Loading...
HomeMy WebLinkAboutStaff ReportCITY OF COLLEGE STATION FINAL PLAT for Bridgewood Subdivision Ph 1 14-00900049 SCALE: 1 lot on 29.404 acres LOCATION: 2985 Barron Cut -Off Road, generally located between Barron Road and Castlegate Subdivision ZONING: PDD Planned Development District APPLICANT: Randy French, BCS Development Company PROJECT MANAGER: Jason Schubert, AICP, Principal Planner jchubert@cstx.gov PROJECT OVERVIEW: This request is for a Final Plat of one lot for CSISD Elementary #9 and the associated right-of-way. In addition, Phase One will final plat the common area/detention facility and city park property for the Bridgewood Subdivision. The Preliminary Plan was approved by the Planning and Zoning Commission on February 6, 2014. The property was rezoned in August 2013 as a PDD Planned Development District. RECOMMENDATION: Staff recommends approval of the Final Plat. Planning &Zoning Commission Pagel of4 Meeting Date, 2015 Revised Aerial to depict realigned Brewster Drive Planning & Zoning Commission Page 2 of 4 Meeting Date, 2015 Revised Small Area Map to depict realigned Brewster Drive Planning & Zoning Commission Page 3 of 4 Meeting Date, 2015 DEVELOPMENT HISTORY Annexation: June 21, 1995 Zoning: A-O Agricultural Open (upon annexation) A-O Agricultural Open and R-1 Single -Family Residential (2008) PDD Planned Development District (2013) Preliminary Plan: Approved February 6, 2014 Site Development: Vacant COMMENTS Parkland Dedication: The Preliminary Plan included 1.386 acres for Neighborhood Parkland Dedication, which was approved by the Planning and Zoning Commission at the February 6, 2014 meeting. Phase One is dedicating 1.247 acres out of the 1.386 total acres of required Neighborhood Parkland for the residential subdivision. Parkland Development fees are not required for this specific lot because it is CSISD Elementary School #9, which is a non-residential use. Greenways: No greenway dedication is required or proposed. Pedestrian Connectivity: Six foot sidewalks will be constructed along both sides of all proposed residential streets. Sidewalks on the school property will be ten feet. Sidewalks are also proposed in the Thoroughfare Plan for W.S. Phillips Parkway and will be constructed in the future. Bicycle Connectivity: Bicycle lanes are proposed in the Thoroughfare Plan for W.S. Phillips Parkway and will be constructed in the future. Impact Fees: The subject property is located within the Spring Creek Sanitary Sewer Impact Fee Area: $98.39/Living Unit Equivalent. REVIEW CRITERIA Compliance with Subdivision Regulations: The proposed Final Plat is in compliance with the Preliminary Plan and Subdivision Regulations contained in the Unified Development Ordinance. STAFF RECOMMENDATIONS Staff recommends approval of the Final Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Final Plat Planning & Zoning Commission Page 4 of 4 Meeting Date, 2015 CITY OF COLLEGE STATION FINAL PLAT for Bridgewood Subdivision, Phase 1 14-00900049 SCALE: One institutional lot, one common area, and one city park on 29.633 acres LOCATION: 2985 Barron Cut -Off Road ZONING: PDD Planned Development District APPLICANT: BCS Development Co., part owner with College Station I.S. D. PROJECT MANAGER: Mark Bombek, Staff Planner mbombek@cstx.gov RECOMMENDATION: Staff recommends approval of the Final Plat Planning & Zoning Commission Page 1 of 3 May 7, 2015 DEVELOPMENT HISTORY Annexation: 1995 Zoning: A-O Agricultural Open (upon annexation) R-1 Single -Family Residential 2008 PDD Planned Development District 2013 Preliminary Plat: Approved in 2014 Site Development: Vacant COMMENTS Parkland Dedication: 1.349 acres of land was identified for dedication with this phase with the Preliminary Plan, which was approved by the Planning and Zoning Commission at their February 6, 2014 meeting. Greenways: No greenway dedication is required or proposed. Pedestrian Connectivity: Sidewalks will be constructed along both sides of all proposed residential streets, including Brewster, which is being built to a minor collector standard. Sidewalks are also proposed in the Thoroughfare Plan for W.S. Phillips Parkway, a proposed 4-lane major collector, and will be constructed in the future. Bicycle Connectivity: Bike lanes are proposed in the Thoroughfare Plan for W.S. Philips Parkway, but not along Brewster Drive. Impact Fees: The subject property is located within the Spring Creek Sanitary Sewer Impact Fee Area: $98.39/ Living Unit Equivalent. REVIEW CRITERIA Compliance with Subdivision Regulations: The proposed Final Plat is in compliance with the Subdivision Requirements contained in the Unified Development Ordinance. STAFF RECOMMENDATIONS Staff recommends approval of the Final Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Final Plat Planning & Zoning Commission Page 3 of 3 May 7, 2015