HomeMy WebLinkAboutDevelopment Permit♦ /J� DEVELOPMENT PERMIT
PERMIT NO.14-49D
cnvoFcou esrnnuN FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
Bridgewood Ph.1 - WS Phillips Extension
DATE OF ISSUE: 12/22/14
OWNER:
BCS Development Co.
4090 State Highway 6 South
College Station, TX 77845
TYPE OF DEVELOPMENT:
2985 Barron Cut -Off Rd.
DRAINAGE BASIN:
Spring Creek
VALID FOR 24 MONTHS
CONTRACTOR:
Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
I, JKAIRS 6" L� �� the Contractor, hereby agree to comply with all conditions herein.
Con
nnjactor Signat re D to
(/ ??I z{!Z - .731s )I Inneit'�/bpi l f
Phone number �j�' a,maiill
I hereby grant this permit for development. Contact 6w the Public Works
Inspector assigned to this project 24 hours prior to beginn ng col truction f# scheduling required Inspections.
a& dA 171 l
City Engineer/Representativ Date
CrfYOF COLLEGE STATION
ia�w,y dt4,dn�rm S.d..n
DEVELOPMENT PERMIT
PERMIT NO. 14-49C
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Bridgewood Phase 1 - BCS Dev. Portion
DATE OF ISSUE: 7/10/14
OWNER:
BCS Development Co.
4090 State Highway 6 South
College Station, TX 77845
TYPE OF DEVELOPMENT:
SITE ADDRESS:
2985 Barron Cut -Off Rd.
DRAINAGE BASIN:
Spring Creek
VALID FOR 24 MONTHS
CONTRACTOR:
Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NO[) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
I, S^Lih(�n+V�d the Contractor,
Contractor Signature'
%(3- 3P
Phone number
hereby agree to comply with all conditions herein.
Date
E-mail
I hereby grant this permit for development. Contact IL�� / BCcJ — LIB — 8?" the Public Works
Inspector assigned to this project 24 hours prior to beginning ctifistructioinjfor scheduling required Inspections.
City Engineer/ epresent ive Date
♦ /J� DEVELOPMENT PERMIT
PERMIT NO. 14-49A
GTvorcotuce srariuN FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
o•a .k RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
Bridgewood Subdivision-CSISD Waterline 2985 Barron Cut -Off Rd.
DRAINAGE BASIN:
Spring Creek
DATE OF ISSUE: 6/13/14 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
BCS Development Co.
4090 State Highway 6 South
College Station, TX 77845
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions: `
I, Ira2y AA-0 4NQQ the Contractor, hereby agree to comply with all conditions herein.
40A/14
ractor Signature Date
073H ZtSe.WCNAa619%ad( S,60%ol-,
Phone number E-mail
I hereby grant this permit for development. Contact K"'T%YlVX' -M`7— uZg2 , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
� [Y
City Engineer/R resentative [Yale
♦ /Jr1 DEVELOPMENT PERMIT
PERMIT NO. 14-49B
crrrorcou.�:ce5rnnnN FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
w n Gr u< RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
Bridgewood Phase 1 - CSISD Portion 2985 Barron Cut -Off Rd.
DRAINAGE BASIN:
Spring Creek
DATE OF ISSUE: 7110114 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
BCS Development Co.
4090 State Highway 6 South
College Station, TX 77845
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions: 11
I, JC Ali the Contractor, hereby agree to comply with all conditions herein.
C cJ �J 4/00t 201¢
ontr ctor Signature Date
�Iy o2(09 1132 fnlev,cfazcu�roeris corn
Phone number E-mail
I hereby grant this permit for development. Contact Il4W � P,� 1,1J -9 No , the Public Works
Inspector assigned to this project 24 hours prior to beg n ing c structio r scheduling required Inspections.
1 Ito%�
City Enginee ive D teT
DEVELOPMENT PERMIT
PERMIT NO. 14-49A
onov Courcesrenoe FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Bridgewood Subdivision-CSISD Waterline
DATE OF ISSUE: 6/13/14
OWNER:
BCS Development Co.
4090 State Highway 6 South
College Station, TX 77845
TYPE OF DEVELOPMENT:
SITE ADDRESS:
2985 Barron Cut -Off Rd.
DRAINAGE BASIN:
Spring Creek
VALID FOR 24 MONTHS
CONTRACTOR:
Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence ofthe project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
I, , the Contractor, hereby agree to comply with all conditions herein.
