ffils as stated in the response to staff comment. ) Efforts must be made to screen from the right -of way. At this time, there are several areas that are not being adequately screened such as the trash compactor, outdoor storage, and the ice freezer. Please provide a general note on the site plan that all roof and ground - mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and °bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Lauren A. Hovde, Staff Planner Date: November 18, 2009 LAN DSCAPI NG/STREETSCAPI NG/BUFFER .-O/Please revise the plant schedule to show the total points as 36,550. X. The parking calculation needs to be revised to show 489 spaces. Reviewed by: Lauren A. Hovde, Staff Planner Date: November 19, 2009 ENGINEERING COMMENTS NO. 2 1. Please submit a specific PUEs or a blanket PUE for onsite easements. Blanket PUE will need to be filed prior to site plan approval and specific PUEs dedicated prior to issuance of CO. 2. Please submit a Letter of Acknowledgment of City Standards. 3. C2.0/3.0 — Please show the location of the water meter for the main building. 4. C2.0/3.0 — Locations of some utilities and retaining wall being built by the developer have changed. Please coordinate with Walter P. Moore to revise. 5. C2.0/3.0 — The width of the western access drive has changed. Please coordinate with Walter P. Moore to revise. 6. C2.0/3.0 — Please move water meters to unpaved areas within PUEs. 7. C2.0/3.0 —Please show and label irrigation meter within PUE. 8. C2.0/3.0 — Please add a note stating that the fire suppression line shall have a lockable lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by College Station Utilities Director or his designee. 9. C3.0 —An isolation valve within the PUE is required on the fire line, not a gate valve. 10. C3.0 — One length of sanitary sewer line is labeled 6-inch and 8-inch. Please clarify what size the line will be. Reviewed by: Erika Bridges Date: 11/17/09 *� 1 1101 Texas Avenue,P.O. Box 9960 College Station,,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COU A.GI ( STATION H",rT Ad,WUw" °' MEMORANDUM January 15, 2010 TO: Mark R. Johnson, Bury + Partners; via fax 21-0-525-0529 _ FROM: Lauren Hovde, Staff Planner SUBJECT: HEB #2 (SP) - Site Plan Review 3 Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $668 processing fee for the next round of three (3) staff reviews Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Four (4) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Mike Coontz, Weiner Development; via fax 713-623-0178 Kurt Vanderwalle/HEB Grocery Go; via fax 210-938-8091 Kathy Strimple PE/HEB Grocery Co; via fax 210-938-8091 Case file #09-00500206 STAFF REVIEW COMMENTS NO.3 Project: HEB #2 (SP) - 09-00500206 PLANNING 1. Please identify the height of the cedar screening fence at the rear of the main building. 2. The phase line should be 20' from any improvements, including the parking spaces that extend off the property. 3. The private road coming off of Highway 6 is not shown to be 26' wide as proposed by the developer. 4. There should be a pedestrian ramp on the south side of the intersection where the 500 SF plaza was previously proposed. 5. Easements must be labeled with their volume and page number for site plan approval. 6. #37 is not labeled on the plan. Please revise. 7. Please revise the curb details to show a 6" monolithic curb, as required by City standards. 8. There does not appear to be a stop sign at the exit point on the drive used for the fuel station or the main HEB loop. 9. Please identify what material is used for the Base Course shown in the Pavement Section detail. 10. A couple minor changes to the text include: The zoning is actually C-1 and OV. Also, lots 14 and 15 are in Phase 7, not Phase 3 as shown. 11. Though the parking lot light pole positions are conceptual, please show the pole being placed at one side or the other of the pedestrian path. It is currently shown in the center, which would interfere with a clear 5' path. Thank you. 12. There are 63 spaces, not 64, in the parking row to the northwest of the one with the pedestrian path. This gives you 479 spaces total. 13. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Lauren Hovde, Staff Planner Date: January 11, 2010 ENGINEERING COMMENTS NO. 3 1. As a reminder, the Blanket PUE which was submitted for the site will need to be filed prior to site plan approval and specific PUEs dedicated prior to issuance of CO. 2. Please provide a fire flow letter stating required fire flows necessary to serve this building per the International Fire Cade, and thus verifying that the proposed fire hydrants will adequately serve the development. 3. C2.0 — In accordance with our Site Design Standards, Key%Note #2 needs to specify red painted curbs and curb ends with 4-inch white lettering stating "FIRE LANE - NO PARKING — TOW AWAY ZONE." The wording may be spaced no more than 15-ft apart. 4. C3.0 — The water lines need to be at least 5.5-ft from centerline to the edge of the PUE. 5. C3.0 — Water meters or isolation valves need to be set at the edge of the PUE, as water service, irrigation, and fire suppression lines are required to be privately maintained. 6. C2.0/C3.0 — The Water and Wastewater Calculations state "90 persons per acre" rather than 30 persons per acre. Reviewed by: Erika Bridges Date: 1114/10 r P Bury+Partners E N G IN E E R ING 5 0 L U T I ON 5 November 9, 2009 Ms. Lauren A. Hovde Staff Planner City of College Station 1101 Texas Avenue P.O. Box 9960 College Station, Texas 77842 Re: HEB #2 (SP) - Site Plan Responses to Staff Review Comments No. 1 Dear Ms. Hovde: Project No.: 50001-504.10 This letter is in response to comments received via fax dated October 23, 2009. The responses are in the order in which the comments were received. PLANNING: 1. Comment: The newly submitted Tower Point Preliminary Plat and Tower Point Phase 3 Final Plat must be approved by the Planning and Zoning Commission prior to site plan approval. Those items are anticipated to be going together to P&Z on November 19. Response: Acknowledged. We have updated our plans to reflect the Final Tower Point Phase 3 Plat as provided by the Kling Engineering & Survey. 2. Comment: Thank you for showing the conceptual plan of future improvement on the first site plan submittal. To simplify the finished site plan, please remove any improvements not associated with this site plan on the next submittal. Thank you. Response: Improvements outside Lot 12 have been removed from the plans as requested. Note that the plans reflect the Developer's infrastructure improvements as provided and coordinated with Walter P. Moore & Associates (WPMA). 3. Comment: Please draw a phase line that is 20' from any new improvement associated with this site plan. BURY+PARTNERS-SA, INC. 922 Isom Road, Suite 100 San Antonio, Texas 78216 (210( 525-9090 rnx (210) 525-0529 Austin • Dallas • Houston • San Antonio • Temple, Texas Fairfax • Williamsburg, Virginia w .buryportnersxom Ms. Lauren A. Hovde Bury+Partners November 9, 2009 ENGINEERING SOLUTIONS Page Response: As phase line has been provided as requested. Please refer to Sheet C2.0 for depiction of the phase line. 4. Comment: Driveway/drive aisles that are not contained within a parking area must be curbed on both sides. Please revise the site plan to reflect this requirement. Response: Curbing has been provided at the driveway/drive aisles including curbing at parking areas. Specifically, curbing has been provided at the Fuel Station Car Wash parking area. Please refer to Sheet C2.0. 5. Comment: Please label the off -site private access easement as "�Constructed by Developer". Response: The offsite private access and utility easements have been shown and labeled accordingly as requested. Refer to Site Plan, Sheet C2.0, and relevant plan sheets. 