FINAL PLAT
for
Bridgewood Subdivision Ph 1
14-00900049
SCALE:
1 lot on 29.404 acres
LOCATION:
2985 Barron Cut -Off Road, generally located between Barron
Road and Castlegate Subdivision
ZONING:
PDD Planned Development District
APPLICANT:
Randy French, BCS Development Company
PROJECT MANAGER:
Jason Schubert, AICP, Principal Planner
jchubert@cstx.gov
PROJECT OVERVIEW: This request is for a Final Plat of one lot for CSISD Elementary #9
and the associated right-of-way. In addition, Phase One will final
plat the common area/detention facility and city park property for
the Bridgewood Subdivision. The Preliminary Plan was approved
by the Planning and Zoning Commission on February 6, 2014.
The property was rezoned in August 2013 as a PDD Planned
Development District.
RECOMMENDATION:
Staff recommends approval of the Final Plat.
Planning &Zoning Commission Pagel of4
Meeting Date, 2015
Revised Aerial to depict realigned Brewster Drive
Planning & Zoning Commission Page 2 of 4
Meeting Date, 2015
Revised Small Area Map to depict realigned Brewster Drive
Planning & Zoning Commission Page 3 of 4
Meeting Date, 2015
DEVELOPMENT HISTORY
Annexation: June 21, 1995
Zoning: A-O Agricultural Open (upon annexation)
A-O Agricultural Open and R-1 Single -Family Residential (2008)
PDD Planned Development District (2013)
Preliminary Plan: Approved February 6, 2014
Site Development: Vacant
COMMENTS
Parkland Dedication: The Preliminary Plan included 1.386 acres for Neighborhood
Parkland Dedication, which was approved by the Planning and
Zoning Commission at the February 6, 2014 meeting. Phase One
is dedicating 1.247 acres out of the 1.386 total acres of required
Neighborhood Parkland for the residential subdivision. Parkland
Development fees are not required for this specific lot because it
is CSISD Elementary School #9, which is a non-residential use.
Greenways:
No greenway dedication is required or proposed.
Pedestrian Connectivity:
Six foot sidewalks will be constructed along both sides of all
proposed residential streets. Sidewalks on the school property
will be ten feet. Sidewalks are also proposed in the Thoroughfare
Plan for W.S. Phillips Parkway and will be constructed in the
future.
Bicycle Connectivity:
Bicycle lanes are proposed in the Thoroughfare Plan for W.S.
Phillips Parkway and will be constructed in the future.
Impact Fees:
The subject property is located within the Spring Creek Sanitary
Sewer Impact Fee Area: $98.39/Living Unit Equivalent.
REVIEW CRITERIA
Compliance with Subdivision Regulations: The proposed Final Plat is in compliance with
the Preliminary Plan and Subdivision Regulations contained in the Unified Development
Ordinance.
STAFF RECOMMENDATIONS
Staff recommends approval of the Final Plat.
SUPPORTING MATERIALS
1. Application
2. Copy of Final Plat
Planning & Zoning Commission Page 4 of 4
Meeting Date, 2015
CITY OF COLLEGE STATION
FINAL PLAT
for
Bridgewood Subdivision, Phase 1
14-00900049
SCALE: One institutional lot, one common area, and one city park on
29.633 acres
LOCATION: 2985 Barron Cut -Off Road
ZONING: PDD Planned Development District
APPLICANT: BCS Development Co., part owner with College Station I.S. D.
PROJECT MANAGER: Mark Bombek, Staff Planner
mbombek@cstx.gov
RECOMMENDATION: Staff recommends approval of the Final Plat
Planning & Zoning Commission Page 1 of 3
May 7, 2015
DEVELOPMENT HISTORY
Annexation: 1995
Zoning: A-O Agricultural Open (upon annexation)
R-1 Single -Family Residential 2008
PDD Planned Development District 2013
Preliminary Plat: Approved in 2014
Site Development: Vacant
COMMENTS
Parkland Dedication: 1.349 acres of land was identified for dedication with this phase
with the Preliminary Plan, which was approved by the Planning
and Zoning Commission at their February 6, 2014 meeting.
Greenways:
No greenway dedication is required or proposed.
Pedestrian Connectivity:
Sidewalks will be constructed along both sides of all proposed
residential streets, including Brewster, which is being built to a
minor collector standard. Sidewalks are also proposed in the
Thoroughfare Plan for W.S. Phillips Parkway, a proposed 4-lane
major collector, and will be constructed in the future.
Bicycle Connectivity:
Bike lanes are proposed in the Thoroughfare Plan for W.S. Philips
Parkway, but not along Brewster Drive.
Impact Fees:
The subject property is located within the Spring Creek Sanitary
Sewer Impact Fee Area: $98.39/ Living Unit Equivalent.
REVIEW CRITERIA
Compliance with Subdivision Regulations: The proposed Final Plat is in compliance with
the Subdivision Requirements contained in the Unified Development Ordinance.
STAFF RECOMMENDATIONS
Staff recommends approval of the Final Plat.
SUPPORTING MATERIALS
1. Application
2. Copy of Final Plat
Planning & Zoning Commission Page 3 of 3
May 7, 2015