HomeMy WebLinkAboutStaff CommentsSTAFF REVIEW COMMENTS NO. 2 Project: FIRST VICTORIA (SP) - 09-00500193 PLANNING 1. In regards to General Note # 4, if the City of College Station sanitation services are not being utilized due to the use of a private disposal company, the minimum fee according to city ordinance is $14.00 per month. 2. Regarding Site Plan Keynote #49, the 4" diameter galvanized pipe curb cannot be used in lieu of a 6" monolithic curb. However, it can be used in addition to a 6" monolithic curb, but will need to be painted. If this is the intent, please revise the "Pipe Curb Diagram" and revise Keynote #49. 3. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Matthew Hilgemeier, Staff Planner Date: 10/23/09 LANDSCAPING 1. Planning has no additional comments 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CTTY OP COfSF.GHSD MON X r� A6M Unirrrniry• MEMORANDUM October 5, 2009 //``'' i TO: Brad Cutright, Cutright & Allen, Inc., via fax: 979-968-8887'10 FROM: Jennifer Prochazka, AICP, Senior Planner SUBJECT: FIRST VICTORIA (SP)- Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Cover memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Four (4) revised site plans; One (1) landscaping plan; If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Matthew or Jennifer at 979.764.3570. Attachments: Staff review comments PC: Don Sparks, First Victoria, via fax: 361-574-8464 Case file #09-00500193 /T1 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COI A AG1'. STATION xom.Ira„n�ra cw„mrr MEMORANDUM October 26, 2009 / t�j j TO: Brad Cutright, via fax 979.968.8887 �1 `` ? 1� oqU FROM: Matthew Hilgemeier, Staff Planner SUBJECT: FIRST VICTORIA (SP) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Four (4) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments �/ cc: Don Sparks, First Victoria, via fax 361.574.8464 V � rr� b Iay. ll-A Case file #09-00500193 Home aflaar AerrM Univeniry' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 25, 2009 TO: Brad Cutright, Cutright & Allen, Inc., via fax 979.968.8887V 4 PI W 1 FROM: Molly Hitchcock, AICP Planning Administrator SUBJECT: FIRST VICTORIA (SP) Thank you for your submittal of complete site plan, non-residential architectural standards, and development permit applications for First Victoria. This project met the September 23, 2009 submittal deadline and will be distributed to staff next week for their review. I �{ cc: Don Sparks, First Victoria Bank, via fax 361.574.8464 Case file no. 09-00500193 Case file no. 09-00500194 Case file no. 09-00100053 STAFF REVIEW COMMENTS NO. 1 Project: FIRST VICTORIA (SP) — 09-00500193 PLANNING 1. Sanitation is requiring that this project have at least a 90 gallon trash can on site. This size container does not require additional screening, but the location will need to be identified. 2. Please include improvements that will made in the access easement off site as a part of this site plan. The site plan shows the proposed drive aisle on site dead ending into a curbed area along the access easement. 3. Please provide more information relating to Site Plan Keynote #49. In general, all paved areas must be surrounded by a 6" monolithic curb. Is the proposed "galv pipe curb" in addition to the concrete curb or in lieu of? Please include finish of pipe curb. 4. Please revise Site Information note #7 to read as follows: "Lot 1, Block 4 and Lot 2, Block 4 are one building plot for the purposes of the Unified Development Ordinance, including signage, Non -Residential Architectural Standards, and access. 5. Please show how the transformer located in the northwest corner of the property will be screened. 6. A temporary curb detail has been provided on the site plan. Is temporary curbing proposed on site? If so, please identify where on site. 7. Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 8. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.10 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 9. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Matthew Hilgemeier & Jennifer Prochazka Date: 10/5/2009 LANDSCAPING/STREETSCAPING/BUFFER 1) The site plan shows that the area of the site is 66,211 square feet; however, the landscape plan shows the site to be 66,007 square feet. Please adjust the landscape plan area and calculations to match the area shown on the site plan. 2) Several of the non -canopy trees proposed on the landscape plan are not included on the City of College Station approved plantings list; additionally, the majority of shrubs identified on the plan are not listed on the City of College Station approved plantings list. These plants may be used, however points may not be earned. I have attached the approved plant list to this memo. Please revise the landscape plan accordingly. 3) Streetscaping is required along the entire frontage of both Highway 40 and Arrington Road, including the corner where these two right-of-ways meet. Please revise the Landscape Plan. 4) The Landscape Plan states that 8 canopy trees are required along Highway 40 to meet the streetscape requirements for this frontage. I have identified 5 canopy trees and one non - canopy tree in this area. There were two Chaste Trees and one Retama Tree shown along this frontage, but those species of trees are not listed on the City of College Station approved plantings list, and therefore cannot be applied to the streetscape requirements. 5) In relation to note number 10 on the Landscape Plan, the use of loose rock of any kind should be limited around drive aisles and parking spaces. Please identify how rock will be confined to the planting areas. In general, it may only be used within planted areas and not as a stand-alone groundcover. Reviewed by: Matthew Hilgemeier and Jennifer Prochazka Date:10/5/2009 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING COMMENTS NO. 1 1. Please submit Letter of Acknowledgement. 2. FYI - The subject tract is located in the Spring Creek Sanitary Sewer Impact Fee Area. 3. The water demands provided require a .75 inch meter, please revise. 4. Sanitary sewer service line requires a clean out every 100 feet. 5. Please specify exactly which past drainage report this lot falls under. 6. Please provide drainage calcs. specific to this site (ie. culvert sizing, pipe sizing, drainage backup in parking areas < 6 inches, etc) 7. What are the total post development flows leaving the site and how does that coincide with the referenced report? 8. Is the illustrated transform pad the actual size? Please move the pad a far away from the existing sanitary sewer main as possible. 9. No additional fill will be allowed in the existing 20 foot PUE located along the western property line, please revise. 10. Please verify that the proposed retaining wall does not encroach the existing PUE. 11. Please specify that Detail S1-03 be used when connecting to the existing storm box. 12. (Sheet C-3) Please verify the size of sanitary sewer main crossing Arrington, noted "By Others". 13. (Sheet C-3) Please note on the site plan the fire flow and number of fire hydrants required on this site based on building size and material type (Table B105.1 and C105.1 of the Fire Code). 14. Storm water management requirements are as follows, any questions may be directed to Donnie Willis, CoCS Drainage Inspector, at 979-764-6375: Storm Water Discharges from Small Construction Activities The Texas Commission on Environmental Quality has issued a general permit for construction activities under the Texas Pollution Discharge Elimination System. The general permit (TXR150000) is for construction activities disturbing at least 1 but less than 5 acres or is part of a common plan of development disturbing at least 1 but less than 5 acres. You will need to follow these steps to discharge storm water from your construction site to the City of College Station's Municipal Separate Storm Water Sewer System (MS4): 1. Read the general permit (TXR150000) to make sure it applies to your situation. 2. Adhere to the requirements of the general permit (TXR150000). 3. Prepare and implement a Storm Water Pollution Prevention Plan in accordance with Part III of the general permit (TXR150000). 4. Sign and post a construction site notice. 5. At least 2 days before beginning construction, provide a copy of the site notice to the operator of any Municipal Separate Storm Water Sewer System (MS4) into which storm water will be discharged. A MS4s include streets, channels, gutters, ditches or anything else that is publicly owned, designed or used to collect or transport storm water. As long as you meet the conditions of this general permit, you are authorized to discharge storm water. No notice of intent (NOI), notice of termination (NOT), or fee is required under this option —as long as the requirements of this general permit are followed. This particular general permit will expire at midnight on March 5, 2013. A copy of General Permit TXR150000 can be obtained from TCEQ at: hftp/www.tceq. state.tx. us/assets/public/perm itting/waterquality/attachments/stormwater/txrl 50000. pdf A copy of the construction site notice can be obtained from TCEQ at: hftp/www.tceq.state.tx. us/assets/public/permitting/waterquality/attachments/stormwater/txrl 52d2.pdf Reviewed by: Josh Norton SANITATION 1. Need to show type of garbage collection to be provided. Reviewed by: Wally Urrutia Date: September 29, 2009 Date: October 2, 2009