6. Comment: A 10' sidewalk is required on the north and south side. Tree wells are required along 15% of the linear front of both facades and should include at least one canopy tree of a minimum 2.5" caliper every 6' in length. Please show this information on the site plan. Response: A 10' wide sidewalk has been provided along the north side of the building including tree wells as required by Code. The information is now shown on the Site Plan, Sheet C2.0, as requested and additional specifications are found within the Landscape Plans, LS1 and LS2. Provision of the facade walk along the southern side will not be provided based upon the projected retail development on Lot 13C and as discussed with City staff prior to the retail submittal. 7. Comment: When the required 5' sidewalks cross a driveway or drive, the pedestrial crossing area should be stamped/dyed concrete or pavers instead of being painted stripes. Please add periodic pedestrian crossing to connect to future businesses across the private access easement off of Highway 6. Thank you. Response: A 5' wide stamped/dyed concrete walk will be provided at the drive pedestrian crossings as requested. Additional pedestrian crossings will be provided by the Developer as future retail site are developed. Please refer to Sheet C2.0 for depiction of the enhanced pedestrian walkways (Key Note 24). S. Comment: Please include the square footage of the fueling area canopy. Response: The Canopy Square Footage has been added to the zoning tabulations as requested. Please refer to the Site Plan, Sheet C2.0. Ms. Lauren A. Hovde Bury+Partners November 9, 2009 ENGINEERING SOLUTION5 Page 9. Comment: This is considered a shopping center and therefore has a parking ratio of 1:250. This minimum requirement is being met, but please revise the parking calculations. Response: The required parking ratio has been revised to reflect 1:250 as requested. Please refer to the parking tabulations on the Site Plan, Sheet C2.0. 10. Comment: Is the round area at the north end of the parking area intended to be the 500 SF plaza? It looks like there is a water feature, benches and a decorative wall. This is just an assumption. If it is intended to serve this purpose, please label the area and the individual qualifying features. Response: The round area is the public space plaza as noted. Note that a water feature is not planned for this area, but a detail including information and area tabulations of the space has been provided on Sheet C5.1 as requested. 11. Comment: All parking islands must be 180 SF with a 6" curb around it. Several of the parking rows do not meet this requirement. In addition, the parking island near the front door is not 180 SF. Please revise. Response: The parking islands have been revised to meet the 180 SF requirement. Area calculations for each island have been provided for reference. Refer to the Site Plan, Sheet C2.0. 12. Comment: The dashed line for the fire lane is a little confusing. Is this intended to be the boundary of the fire lane -built concrete? If so, the fire lane for this building, if more than 30' in height, is 26' in width. Response: The dashed and shaded lane represents the fire line throughout HEB property. A 26' wide fire lane has been provided along the store's front as required by Code, and a 20' wide lane within the remainder of the site per our discussions with staff from the Fire Marshalls Office. Note all drives and travel lanes within the property are 24' in width or greater. Refer to Sheet C2.0 for depiction of the fire lanes. 13. Comment: Please identify the square at the northeast corner of the property. Response: The square at the northeast corner represents the underground fuel storage tank for the Fuel Station. It has been labeled accordingly. Refer to Key Note 20 on Sheet C2.0. 14. Comment: There are numerous areas that are not labeled or easily identifiable, particularly at the rear of the building. Please see the word "what" on the attached copy of the site plan and identify these areas on the next submittal. Thank you. Ms. Lauren A. Hovde Bury -Partners November 9, 2009 ENGI N EERI NG SOLUTIONS Page Response: We have reviewed the provided Site Plan redline and added key notes to address the "what" comments from the plan sheet review. Refer to Sheet C2.0 for additional key notes and call outs. 15. Comment: Please identify what screening material is being referenced in Note 16 and the fence material being referenced in Note 3. Response: An EIFS screening wall will be used in place of Key Note 16 and 3 at the equipment yard, the southern loading dock, and at the trash compactor. Refer to the NRA Building Submittal and Key Note 15 on Sheet C2.0. 16. Comment: Please identify on the site plan which parking concept from Section 7.9 of the UDO is being utilized in this plan. When parking island square footage is dimensioned, Staff will be able to determine if the island requirement is being satisfied. Response: The site plan has been configured to meet the City's Concept C requirements per Section 7.9 of the UDO. The square footage area of each landscape island has been provided on Sheets C2.0, LSl and LS2 respectively. 17. Comment: There are two fire hydrants that appear to be in an awkward position. One can be found in the middle of the sidewalk on the north side of the building closer to the carwash. The other is behind the main building but is set back way from the fire lane. Please reposition these two hydrants. Response: The location and alignment of both hydrants have been revised as requested. Refer to Sheets C2.0 and C3.0 for the adjusted locations. 18. Comment: The outdoor storage area in the rear must be screened 100% from view with a fence or wall of at least 6' and not greater than 8' in height. It is understood that screening from the right-of-way is difficult, and this will be taken into consideration when reviewing your next submittal detailing the intended screening method. Response: The outdoor storage areas are enclosed by chain link fencing with screen material attached to provide opaqueness which obscures the equipment. Refer to the NRA Building Submittal Plans for additional information. 19. Comment: Commercial driveway approaches must be a minimum of 24' in width. Several of the driveways shown on the site plan are 20' in width. Please revise. Response: All drives meet the 24' minimum width requirements as required by code for the HEB Site. Drive aisles within the parking field meet the City's standards for 60 degree parking per UDO Section 7.9. Refer to the Site Plan, Sheet C2.0. Bury+Partners ENGI N EERI N G SOLUTIONS Ms. Lauren A. Hovde November 9, 2009 Page 5 20. Comment: Staff was unable to locate the dumpster area. Please label and dimension the specified area. In addition, please identify what screening method is being proposed around the dumpster. The dumpster enclosure should match the building. Thank you. Response: Two trash compactors are provided within the Southern Loading Dock Area and are identified on the Site Plan as requested. Note the compactors will be screened by an EIFS Wall Panel consistent with the building exterior. Refer to Key Note 19 on Sheet C2.0 and the Building Elevations. 21. Comment: Please add the street light symbol to the legend. Response: The Street Light Symbol was added to the legend as requested. Refer to Sheet C2.0. 22. Comment: Is the shape in front of the fueling canopy intended to represent the gasoline storage tanks? If so, please clarify that they will be below grade. Response: Correct. The underground fuel storage tank has been labeled as requested. Refer to Key Note 20 on Sheet C2.0. 