Contractor Signature
Phone number
Date
E-mail
I hereby grant this permit for development. Contact , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
City Engineer/Representative
Date
QT OFCOLL E$TAUON
,ate CITY INFRASTRUCTURE
INSPECTION NOTICE
Date:
To:
From: Crystal Derkowski
RE: BRIDGEWOOD SUBDIVISION - CSISD WATERLINE
(DP 14-49A)
Location: 2985 BARRON CUT-OFF RD.
❑
Public Water Lines/Fire Hydrants
❑
Public Sanitary Sewer
❑
Public Storm Sewer
❑
Public Streets
❑ Engineer's Estimates Attached
❑
Public Detention Facility
❑ Construction Plans Attached
❑
Driveway Connection to Public Street
❑ Site Plan Attached
❑
Private Construction within easement
❑
❑ No Inspection Required
Comments:
** WATERLINE ADJACENT TO CSISD ELEMENTARY SCHOOL #9 ON W.S.
PHILLIPS PKWY. ONLY.
QTMmFCOL s;^n„N CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 6/13/14
To: Diane Broadhurst
From: Crystal Derkowski
RE: BRIDGEWOOD SUBDIVISION - CSISD WATERLINE
(DP 14-49A)
Location: 2985 BARRON CUT-OFF RD.
❑
Public Water Lines/Fire Hydrants
❑
Public Sanitary Sewer
❑
Public Storm Sewer
❑
Public Streets
® Engineer's Estimates Attached
❑
Public Detention Facility
® Construction Plans Attached
❑
Driveway Connection to Public Street
❑ Site Plan Attached
❑
Private Construction within easement
❑
❑ No Inspection Required
Comments:
** WATERLINE ADJACENT TO CSISD ELEMENTARY SCHOOL #9 ON W.S.
PHILLIPS PKWY. ONLY.
DEVELOPMENT PERMIT
PERMIT NO. 14-49B
onov Courcesrenoe FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Bridgewood Phase 1 - CSISD Portion
DATE OF ISSUE: 7/10/14
OWNER:
BCS Development Co.
4090 State Highway 6 South
College Station, TX 77845
TYPE OF DEVELOPMENT:
SITE ADDRESS:
2985 Barron Cut -Off Rd.
DRAINAGE BASIN:
Spring Creek
VALID FOR 24 MONTHS
CONTRACTOR:
Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence ofthe project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
I, , the Contractor, hereby agree to comply with all conditions herein.
Contractor Signature
Phone number
Date
E-mail
I hereby grant this permit for development. Contact , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
City Engineer/Representative
Date
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 7/10/14
To: Alan Gibbs
From: Crystal Derkowski
RE: BRIDGEWOOD PHASE 1
MP 14-49)
Location: 2985 BARRON CUT-OFF RD.
®
Public Water Lines/Fire Hydrants
®
Public Sanitary Sewer
®
Public Storm Sewer
®
Public Streets
® Engineer's Estimates Attached
❑
Public Detention Facility
® Construction Plans Attached
❑
Driveway Connection to Public Street
❑ Site Plan Attached
❑
Private Construction within easement
❑
❑ No Inspection Required
Comments:
NOTES: * NO work in TxDOT right-of-way until TxDOT permit approved.
* Sidewalks need to have smooth curves where they meander around power poles.
* Storm Sewer Inlet 6.01 is special inlet and should be constructed per detail on
Sheet C7.4.
* Work should NOT start on BCS Development portion of Water & Concrete
Street Surface on WS Phillips until OP approved by Council.
* The appox. 200-ft of WS Phillips should be constructed at contractor's risk until
agreement reached with adjacent Thomas property for Barron Rd. connection.
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 7/10/14
To: Diane Broadhurst
From: Crystal Derkowski
RE: BRIDGEWOOD PHASE 1
MP 14-49)
Location: 2985 BARRON CUT-OFF RD.
®
Public Water Lines/Fire Hydrants
®
Public Sanitary Sewer
®
Public Storm Sewer
®
Public Streets
® Engineer's Estimates Attached
❑
Public Detention Facility
® Construction Plans Attached
❑
Driveway Connection to Public Street
❑ Site Plan Attached
❑
Private Construction within easement
❑
❑ No Inspection Required
Comments:
DEVELOPMENT PERMIT
PERMIT NO. 1449C
onov Courcesrenoe FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Bridgewood Phase 1 - BCS Dev. Portion
DATE OF ISSUE: 7/10/14
OWNER:
BCS Development Co.