23. Comment: Is the carwash building a place that the customers will be able to enter to pay for services? There is not a door being shown; however, the building appears larger than what was constructed at the HEB at Holleman and Texas Avenue. Response: The pay station to the car wash building has been labeled as requested. It is independent of the structure and identified by Key Note 21 on Sheet C2.0. 24. Comment: Please label the following on the site plan: a) all setbacks, including those associated with the fuel sales area as found in Section 6.3. G.8, b) all fire lanes, which should be 26' in width, c) the property owner of abutting lots d) all easements with their volume and page number, e) building height, fi. carwash pay box (if applicable). Response: a. Setbacks for the site and fuel sales area have been added. See Sheet C2.0. b. Fire lanes which meet Fire Marshall requirements are depicted on Sheet C2.0. C. Information regarding adjacent property owners has been included on Sheet C2.0. Ms. Lauren A. Hovde Bury+Partners November 9, 2009 ENGINEERING SOLUTION5 Page d. Easements have been updated per the final plat for Tower Point Phase 3 Subdivision. Deed book and pages have been included as requested. e. Building Heights are identified on the Architectural Drawings at this time. f. The pay station for the car wash is identified. See Key Note 21, Sheet C2.0. 25. Comment: Please add the following items to the site plan: a) vicinity map with Arrington Road displayed, b) FEMA floodplain note, c) curb detail, d) pavement detail, e) bicycle rack detail. Response: a. An updated Vicinity Map reflecting Arrington Road has been added to Sheet C2.0. b. Provided as requested. Refer to Sheet C2.0. C. Provided as requested. Refer to Sheet C2.0. d. Provided as requested. Refer to Sheet C2.0. e. Provided as requested. Refer to Sheet C2.0. 26. Comment: Please add the following items to the title block. a) Legal description of the property, including any lot being affected by this site plan, b) Owner's name, phone number and address, c) Architect's name, phone number and address. Please dimension the following items on the site plan: d) throat depth of each driveway (including parking area drives), e) drive aisle widths (parking drive aisles are already dimensioned), j) each parking island square footage, g) parking spaces, h) cart storage areas, i) outdoor display/sales area square footage, j) outdoor storage area in rear, k) Private Access Easements as shown on the Final Plat, 1) rights -of -way width (Hwy 6 and Hwy40), m) distance to nearest to Arrington Road and intersection of Hwy 6 and Hwy 40 for both connections on the highways. Response: a. The requested information has been provided on the plan sheet title block as requested. We do not anticipate any disturbance to adjacent properties. b. Provided as requested. Refer to Sheet C2.0. C. Provided as requested. Refer to Sheet C2.0. d. Provided as requested. Refer to Sheet C2.0. Ms. Lauren A. Hovde Bimy+Partners November 9, 2009 ENGI NEERI NG SOLUTIONS Pagel e. Provided as requested. Refer to Sheet C2.0. f. Provided as requested. Refer to Sheet C2.0. g. Provided as requested. Refer to Sheet C2.0. h. Cart storage areas's at the store front and within the parking field have been provided as requested. Refer to Key Notes 13 and 14 on Sheet C2.0. i. Temporary outdoor display/sales areas have been identified including square footage for each area as requested. HEB will request a City permit for permanent outdoor storage as required once the store is in operation. Refer to Sheet C2.0. j. Provided as requested. Refer to Sheet C2.0. k. Provided as requested. Refer to Sheet C2.0. 1. Right-of-way widths were omitted from this submittal and will be included on the final site plan for approval. in. Provided as requested. Refer to Sheet C2.0. 27. Comment: FYI - A TxDOT permit is required for connections to Highway 6 and 40. Since both highways have a speed limit over 50 miles/hour, deceleration lanes are needed for both connections. Response: Acknowledged. The Developer is coordinating the entrances as part of the infrastructure plans. 28. Comment: There should be a curb around the queuing and parking spaces at the carwash. Response: Provided as requested. Refer to Sheet C2.0. 29. Comment: Please identify the exact area and square footage of the outdoor sales area on the site plan. Merchandise maybe stored or displayed on site for sale to customers. Permanent outdoor sales areas shall be enclosed by a minimum six-foot screen or wall. Such areas shall not exceed 2,500 square feet or ten percent (10%) of the total site area, whichever is less. Permanent areas open to the public for the display and/or sale of merchandise must be included in parking requirement calculations. Response: Acknowledged. Temporary outdoor display/sales areas have been identified including square footage for each area as requested. HEB will request a City permit for permanent outdoor storage as required once the store is in operation. Refer to Sheet C2.0. 30. Comment: Are the private access easements intended to be only 20' in width? Response: The private access easements vary per final plat provided by WPMA. They ail exceed 20'in width. Ms. Lauren A. Hovde Bury -Partners November 9, 2009 ENGINEERING SOLUTION5 Page 31. Comment: The queuing spaces at the pharmacy must be 10.5' in width. Response: The queuing spaces within the pharmacy will be revised to meet the 10.5' minimum width required. This change will be reflected in the Building Permit Set. Refer to Sheet C2.0 for dimensioning of the pharmacy drive. 32. Comment. A 12' bypass lane needs to be provided for the pharmacy drive-thru. The bypass lane can bump out around the outside lane and then connect back to it on the other side of the pickup station. Response: Provided as requested. Refer to Sheet C2.0. 33. Comment: Vending machines and ice machines cannot be freestanding at the fueling area. They must be enclosed within a building. Response: Vending and ice machines have been removed from the submittal. Refer to Sheet C2.0. 34. Comment. A Carwash and Fueling Area Plan is referenced on the site plan, but Staff was unable to locate it. Response: A detail set of Fuel Station/Car Wash Plans will be submitted for Building Permit submittal after approval of the Site Plan/Development Permit. The note has been removed from Sheet C2.0. 35. Comment: Curbing needs to be constructed along the property edge abutting the parking spaces. Response: Provided as requested. Refer to Sheet C2.0. 36. Comment. Please provide a detail of the retaining wall. The wall should be screened or treated to replicate stone or brick. Response: Details of the retaining wall are provided in the Tower Point Infrastructure Plans. The Masonry wall will be provided and constructed by the Developer's General Contractor. 37. Comment: Please revise the carwash lane to be 15' in width to accommodate one-way traffic. Response: The car wash lane has been revised per discussions with City staff. An increase width at the throat and exit has been provided to accommodate vehicular access. Refer to Sheet C2.0. Ms. Lauren A. Hovde Bury+Partners November 9, 2009 ENGINEERING SOIUTION5 Page 38. Comment: The north arrow on the site plan does not appear point to true north. Please revise. Response: The orientation of north arrows has been corrected throughout the set. 39. Comment: Please add a note stating, "Phase 3 and Phase 7 of the Tower Point Subdivision are considered one building plot. This building plot must comply with standards found in Section 7.9 of the unified Development Ordinance pertaining to building plots over 150,000 square feet or grater. " Response: Note provided as requested. Refer to Note 7, Sheet C2.0. 40. Comment: Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Response: The note has not been provided based upon discussions with City staff and review of the Store Site Line Exhibits. It is our understanding that the existing site topography in combination with the distance of the roadway from the site will not require the need for roof top equipment screening. 41. Comment: Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. Response: The requested note has been provided on the Site Electrical Plan, Sheet E101 and will be included on the final site plan submittal. 42. Comment: Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Response: Two additional plan sheets have been included with the re -submittal. The plan sheets, C1.0 Existing Conditions Plan, and C4.1 Drainage Plan, are refinements of the original set and included information requested by City staff during review of the original Site Plan/Development Permit Submittal. The Existing Conditions Plans provide Ms. Lauren A. Hovde -� �a t Y°s November 9, 2009 ENGINEERING SOLUTIONS Page 10 development information including easements, roadwork and utilities. The Drainage Plan provides information regarding this development's private storm sewer system, drainage divides, and storm sewer calculations. Lastly, the detail sheets have been updated to reflect City of Bryan/City of College Station Standard Utility Details. 43. Comment: The Final Plat for Phase 3 has not been reviewed and may result is additional comments. Response: Acknowledged. LANDSCAPING/STREETSCAPING/BUFFER: 1. Comment: Landscaping calculations should be based on the total land area being developed with this site plan, including the private access easements being constructed. Response: The landscape calculations are based upon this lots area, approximately 12.42 acres per the Final Tower Point Phase 3 Subdivision Plat. 2. Comment: A 10' sidewalk is required on the north and south side. Tree wells are required along 15 % of the linear front of both facades and should include at least one canopy tree of a minimum 2.5" caliper ever 6' in length. Response: A 10' wide sidewalk has been provided along the north side of the building including tree wells as required by Code. The information is now shown on the Site Plan, Sheet C2.0, as requested and additional specifications are found within the Landscape Plans, LSl and LS2. Provision of the facade walk along the southern side will not be provided based upon the projected retail development on Lot 13C and as discussed with City Staff prior to the retail submittal. 3. Comment: Lot 12 does not have frontage on Highway 40; therefore, street streets are not required. Response: Acknowledged. The Landscape Plan has been revised accordingly. 4. Comment: Are the selected trees appropriate for the sloped area in the rear? Response: The Landscape Plan has been revised accordingly including the selection of tree's for the rear sloped area. Refer to sheet LSI and LS2. 5. Comment: Please add the following items to the title block: a) legal description of the property, including any lot being affected by this site plan, b) Owner's name, phone number, and address, c) Architect's name, phone number, and address. Ms. Lauren A. Hovde y+r rs November 9, 2009 E N G I N EERI NG SOLUTIONS Page 11 Response: a. Provided as requested. Refer to Sheets LS1 and LS2. b. Provided as requested. Refer to Sheets LS1 and LS2. C. Provided as requested. Refer to Sheets LSl and LS2. 6. Comment: Please add a note that non -canopy trees will be measured 12" from grade on a single cane. Response: Provided as requested. Refer to Sheets LS1 and LS2. 7. Comment: Though none is being shown on the landscape plan, be aware that loose rock is not an approved groundcover. Response: Acknowledged. HEB no longer utilizes loose rock as a ground cover in parking field area or where pedestrian access is anticipated. Miscellaneous 1. Comment: Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City ordinance 2394. Response: Provided as requested. Refer to Sheets IRl and IR2. 2. Comment: All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Response: Provided as requested. Refer to Sheets IRl and IR2. TxDOT Access driveways to SH 6 & SH 40 must meet TxDOT's current "Regulations for Access Driveways to State Highways". Regulations are `primarily" based on posted speed limits and distances between proposed & adjacent access points. Where the posted speed limit is 50 MPH or greater the required minimum spacing between access points is 425' @ 45 MPH spacing is 360', @ 40 MPH spacing is 305'. Where access spacing is insufficient joint access will be required or access to internal/external streets. Any proposed Access driveway should take into account the location of the ramps along the west ROW of SH 46 & the section of controlled access along the north ROW of SH 40. Appropriate data, including drainage will be required for any future work/permits in the ROW @ this development site. Ms. Lauren A. Hovde rt rs November 9, 2009 ENGI N EERI NG 50 LU TION 5 Page 12 Response: Acknowledged. entrance improvements will be addressed by Developer in the Tower Point Infrastructure Plans. Engineering Comments No. 1 1. Comment: Sh. CLO - It appears that some of the erosion control measures are being duplicated by this HEB and Tower Point Ph. 3. Response: HEB provides an Erosion Control Measures Plan as part of their construction protocol for store sites. The General Contractor for the store project is required to maintain these measures in the event the infrastructure improvements are completed at the associated E&S measures are no longer in effect. 2. Comment: Sh. C1.0 - Where are the construction exits? Response: Two construction entrance/exits are depicted on Sheet Cl.l. The entrance will meet City of College Station Criteria. 3. Comment: Sh. C1.1 - Detail A3 should specify ASTM D448 on Note #1, a minimum width of 12-ft on Note #4, and a Geotextile Fabric beneath the stone on the profile (please see City Std. Details - Sheet SWPP1). Response: The detail has been revised as requested and the entrance meets City of College Station Criteria. Refer to Detail A3/Sheet C1.2 4. Comment: Sh. C2.0 - Water, sanitary sewer, and storm sewer lines need to be shown on the site plan. More detail can be provided on Sheet C3.0, but they need to at least be shown on the site plan. Response: The utilities are shown on the site plan as requested. Refer to Sheet C2.0. 5. Comment: Sh. C2.0 - Key Notes #13 and #14 should both be Public Utility Easements. Response: The Public Utility Easements have been revised and are labeled on the Site and Utility Plans, Sheets C2.0 and C.3.0 as requested. 6. Comment: Sh. C2.0 - For clarity, a written label should be added to delineate where the PUEs are located. Response: The Public Utility Easements have been revised and are labeled on the Site and Utility Plans, Sheets C2.0 and C.3.0 as requested. Ms. Lauren A. Hovde y+rt err November 9, 2009 ENGI N EERI NG SOLUTIONS Page 13 7. Comment: Sh. C2.0 - Please add a Floodplain Information note to this sheet as well. Response: Provided as requested. See Sheet C2.0. 8. Comment: Sh. C2.0 - Please add a note stating that this development is within the Spring Creek Sanitary Sewer Impact Fee Area. FYI ... These fees are due at time of Building Permit issuance. Response: Provided as requested. See Sheet C2.0. 9. Comment: Sh. C2.0 - Please verify that the fire lane continues around the building since the FDC needs to be next to the fire lane. Response: The fire lane continues around the building. The FDC is located at the rear wall of the building to maintain the minimum separation between the FDC and Hydrant per IFC2006 requirements. Refer to Sheet C2.0 for depiction of the FDC, Hydrants, and fire lanes. 10. Comment: Sh. C2.0 - Please include water and sanitary sewer minimum, average, and peak demands on the site plan as well. Response: Provided as requested. See Sheet C2.0. 11. Comment: Sh. C3.0 - Please continue to coordinate the location of utilities with WP Moore. Response: Ackowiedged. 12. Comment: Sh. C3.0 - Please provide flowline information for the sanitary sewer tie-ins. Response: Provided as requested. See Sheet C3.0 for flow line information. 13. Comment: Sh. C3.0 - Please label water, sanitary, and storm sewer lines with length, size, material, and slope, if not already included. Response: Provided as requested. See Sheet C3.0 for the requested utility information. 14. Comment: Please label access drives to SH 6 Frontage Rd. and Hwy. 40 as being built by others. Response: Provided as requested. See Sheet C2.0. Ms. Lauren A. Hovde y- ar rS November 9, 2009 ENGINEERING SOLUTIONS Page 14 15. Comment: FYI ... The development permit documents for Tower Point Ph. 3 are still under review and may affect the site plan. Response: Acknowledged. 16. Comment: In addition to the following standard comments, if more than 5 acres will be disturbed during construction of this project a NOI must be filed with the state and a copy provided to the CoCS. Storm water management requirements are as follows, any questions may be directed to Donnie Willis, CoCS Drainage Inspector, at 979-764-6375: Storm Water Discharges from Small Construction Activities The Texas Commission on Environmental Quality has issued a general permit for construction activities under the Texas Pollution Discharge Elimination System. The general permit (TXR150000) is for construction activities disturbing at least 1 but less than 5 acres or is part of a common plan of development disturbing at least 1 but less than 5 acres. You will need to follow these steps to discharge storm water from your construction site to the City of College Station's Municipal Separate Storm Water Sewer System (MS4): 1. Read the general permit (TXR150000) to make sure it applies to your situation. 2. Adhere to the requirements of the general permit (TXR150000). 3. Prepare and implement a Storm Water Pollution Prevention Plan in accordance with Part III of the general permit (TXR150000). 4. Sign and post a construction site notice. 5. At least 2 days before beginning construction, provide a copy of the site notice to the operator of any Municipal Separate Storm Water Sewer System (MS4) into which storm water will be discharged. A MS4s include streets, channels, gutters, ditches or anything else that is publicly owned, designed or used to collect or transport storm water. As long as you meet the conditions of this general permit, you are authorized to discharge storm water. No notice of intent (NOI), notice of termination (NO7), or fee is required under this option - as long as the requirements of this general permit are followed. This particular general permit will expire at midnight on March 5, 2008. Ms. Lauren A. Hovde �I + a te s November 9, 2009 ENGINEERING SOLUTIONS Page 15 A copy of General Permit TXR150000 can be obtained from TCEQ at: hnp/www. tceq. state. tx. us/assets/public/permitting/waterquality/attachments/stormwater/txr152d2.pdf A copy of the construction site notice can be obtained from TCEQ at: http/www. tceq. state. tx. us/assets/public/permitting/waterquality/attachments/stormwater/txr152d2. pdf Response: Acknowledged. This information has been provided to the General Contractor for this project. TRANSPORTATION 1. Comment: First Paragraph in the Executive Summary page i, describes the HEB build out as 88, 000 SF, earlier site plan submissions illustrated an expansion on either side of the HEB of approximately another 20, 000 SF. TIA should include total build out including future expansion. Response: See response from WPMA under separate cover. 2. Comment: Last paragraph in the Executive Summary page i, concerning the intersection of Arrington and SH 40 "The signalization of the intersection is considered sufficient and appropriate mitigation for the anticipated conditions. " The City has programmed the signal and is under design and will be in place before HEB build -out. Response: See response from WPMA under separate cover. 3. Comment: Table 4 page 20 the Supermarket AM Peak Gross Trips are wrong. Based on ITE generation rates for land use 850, am peak hour average generation rate is 10.05 per 1000 sq ft with 49% entering and 51 % exiting this produces 433 trips exiting and 451 trips entering. The Gas Station trips rates are also wrong. The rates on Table 4 are based on 14 pump stations, the ITE rates are based on fueling positions. So you would have 28 fueling positions. The trips on Table 4 should be doubled. Response: See response from WPMA under separate cover. 4. Comment: Based on observed field conditions at SH40 and SH 6 the SYNCHRO output sheet in the appendix Tab I for the existing conditions am peak hour is in question. More specifically the column for EBL; the output data sheet illustrates this movement as LOS A, field conditions say otherwise. The storage length was left off the analysis. A storage length of 410 per lane should be used. Based on observed field conditions the queue at these two storage lanes were at capacity in the am peak period for each signal phase with the queue spilling on to the through lanes on SH 40. Ms. Lauren A. Hovde Biffy+Partners November 9, 2009 E N G IN EERI NG SOLUTIONS Page 16 Response: See response from WPMA under separate cover. 5. Comment: Rerun analysis with corrected data inputs. Did the analysis include traffic utilization of alternative routes more specifically Barron Rd. after the completion of the overpass at SH 6? Response: See response from WPMA under separate cover. 6. Comment: The mitigation solution of optimizing the signals for the intersection of SH 40 and SH 6 for the three movements that are failing should be modeled to illustrate the intersection LOS to be D or better after the mitigation. The optimizing of the signals at the intersection will not do anything to address to queuing at the SH 6 SB to SH 6 NB turnaround. Furthermore it is anticipated that traffic coming out of the development will use the turnaround to go northbound. Response: See response from WPMA under separate cover. 7. Comment: Include language in TIA report that describes the Unified Development Ordinance right turn deceleration construction requirement at each driveway based on 50 trip generation per the peak hour or 25 trip generation per peak hour based on 40 mph. Response: See response from WPMA under separate cover. Fire I) Comment: Show two Knox Box locations at the front and back of the building. The front location should be near the front main entrance and the back near an entrance door. Response: Knox Box locations have been depicted as requested. Refer to Key Note 17, Sheet C2.0. 2) Comment: Any gates, fencing or secure areas will need a Knox Pad Lock. Response: Acknowledged. Refer to Note 10, Sheet C2.0. 3) Comment: Knox F.D.C. caps are required. Response: Acknowledged. Refer to Key Note 18, Sheet C2.0. Ms. Lauren A. Hovde y+r e s November 9, 2009 ENGINEERING SOLUTIONS Page 17 Electrical Comments Requiring Immediate Attention 1. Comment: Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines (where applicable, including street lights). Response: A temporary blanket easement will be required. 2. Comment: Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. Response: Acknowledged. A survey crew will locate the utilities after installation and coordinate preparation of the easements as noted. General Electrical Comments 1. Comment: Developer installs conduit per CSU specs and design. Response: Acknowledged. 2. Comment: CSU will provide drawings for electrical installation. Response: Acknowledged. 3. Comment: Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. Response: Acknowledged. 4. Comment: Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. Response: Acknowledged. 5. Comment: If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. Response: Acknowledged. 6. Comment: Developer pours electric device pads or footings (i.e. transformers, pull boxes, etc.) per CSU specs and design. Bury+Partners E N G IN E E R ING SO L U T I ON 5 Response: Acknowledged. Ms. Lauren A. Hovde November 9, 2009 Page 18 7. Comment: Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). Response: Acknowledged. 8. Comment: Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. E-mail to: gmartinez@cstx.gov. Response: Acknowledged. Site Plan has been provided during this process and finalized AutoCAD file will be submitted upon Site Plan approval for final design of the electrical system. The plans currently reflect drawings prepared by CSU. 9. Comment: Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. Response: Acknowledged. Information will be submitted under separate cover directly to CSU as required. 10. Comment: Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. Response: Acknowledged. 11. Comment: To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Response: Acknowledged. Sanitation 1. Comment: Sanitation is ok with this project. Response: Acknowledged. Ms. Lauren A. Hovde ar s November 9, 2009 ENGI N E E R I NG SO L U T I ON Page 19 A copy of the final plat has been provided with this submittal. The required Easement Dedication Sheet including provision of a temporary blanket easement for Lot 12, Block 3, Phase 3 Tower Point Subdivision will be provided with the Final Site Plan/Development Permit Submittal. If you have further questions or need additional information, please do not hesitate to contact me. Sincerely, MARK ROBERT JOHNSON ...... Mark R. Jchmson. P.11. o . 82680 Manager Enclosures I:\001\504\Letters\110909 Hovde.doc.mes.mm I P Bury+Partners ENGINEERING SOLUTIONS December 11, 2009 Ms. Lauren A. Hovde Staff Planner City of College Station 1101 Texas Avenue P.O. Box 9960 College Station, Texas 77842 Re: HEB #2 (SP) - Site Plan Responses to Staff Review Comments No. 2 Dear Ms. Hovde: Project No.: 50001-504.10 This letter is in response to comments received via fax dated November 20, 2009. The responses are in the order in which the comments were received. I W II'1010110[!A 1. Comment. Since the HEB site is being expanded to include the neighboring retail. Please label these plans for HEB as Phase L Response: Each sheet in the set has been revised to reflect "College Station 2 Store (Phase nM- 2. Comment. Please clarify why the phase line bumps out along the drive aisle to the south of the main building. Response: The phase line was bumped out to match the limits of construction per the E&S plan. The phase line has been adjusted per discussions with City Staff. Refer to Sheet C2.0 for the revised phase line. Austin • Dallas • Houston • San Antonio • Temple, Texas Fairfax • Williamsburg, Virginia BURY+PARTNERS-SA, INC. 922 Isom Road, Suite 100y���� San Antonio, Texas 78216 mL (2101525-9090 �V w (2101525-0529 �p �.burypartners.com ` Ms. Lauren A. Hovde December 11, 2009 Page 2 3. Comment: The pedestrian crossing to connect to future businesses across the private access easement off of Hwy 6 must be shown on the site plan. The construction of those crosswalks can be decided between HEB and the developer of Tower Point. The crosswalks are required for pedestrian connectivity which was a condition of the plat and can also be found in Section 7.9.E.4. There should be a crosswalk on either side of the four-way stop next to the 500 SF plaza and across the drive that enter the HEB site in that area. There should also be one at each private access easement connecting to the main private drive coming off Hwy 6 frontage. In addition, a 5' paved path needs to be provided to lead to those crosswalks. This pathway can extend along the edge of the parking islands against the drive. An exhibit of this comment is attached. Response: HEB will provide a pedestrian route through the parking lot just inside Lot 13C as depicted in the attached redline. This will be added to the Retail Site Plan Application at the appropriate time. This 5' walk will be striped and include wheel stops. 4. Comment: Please include the square footage of the carwash as part of the total site building square footage. Response: The square footage of the car wash has been included in the tabulations as requested. Refer to Sheet C2.0. 5. Comment: During a previous discussion, it was agreed that a 26' wide fire lane would be provided at the rear of the building. Please clarify. At least 26' must be provided at the hydrant at the rear as per IFC 2006. Response: A 26' wide fire lane will also be provided at the rear of the building as requested. Refer to Sheet C2.0 for depiction of the fire lanes. 6. Comment: Chain link is not an acceptable fencing or screening material. Please revise Note 31. Response: Alternating picket cedar wood fencing will be provided around the ground mounted unit, the returnables area, the compactor unit, and for the mechanical equipment located within the southern loading dock area. Refer to Sheet C2.0 for revised Key 31, which reflects use of the cedar wood fencing. 7. Comment: What type of screening material is being used for the employee area on the north side of the building? Response: The screening material consists of stainless steel panels and posts with a canopy over the area. Refer to the Architectural Elevation drawings for color scheme of the enclosure. Ms. Lauren A. Hovde Partners December 11, 2009 ENGI N INGN G SO LU TIO N S Page 8. Comment: Note 15 refers to the architectural plans, however, this EFIS wall is shown as plaster and stone on the fapade elevations. Response: The screening wall along the southern loading dock area will be a stone wall. Key Note 15, Sheet C2.0 has been revised accordingly. 9. Comment: The outdoor storage area in the rear must be screened 100% from view with a fence or wall of at least 6' and not greater than 8' in height. It is understood that screening from the right-of-way is difficult, and this will be taken into consideration when reviewing your next submittal detailing the intended screening method. Response: Outdoor storage areas will be screened per our discussion with City Staff. Refer to the Architectural Elevations and Sheet C2.0 for depiction of the limits of the screening. 10. Comment: Is the gasoline storage tank below grade? Response: The fuel storage tank will be installed below grade. Refer to Key Note 20, Sheet C2.0 for labeling of the tank. 11. Comment: The fire wall between the main building and the future retail has been removed. Are the buildings proposed to be separated? Response: The future retail will be constructed adjacent to the HEB store. An appropriate fire wall will be provided by both HEB store and Phase II retail. We have removed the Fire Wall symbol from the legend on Sheet C2.0. 12. Comment: There must be a 3' clear space between the bike racks and the building. Response: Sufficient clear space will be provided between the bicycle rack and the building to permit use of the rack without damage to both the store and the guests property. 13. Comment: Please identify the rounded area next to the carwash. Is this just a paved area? Response: The rounded area is a landscaped island with curbing. Refer to Sheet C2.0. 14. Comment: Please revise the main drive coming off of Hwy 6 to be 26' wide. This was revised by the developer. All drive aisles being constructed with the HEB site need to be shown and dimensioned on the site plan. This includes drives that are off -site. Response: The main drive off Highway 6 has been revised to reflect the Developers Infrastructure Plans. Drive widths are dimensioned as requested. Ms. Lauren A. Hovde Bury-Ir-Partners December 11, 2009 ENGI N INGN G SO LU TIO N 5 Page 15. Comment: Before the site plan can be approved, the easements need to be revised to show the volume and page number provided from the filing of the final plat. Response: We will amend the submittal to include the volume and page number for the proposed developer's easements once the final plat has been recorded. 16. Comment: Please label each structure with its height. Response: We have labeled the maximum building heights as requested. Refer to Sheet C2.0 for depiction of this information. 17. Comment: The Final Plat for Tower Point Phase 3 states that this property does not lie within a floodplain. Please explain the floodplain note on the site plan stating the opposite. Response: The floodplain note states that the property is in Zone "V, an area which is outside the 100-year floodplain. We are in agreement with the Final Plat. 18. Comment: Please provide a detail of the stamped concrete crosswalks including profile drawing and treatment method and color. Response: Detail has been added to Sheet C2.0. 19. Comment: Permanent outdoor sales areas shall be enclosed by a minimum six-foot screen or wall. Such areas shall not exceed 2,500 square feet to ten percent (10%) of the total site area, whichever is less. Permanent areas open to the public for the display and/or sale of merchandise must be included in parking requirement calculations. Response: Permanent outdoor sales areas have been screened as discussed with City staff. The total area designated for this purpose does not exceed 2,500 square feet. Refer to Sheet C2.0 for depiction of the outdoor sales areas. 20. Comment. The queuing spaces at the pharmacy must be 10.5' in width. The outside lane is still 9' wide. Response: The widths of the queuing lanes within the pharmacy drive thru have been revised to a width of 10.5' as required. Refer to sheet C2.0 for dimensioning of the lanes. 21. Comment: If it is HEB's preference to not show off -site drives on the site plan, please add a note stating that details for off -site drives may be found in the construction documents for Tower Point Phase 3. Ms. Lauren A. Hovde Bury+Partners December 11, 2009 ENGINEERING SOLUTIONS Page Response: A note stating this information regarding the offsite drives has been added to the plans as requested. Refer to Note 11, Sheet C2.0. 22. Comment: The 500 SF plaza has structural seating and a raised planter bed. One additional element should be added such as a shade tree or a decorative railing. See Section 7.9.F.1. Response: The public open space plaza has been relocated near the store front as discussed with City staff. The plaza includes three elements consisting of seating elements, vegetative and structural shading, and several raised planter beds. The design is consistent with the requirements set forth in section 7.9.F.1. Refer to Sheet C2.0 and C5.0 for depiction and details of the plaza. 23. Comment: Should the Knox Box on the front fagade have an "18" by it like the back facade? Response: A key identifying the Knox -Box at the front of the store has been added. Please refer to Sheet C2.0 for location of the Knox -Boxes. 24. Comment: Any gates, fencing, or secure areas will need a Knox Pad Lock. Note 10 does not refer to this as stated in the response to staff comment. Response: Note 10, Sheet C2.0 has been revised to state a Knox Pad Lock is required for any gates, fencing, or secured areas. 25. Comment: Efforts must be made to screen from the right-of-way. At this time, there are several areas that are not being adequately screened such as the trash compactor, outdoor storage, and the ice freezer. Please provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within ISO' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Response: Rooftop structures will be screened as requested. Refer to the Architectural Elevations and Plans for information regarding screening of rooftop equipment. We have also included the note on Sheet C2.0 as required. 26. Comment: Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Response: We acknowledge this requirement. Ms. Lauren A. Hovde Bury+Partners December 11, 2009 ENGINEERING SOLUTIONS Page LANDSCAPING/STREETSCAPING/BUFFER: 1. Comment: Please revise the plant schedule to show the total points as 36,550. Response: The planting schedule has been revised to show the total points at 36,550. Refer to Sheet LS1 and LS2. 2. Comment: The parking calculation needs to be revised to show 489 spaces. Response: The parking count has been revised and coordinated between the site plan and landscaping Plan. A total parking count of 483 spaces will be provided within the development. Engineering Comments No. 2 Comment: Please submit a specific PUEs or a blanket PUE for onsite easements. Blanket PUE will need to be filed prior to site plan approval and specific PUEs dedicated prior to issuance of CO. Response: The developer does not want to grant this easement. HEB cannot grant the easement until closing on the property. We will provide the easement as soon as HEB has J/ ownership. 12 Comment: Please submit a Letter of Acknowledgment of City Standards. Response: A Letter of Acknowledgment has been provided with this submittal. 3. Comment: C2.013.0 -Please show the location of the water meter for the main building. Response: The location of the water meter is depicted on Plan Sheets C2.0/0.0 as requested. The meter is located within the proposed PUE. 4. Comment: C2.013.0 - Locations of some utilities and retaining wall being built by the developer have changed. Please coordinate with Walter P. Moore to revise. Response: We have revised our plans to reflect the current Infrastructure Plans from Walter P. Moore and which reflects the revised roadways, retaining wall, and utilities. Ms. Lauren A. Hovde ry art err December 11, 2009 ENGI N EE RING 50 LUTI ON Page 5. Comment: C2.0/3.0 - The width of the western access drive has changed. Please coordinate with Walter P. Moore to revise. Response: We have revised our plans to reflect the current Infrastructure Plans from Walter P. Moore and which reflects the revised roadways, retaining wall, and utilities. 6. Comment: C2.0/3.0 - Please move water meters to unpaved areas within PUEs. Response: The water meters are located in unpaved areas as requested. Refer to Sheet C3.0 for depiction of the meters. 7. Comment: C2.0/3.0 - Please show and label irrigation meter with PUE. Response: The location of the irrigation meter has been added and identified on the plans as requested. Please refer to Sheet C2.0 and Sheet C3.0 for depiction of the irrigation meter. 8. Comment: C2.0/3.0 - Please add a note stating that the fire suppression line shall have a lockable lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by College Station Utilities Director or his designee. Response: Key Note 13, Sheet C3.0, states that the fire suppression line shall have a lockable lid on the isolation valve. 9. Comment: C3.0 - An isolation valve within the PUE is required on the fire line, not a gate valve. Response: The call out on Sheet C3.0 for the fire suppression line has been revised as requested. 10. Comment: C3.0 - One length of sanitary sewer line is labeled 6-inch and 8-inch. Please clarify what size the line will be. Response: The size of the sanitary sewer line has been revised. An 8 inch main will be extended into the property and three 6" laterals will be provided to serve the buildings. Refer to sheet C3.0. vde BUry+Partners Ms. Lauren 1 Ho December 1, 2009009 ENGINEERING SOLUTIONS Pne8 If you have further questions or need additional information, please do not hesitate to contact me Sincerely, Mark R. Jo son, E. Principal/Sera roject Manager Enclosures I:\001\504\Letters\121109 Hovde.doc.=.mc P Bury+Partners ENGI N EERI N G SOLUTIONS February 22, 2010 Ms. Lauren A. Hovde Staff Planner City of College Station 1101 Texas Avenue P.O. Box 9960 College Station, Texas 77842 Re: HEB #2 (SP) - Site Plan Responses to Staff Review Comments No. 3 Dear Ms. Hovde: Project No.: 50001-504.10 This letter is in response to comments received via e-mail dated January 15, 2010. The responses are in the order in which the comments were received. PLANNING: 1 v/ Comment. Please identify the height of the cedar screening fence at the rear of the main building. Response: An 8 foot tall cedar screening fence will be used at the rear of the main building and within southern loading dock around the pad mounted equipment. Refer to key note 31, Sheet C2.0, for depiction of fence height. 2. ✓ Comment: The phase line should be 20' from any improvements, including the parking spaces that extend off the property. Response: The phase line has been adjusted as requested. Refer to Sheet C2.0 for depiction of the revised phase line. Note that HEB's General Contractor will construct the southern entrance drives from Private Drive "C". 3. V Comment: The private road coming off of Highway 6 is not shown to be 26' wide as proposed by the developer. BURY+PARTNERS-SA, INC. 922 Isom Road, Suite 100 San Antonio, Texas 78216 M (210( 525-9090 rae (210) 525-0529 Austin - Dallas - Houston - San Antonio - Temple, Texas Fairfax - Williamsburg, Virginia w .burypartnersxom Bury+Partners E N G IN E E R ING SO L U T I ON S Ms. Lauren A. Hovde February 22, 2010 Page 2 Response: We have updated the plans based upon WPMA current files. The road widths match between the sets with the discrepancy being how the streets are dimensioned. WPMA dimensions the streets from back of curb to back of curb. We have measured the roadways from face of curb to ensure road widths meet minimum standards. 4. / Comment: There should be a pedestrian ramp on the south side of the intersection where the 500 SF plaza was previously proposed. Response: Accessible curb ramps have been provided at both sides of HEB's northern primary drive where the roadway meets with Private Drive D as requested. S. ✓Comment: Easements must be labeled with their volume and page number for site plan approval. Response: Easements have been labeled as requested. Refer to the revised submittal for depiction of the volume and page reference. 6. 61 Comment: #37 is not labeled on the plan. Please revise. Response: Key note 37 on Sheet C2.0 which references the 9' wide sidewalk with tree wells as required for the development's pedestrian connection route has been updated in this submittal. 7. vComment. Please revise the curb details to show a 6" monolithic curb, as required by City standards. Response: Two Curb details are provided in the Site Plan submittal. A 6" monolithic curb will be used within the site for the majority of areas with asphalt pavement. We also provide a Curb for Concrete Pavement detail, which will be used for construction of curb at the back of house near the loading dock areas. Refer to Sheet C2.0 for the details, and Sheet C2.1 for the paving plan which depicts limits of concrete pavement. 8. J Comment: There does not appear to be a stop sign at the exit point on the drive used for the fuel station or the main HEB loop. Response: Stop signs will be provided at all exit drives from HEB's property to Private Drives C and D. Refer to Sheet C2.0 for depiction of the sign and stop bar locations. 9. ✓ Comment: Please identify what material is used for the Base Course shown in the Pavement Section detail. Bury+Partners E N GIN EER ING SOLUTIONS Ms. Lauren A. Hovde February 22, 2010 Page 3 Response: Compacted Crushed Limestone will be used for the Base Course. Refer to the pavement section detail found on Sheet C2.0 for this statement. 10. Comment: A couple minor changes to the text include: The zoning is actually G1 and ED Also, lots 14 and 15 are in Phase 7, not Phase 3 as shown. Response: Zoning and Phase information has been revised as requested. 11. ,/ Comment: Though the parking lot light pole positions are conceptual, please show the pole being placed at one side or the other of the pedestrian path. It is currently shown in the center, which would interfere with a clear 5' path. Thank you. Response: The locations of the light poles have been revised and are not located within a pedestrian route. Refer to Sheet C2.0 and E101 for depiction of the light standards. 12.04omment: There are 63 spaces, not 64, in the parking row to the northwest of the one with the pedestrian path. This gives you 479 spaces total. Response: The parking count has been revised to reflect the proposed number of spaces. Refer to sheet C2.0 for the tabulation. Comment: Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Response: Acknowledged. We have provided a separate Fire Protection Plan, which coordinates the proposed fire lanes between the Store Submittal and the Developer's Infrastructure Plans. ENGINEERING COMMENTS NO. 3 (! Comment: As a reminder, the Blanket PUE which was submitted for the site will need to be filed prior to site plan approval and specific PUEs dedicated prior to issuance of CO. Response: A blanket PUE was submitted by the Developer on December 28, 2009. A copy of the easement submittal has been provided for reference. fCr &WdAt -jI6 111010 2. Comment. Please provide afire flow letter stating required fire flows necessary to serve this building per the International Fire Code, and thus verifying that the proposed fire hydrants will adequately serve the development. Bury+Partners E N G IN E E R ING SO L U T I ON S Ms. Lauren A. Hovde February 22, 2010 Page 4 Response: A Fire Flow letter stating the required flows necessary to serve Lots 12, 13A and 13C has been included with this submittal package. 3. Comment: C2.0 - In accordance with our Site Design Standards, Key Note #2 needs to specify red painted curbs and curb ends with 4-inch white lettering stating FIRE LANE - NO t6c> PARKING- TOWAWAYZONE. " The wording maybe spaced no more than 15-ft apart. PC Response: The Key note has been revised and is now depicted on Sheet C2.3, the Fire n Protection Plan, as requested. This additional plan sheet has been incorporated within the set to coordinate the proposed fire lanes between the Store Submittal and the Developer's Infrastructure Plans. The curbs will be painted per the Site Design Standards except at the back of house where HEB's rear drive exceeds the standard fire lane width. The Fire Land and associated text will be applied on the concrete pavement behind the loading dock areas as required. 4� Comment: C3.0 - The water lines need to be at least 5.5-ft from centerline to the edge of the PUE. Response: The PUE has been revised to provide the 5.5 foot of separation. Refer to Sheet C3.0, the Utility Plan, for depiction of the water line and proposed easement. V./ Comment: C3.0 - Water meters or isolation valves need to be set at the edge of the PUE, as water service, irrigation, and fire suppression lines are required to be privately maintained. Response: Water Meters and isolation valves are now located at the edge of the PUE. Refer to sheet C3.0 for depiction of the meters and valves. V./ Comment: C2.01C3.0 - The Water and Wastewater Calculations state "90 persons per acre" rather than 30 persons per acre. Response: The typographical error has been revised on Sheet C2.0 and C3.0. ovde Bur +Partners Ms. Lauren 2010 Y February 2, 2010 ENGINEERING SOLUTIONS Page If you have further questions or need additional information, please do not hesitate to contact me. Sincerely, Mark R. MARK ROBERT JOHN SON P• o.............. 82630.....eic- Principa ' Senior Proct Manager spF,e Bury+P er - , Inc. — F-1048 C7 Z�v I:\001\504\Lettem\022210 Hovde.doc.mes.mm