4090 State Highway 6 South
College Station, TX 77845
TYPE OF DEVELOPMENT:
SITE ADDRESS:
2985 Barron Cut -Off Rd.
DRAINAGE BASIN:
Spring Creek
VALID FOR 24 MONTHS
CONTRACTOR:
Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence ofthe project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
I, , the Contractor, hereby agree to comply with all conditions herein.
Contractor Signature
Phone number
Date
E-mail
I hereby grant this permit for development. Contact , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
City Engineer/Representative
Date
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 7/10/14
To: Alan Gibbs
From: Crystal Derkowski
RE: BRIDGEWOOD PHASE 1
MP 14-49)
Location: 2985 BARRON CUT-OFF RD.
®
Public Water Lines/Fire Hydrants
®
Public Sanitary Sewer
®
Public Storm Sewer
®
Public Streets
® Engineer's Estimates Attached
❑
Public Detention Facility
® Construction Plans Attached
❑
Driveway Connection to Public Street
❑ Site Plan Attached
❑
Private Construction within easement
❑
❑ No Inspection Required
Comments:
NOTES: * NO work in TxDOT right-of-way until TxDOT permit approved.
* Sidewalks need to have smooth curves where they meander around power poles.
* Storm Sewer Inlet 6.01 is special inlet and should be constructed per detail on
Sheet C7.4.
* Work should NOT start on BCS Development portion of Water & Concrete
Street Surface on WS Phillips until OP approved by Council.
* The appox. 200-ft of WS Phillips should be constructed at contractor's risk until
agreement reached with adjacent Thomas property for Barron Rd. connection.
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 7/10/14
To: Diane Broadhurst
From: Crystal Derkowski
RE: BRIDGEWOOD PHASE 1
MP 14-49)
Location: 2985 BARRON CUT-OFF RD.
®
Public Water Lines/Fire Hydrants
®
Public Sanitary Sewer
®
Public Storm Sewer
®
Public Streets
® Engineer's Estimates Attached
❑
Public Detention Facility
® Construction Plans Attached
❑
Driveway Connection to Public Street
❑ Site Plan Attached
❑
Private Construction within easement
❑
❑ No Inspection Required
Comments:
DEVELOPMENT PERMIT
PERMIT NO. 1449D
onov Courcesrenoe FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Bridgewood Ph.1 - WS Phillips Extension
DATE OF ISSUE: 12/22/14
OWNER:
BCS Development Co.
4090 State Highway 6 South
College Station, TX 77845
TYPE OF DEVELOPMENT:
SITE ADDRESS:
2985 Barron Cut -Off Rd.
DRAINAGE BASIN:
Spring Creek
VALID FOR 24 MONTHS
CONTRACTOR:
Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
I, , the Contractor, hereby agree to comply with all conditions herein.
Contractor Signature
Phone number
Date
E-mail
I hereby grant this permit for development. Contact , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
City Engineer/Representative
Date
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 1212
To: Alan Gibbs
From: Crystal Derkowski
RE: BRIDGEWOOD PHA - WS PHILLIPS EXTENSION
MP 14-49D1
Location: 2985 BARRON CUT-OFF RD
®
Public Water Lines/Fire Hydrants
❑
Public Sanitary Sewer
❑
Public Storm Sewer
®
Public Streets
® Engineer's Estimates Attached
❑
Public Detention Facility
® Construction Plans Attached
❑
Driveway Connection to Public Street
❑ Site Plan Attached
❑
Private Construction within easement
❑
❑ No Inspection Required
Comments:
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 12/22/14
To: Diane Broadhurst
From: Crystal Derkowski
RE: BRIDGEWOOD PHA - WS PHILLIPS EXTENSION
MP 14-49D1
Location: 2985 BARRON CUT-OFF RD.
®
Public Water Lines/Fire Hydrants
❑
Public Sanitary Sewer
❑
Public Storm Sewer
®
Public Streets
® Engineer's Estimates Attached
❑
Public Detention Facility
® Construction Plans Attached
❑
Driveway Connection to Public Street
❑ Site Plan Attached
❑
Private Construction within easement
❑
❑ No Inspection Required
Comments: