Loading...
HomeMy WebLinkAboutStaff Comments(_ 4IW4� CITY OF COI7.F.GF. STATION Home ofTe A&M Unioeaity' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: FROM: Jason Schubert, AICP, Principal Planner SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP) - Final Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11 "x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal(cDcstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Case file #14-00900049 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 2 Project: BRIDGEWOOD SUBDIVISION PH 1 (FP) - 14-00900049 PLANNING 1. Revise General Note 1 B to provide the volume and page of the deed to CSISD. 2. Revise General Note 1 D to change the project number from 12-238 to 13-238. 3. Depict the recorded TxDOT access restriction along William D. Fitch Parkway that caused Brewster Drive to realign and label with volume and page of that document(s). 4. Please note that the previously comments related to providing HOA creation documents along with the division of the 13+/- acre tract with volume and page still would be needed for the plat to be filed. 5. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Jason Schubert Date: June 19, 2014 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTIO SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(cD-cstx.gov LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS Developer installs conduit per CSU specs and design. CSU will provide drawings for electrical installation. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date:3/12/14 ENGINEERING COMMENTS NO. 2 1. (Repeat) Please provide a cost estimate, Letter of Acknowledgment, NOI, sanitary sewer plan & profile drawings, detention pond drawing, traffic control plan, Tx DOT permit application, water report, sewer report, and drainage report. Please submit an NOI, revised cost estimate, revised TxDOT permit application, and revised drainage report. 2. (Repeat) Plat - The boundary does not appear to close. It appears that a call is missing between L10 & L11 on the drawing. 3. (Repeat) C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the end of this property and Barron Rd. 4. (Repeat) C3.1-3.5 - Label the ADA sidewalk ramps. 5. (Repeat) C3.5 - Please show the decel lane on SH 40. 6. (Repeat) C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should continue to the west (rather than turning to the north as previously discussed), cross WS Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut -Off Rd. street until it connects to the existing 12-inch stub out on the east side of Barron Rd. As previously discussed, this connection will be eligible for Oversized Participation and should be reflected in the OP request and supporting documents. 7. (Repeat) C5.3 - A handrail should be provided along the sidewalk at the culvert crossings. 8. (Repeat) C6.1 - Please show and label all street & regulatory signage. Provide locations of street signs including street names and block numbers. 9. (Repeat) FYI ... The balance of the Development Permit Fee, equivalent to 1% of the total public infrastructure costs, will be due prior to issuance of the Development Permit. 10. Plat - Please revise Note #3 to show Parkland Dedication as 1.349 Ac. rather than 1.247 Ac. 11. Water Report - Please verify how the 0.5 gpm per residence and that specific C coefficient were derived. 12. Water Report - The model in the report is dual fed from the 12-inch along WS Phillips & the 8-inch along WD Fitch, however the plans only show a single connection with the 12-inch. How does this effect velocities and pressures? 13. Water Report - Please provide a model run that includes peak demands plus fire flow. 14. C1.1 - Please show the waterline connection along WD Fitch at Victoria and at Barron & WS Phillips. 15. C4.1 - Sta. 0+61.32-Should the 8x13 coupling referenced be an 8x12? Also, please show the second 12-inch gate valve in profile. 16. C4.1 - Please provide profile for 8-inch waterline crossing WS Phillips. 17. C4.1 - Based on the street classification, there should be encasement for water mains crossing WS Phillips. 18. C5.6 - FYI ... A separate building permit will be required for the retaining walls exceeding 24- inch in height. 19. C5.6 - Label the flowlines at the inlet and outlet structures and flumes. 20. Drainage Report - Provide hydraulic gradelines, hydrographs, spreadsheet showing the sizing of the culverts crossing WS Phillips Pkwy., velocities in/out of the ponds, and cross- section details of pond outfalls. 21. Drainage Report - Clearly label the 100-yr WSE and emergency spillway elevations for each pond on the plans and in the drainage report. Also, verify that these values match on the plans and in the report. 22. Drainage Report - Update the 23. Drainage Report - Exhibit A- area(s). 24. Drainage Report - Exhibit B- WS Phillips should be larger. roughness coefficients in Appendix D. Verify that all of WS Phillips Pkwy. is included in a drainage looks like the drainage area for the culverts crossing under 25. Drainage Report —Exhibit C-1- Update the flow path lengths. 26. Drainage Report — Exhibit C-3 shows that the maximum pipe velocity has been exceeded. Please use a larger pipe. 27. Drainage Report — Please update Exhibit B to include Drainage Areas 27.1, 40, and 41, as shown in Exhibit C-1. 28. Drainage Report — Exhibit C-2- Update the table to include velocities within the streets. 29. Drainage Report — Please revise the wet pond detail in Exhibit E-1 to reflect this project. Also, include this detail drawing in the plans. 30. Drainage Report — FYI ... Since the pond is along the creek, it may need to meet construction and design criteria for dams as required by TCEQ. Reviewed by: Erika Bridges Date: 5/22/14 ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension 1. Please submit an engineer's cost estimate. 2. Show the proposed location of the power poles. 3. Please specify a construction joint at the terminus of the median where the City's project will start. 4. On the eastern portion of the median, Fire has requested that lay -down curb be used to make it easier to maneuver the truck through this area. 5. Per Danielle Singh, Transportation Planning Coordinator: a. C4.1 — The double 4" stripe at the east end of the median should be yellow rather than white. b. C4.1 — Please label the diagonal striping at the east end of the median similar to previously approved plans. c. C5.2 — FYI ... TxDOT will need to approve the signage along Wellborn prior to installation. Reviewed by: Erika Bridges Date: 12/11/14 ENGINEERING COMMENTS NO. 1 1. Please provide a cost estimate, Letter of Acknowledgment, NOI, sanitary sewer plan & profile drawings, detention pond drawing, traffic control plan, TxDOT permit application, water report, sewer report, and drainage report. 2. FYI ... Since this was a preliminary submittal, we understand that there are still minor revisions that will need to be made prior to the final set of plans (i.e. table of contents, vicinity map, missing text, etc). 3. Plat - The boundary does not appear to close. 4. Plat - Please reverse the directions for lines L12, L13, and L14 (i.e. NW to SE). 5. C2.1 - Please add inlet protection to all proposed inlets along WS Phillips. 6. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS Phillips Pkwy. and Barron Cut -Off Rd to the south. 7. C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the end of this property and Barron Rd. 8. C3.1 - Per the TIA, there should be a west -bound right turn decel lane at the intersection of WS Phillips Pkwy. and Barron Cut -Off Rd. 9. C3.1-3.5 - FYI... Culvert sizing will need to be verified in the drainage report. 10. C3.1-3.5 - Show and label the right-of-way and existing/proposed easements. 11. C3.1-3.5 - Label the ADA sidewalk ramps. 12. C3.2-3.4/Plat - Show the sidewalk on the school property and the associated Public Access Easement. FYI... The PAE will need to be shown on the plat or dedicated via separate instrument. 13. C3.5 - Please show the decel lane on SH 40. 14. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should continue to the west (rather than turning to the north as previously discussed), cross WS Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut -Off Rd. street until it connects to the existing 12-inch stub out on the east side of Barron Rd. As previously discussed, this connection will be eligible for Oversized Participation and should be reflected in the OP request and supporting documents. 15. C4.1 - Valves should be located every 800-ft. 16. C4.1,4.5 - Please provide at least 12-inch of clearance between storm pipes/culverts and waterlines. 17. C4.2 - Two valves should be added at the tee at Sta.263+64.71. 18. C4.3-4.6 - Install blow -offs at each dead-end line for future streets. 19. C4.1-4.6 - Please show proposed fire hydrants in accordance with the Preliminary Plan. 20. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way or PUE. FYI... Please add additional PUE to plat if needed. 21. C4.4 - The 8-inch waterline along Brewster Dr. near SH 40 should loop to the east as shown on the Preliminary Plan. Also, this waterline needs to be within an easement or the right-of-way. 22. C4.5 - Provide two valves at each tee. 23. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep. 24. C4.6 - Add the referenced Inset "F detail to the sheet. 25. C5.1 - Where there is less than 2-ft of cover over the storm sewer, please use Class IV RCP rather than Class III. 26. C5.1 - The downstream ouffall should daylight or be extended with this phase rather than plugged. 27. C5.2-5.3 - Please match pipe soffits. 28. C5.3 - Please note that the culverts should be left with adequate tongue/groove fittings in order to accommodate their extension with the future construction of the other half of WS Phillips Pkwy. 29. C5.3 - A handrail should be provided along the sidewalk at the culvert crossings. 30. C5.4 — FYI... Culvert #1 appears to be a critical drainage design element to be looked at further with the drainage report. We have initial concerns about the grate inlet capacity and impacts to the road. 31. C6.1 — Add stop bar on Barron Cut -Off Rd. 32. C6.1 — Please add show and label all street & regulatory signage. 33. C6.1 — FYI... Danielle Singh, Transportation Planning Coordinator, is still reviewing the pavement markings and will send comments separately. 34. C6.1 — Stripe WS Phillips for the west -bound left turn lane at the Barron Cut -Off Rd. intersection and stripe portion of future east bound lane on WS Phillips (similar to how it was striped in Castlegate II). 35. FYI ... The balance of the Development Permit Fee, equivalent to 1% of the total public infrastructure costs, will be due prior to issuance of the Development Permit. 36. FYI ... The public infrastructure will need to be built or surety provided for it prior to the final plat being scheduled for a P&Z meeting. Reviewed by: Erika Bridges Date: 3/13/14 Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Once all comments have been addressed and the following information submitted, your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; and Two (2) revised copies of construction documents. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.csb(.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments STAFF REVIEW COMMENTS NO. 1 Project: Bridgewood Subdivision Ph 1 (Fp) (14-00900049) PLANNING 1. Provide documentation to verify the remaining 15 acres (proposed Suburban Commercial and Townhome areas) of the 75 acre tract has been subdivided from the parent tract. 2. A representative from the school will need to sign pages 4 and 5 of the Final Plat application because they now own the property. 3. Provide an updated Title Report or a deed showing ownership of a portion of the property has transferred to CSISD. 4. Revise the title block to include the lot and block number for the plat. 5. Revise the notary portions of the Certificates of Ownership and Dedication to remove references to plural tense (person(s), whose name(s), is/are, he/they). 6. Remove the Certificate of City Planner, as this is not a Minor Plat. 7. Provide a note stating this subdivision is zoned PDD. Also, add the ordinance number 2013-3512 and Revised PDD Concept Plan Project number 12-238 for future reference purposes. 8. Tie the subdivision to an established corner monument and label it on the plan. 9. As a reminder, it will be necessary to provide legal documentation establishing the HOA prior to filing the Final Plat. 10. Since Brewster Drive is included in Phase 1, add a note stating which Residential Parking Option that will be utilized to meet the requirements for "Single -Family Residential Parking Requirements for Platting." Brewster Drive would meet the requirements to use the "Wide Streets" option or "Parking Removal with Platting". 11. Add a note stating this property lies within the Spring Creek Sanitary Sewer Impact Fee Area. 12. Revise the plat to include the park connection from Dunlap Loop that falls between the residential lots. 13. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 14. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Teresa Rogers Date: March 12, 2014 TRANSPORTATION 1. The crosswalk bars should be specified to be 2' in width and 8' across (as shown). 2. The white strips delineating the cross hatch markings should be 4". 3. Regulatory signs will be installed by the City and do not need to be shown on these plans. 4. On striping area 5, the hatching should not extend around the radius onto Barron Cut - Off. Please bring the curve back to be even with the edge of pavement on Barron Cut- off. 5. Please be consistent with the use of a secondary turn arrow. Two arrows is preferable on the left turn lanes, but one is sufficient due to the length. 6. FYI -As discussed previously, sight triangles will need to be looked at with the final plats of subsequent phases. Obstructions will need to be eliminated to preserve sight distance along Brewster. Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 6/17/14 TRANSPORTATION 1. Double yellow striping should extend along the length of W.S. Phillips Parkway and Brewster Drive. Striping should be 4" Double Yellow Type I with RRPM Type II -A -A. 2. White striping should be 8" white Type I with RRPM Type 1-C. 3. For turn lanes, a turn arrow should be located 32' from the end of the white stripe (measured longitudinally from the edge closest to the driveway or intersection) followed by an "ONLY" symbol 32' from the edge of the arrow. 4. Please add details to show dimensions. This should include lane widths, taper lengths and storage lengths. 5. Please specify that the crosswalks are a minimum of 6' wide. 6. The 6' dashed stripe along the taper section of the decel lane for the parent driveway is not necessary. 7. Straight arrows are not required. 8. Please remove note 3. Symbols and text should be the standard size. Please revise note 2 to correspond with comments 1 & 2 above. 9. The direction on the diagonal crosshatch markings should be switched. 10. The diagonal cross hatch markings should be 8" Yellow Type 1. The outline of the striped median should be 4" Double Yellow Type 1. Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 3/19/2014 ENGINEERING COMMENTS NO. 3 (Repeat) C3.1-3.5 — Label the ADA sidewalk ramps. Please reference the appropriate City Standard Detail. (Repeat) C5.3 — A handrail should be provided along the sidewalk at the culvert crossings. Please specify handrail on C5.3 and provide a detail. (Repeat) C6.1 — Please show and label all street & regulatory signage. Provide locations of street signs including street names and block numbers. (Repeat) Water Report — Please verify how the 0.5 gpm per residence and that specific C coefficient were derived. Please note the number of residential connections being assumed. (Repeat) Water Report — The model in the report is dual fed from the 12-inch along WS Phillips & the 8-inch along WD Fitch, however the plans only show a single connection with the 12-inch. How does this effect velocities and pressures? Revise P28 & P31 to 12-inch rather than 10-inch waterlines. (Repeat) Drainage Report— Update the roughness coefficients in Appendix D. (Repeat) Drainage Report — Provide hydraulic gradelines, hydrographs, spreadsheet showing the sizing of the culverts crossing WS Phillips Pkwy., velocities in/out of the ponds, and cross-section details of pond ouffalls. Some of the 10-yr and 100-yr hydraulic gradelines appear to exceed maximum allowable elevations. Also, please provide velocities in/out of the ponds. C5.6 — The "C-C" cross sectional detail is labeled as "B-B." 9. Drainage Report — Please provide a clarification as to why the 100-year post -development Q at Point A is so much larger than the 100-yr post -development Q coming out of Pond #2. 10. Drainage Report — Please verify that a 12-ft wide area at the center of the streets is left clear during the 10-yr storm. 11. Drainage Report — Please update Exhibit C-1, C-2 since Exhibit B was updated. 12. Drainage Report — Exhibit B — Are the acreages for DA 2 & 3 both 2.59 Ac.? If so, Exhibit C-3 has the wrong acreages listed. This looks like it may impact inlet and pipe sizes. 13. Drainage Report — Exhibit C-1 — Please verify that the 100-year intensities are accurate. 14. Drainage Report — Exhibit C-1 — The acreages for DA 2, 3, 4A, and 4B don't match the acreages provided in Exhibit B. 15. Drainage Report — Exhibit C-2 — A 15-ft inlet is specified in the table, but Sheet C5.3 still only shows a 10-ft inlet. 16. Drainage Report — Exhibit C-2 — It looks like DA 2 has carry over drainage. Shouldn't this be reflected in the Total Q at Inlet for DA 3? 17. Drainage Report — Exhibit C-2 — Why is there 2-ft of ponding at DA 23? How is that going to effect the adjacent lots if the grate inlet clogs? 18. Drainage Report — Exhibit C-2 — Where are the missing DA's (i.e. 4A, 15A, 24A, 28A, etc.)? Where are the Q's from these DA's accounted for? 19. Drainage Report — Exhibit C-3 — Where do the values for Inlet #1 come from? They don't seem to link to values provided in any other tables. Also, where is the 4x4 box located? 20. Drainage Report — Exhibit C-3 — The Inlet Numbers, Total CA, Tc, Lengths, and Unadjusted Design Flows need to match on Plans and Exhibit C-1. 21. Drainage Report — Exhibit C-3 — Please add the actual pipe slope from the plans. 22. Drainage Report — Exhibit C-3 — The note regarding the Adjusted Design Flow indicates a 33% adjustment, but it looks like there was actually a 30% adjustment. 23. Drainage Report — Exhibit C-4 & 5 — Please submit revised Exhibits C-4 & C-5 per previously emailed comments. 24. Drainage Report — Exhibit C-6 & 7 — In the Culvert and Ouffall Channel Design tables, the Slopes, Bottom Widths, and Top of Road elevations should match the plans. 25. Drainage Report — Exhibit C-6 & 7 — The Mannings Coefficient for the outfall channel is higher than the range of acceptable values in Table C-10 of the Design Guidelines. 26. Drainage Report — Exhibit C-6 & 7 — Since WS Phillips Pkwy. is a major collector, the upstream headwater elevation at each culvert is required to be at least 1-ft below the top of curb. 27. Drainage Report — Exhibit C-6 & 7 — Culvert #2 should have flared wing -walls at the entrance since it is accepting flow from a channel that is not well defined. Reviewed by: Erika Bridges Date: 5/22/14 MEMORANDUM June 26, 2014 TO: Randy French, BCS Development Co., via: rfrench(a)stylecraftbuilders.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP) - Final Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat; and Two (2) revised copies of construction documents. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. hftp://www.Gstx.4ov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: J. Dale Browne, Jr. P.E., McClure & Browne; via: daleb(a).mCClurebrowne.com P&DS Project No. 14-00900049 Planning &De elapment Servfres I'.O. 90\ 9%0 - I107 CI=.\AS. rat; tT. C0 I F(F S r.A]10N • TT\,ai . -,7g42 TEL 979.764.3570 • FA\. 979.764.3496 cstx.gov/devservices f fo Z -&arum mau Tdlgj (-oa u p1g4i ruoa pun •.Tr' aq1 o11uo palnrod uaaq 1ou anv(l mqj nold amqj uo nFunga jmorlrppn fuy ruot<(luafuo „palggrr2, pun salla77u11:ruruoll lxau mo,fue paur�dxa aq lnrui •uopvIS, gJep-)fo ,qr) aqi 4fq palraubal uaaq Jou anoq xgl'rurgr[aqi o1 apaur raPuraga Firy :gyoA( ,8;!q!gx3 u1 pap!nad sebeejoe aq; go;ew ;,uop 8ti pue 'yti '£ 'Z va jo; sabeajoe eql — 6-O ;!glgx3 — uodad abeu!ejo -til, -a;emooe eje sa!;!sua;u! jean(-00l, ay;;eq; fjuan aseald — L-0;iq qx3 — podad a6euleja £ 6 -sezls adld pue ;alul;oedwl lew;l a>Iq s� ool sigl -pa;sll sa6eajoe buann aq; seq £-0 ;!q!gx3'os A L,OV 657 gloq £ '8 Z bo jo; sabeajoe aq; ajH — 8 1!q!gx3 — }jodad a6euleja -Z 6 'pa;epdn Senn 8;!q!gx3 aouls Z-0 ' L-0;!q!gx3 a;epdn aseald —jjodad a6euleja -L 6 'wJo;S Jl-06 aq; 6uunp Jealo uai Si s;aa;S aq;;o Ja;uao aq;;e ease apinn g-Z 6 e;eg; A;uan aseald — ljodad abeupa 01, 'Z# puod;o;no 6u!woo O;uawdolanap-;sod jA-00t, aq; ueq;jabjel gonw os sl d;u!od le O;uawdolanap-;sod jeGA-00I, aq; Agnn o; Se uol;eol;uelo e apinad aseald — }jodad a6euMG -6 8 8„ se palagel sl pe;ap lemmas ssao „0-0„ agl— 9,90 '8 •spuod aq;;o;no/ul sal;Iaolan apino.id aseald 'osly -suol;enala aigennolle wnwlxew paeoxe o; jeadde soullapeA ollnejpAtI A -poll, pue A-0I aq; ;o awoS -sllepno puod ;o slle;ap uolpas-ssao pue spuod aq;;o;no/ul sagloolan '-Amd sdll!!gd SM 6UISSao s}19nlno ay;;o 6u!zls aq; buimogs ;aagspeajds 'sgdej6apAq 'sau!lapei6 olineipAq apinad — uodad 96eu!eja (;eadad) •a x!puaddy ul s;ualolg000 ssaugbna aq; a;epdn —podad a6eu!ejo (;eadad) -g •saullJa;enn gout-06 ueq; M41W VU1-U 0; 4£d 19 8Zd aslnab Zsamssajd pue sal;loolan;oa};a sM saop nnoH 'goul-Zl, aq; q;inn uol;oauuoo a16uls a nnogs Aluo sueld ay; Janannoq '40;!3 aM 6uole gout-g ag;Q sdlll!gd SM 6uole gout-Zl, ay; won; pa; lenp sl IJodai aq; ui lapow aql — IJodad ja;eM (;eadad) g -pawnsse 6waq suol;oauuoo Iel;uaplsaj ;o jagwnu ag; a;ou aseald -panuap mono ;ualo!#aoo 0 ogipads ;eq; pue aouapsaj jad wd6 9-0 aq; anoq 4!JGA aseald — jjodad ja;eM (;eadad) ti -saagwnu 3/oo/q pue saweu;aai;s Bu;pnpui su8;s jewis jo suopeoo/ ap;noad -abeu6ls do;eln6aj g;aa;s Ile lagel pue nnogs aseald — S-gO (;eadad) £ 'Ile;ap a apinojd pue 5,90 uo Ilejpueq A;loads aseald sbulssao 1janlno aq;;e Nlennap!s aq; 6uole pap!Aad aq pinogs I!ejpueq y — £ 40 (;eadad) -Z 'Ile;aO pJepue4S A;10 a;eudo.idde ag; aouejejej aseald sdwej �lennapls V(]V ay; lage-I — 9'£-6'£O (;eadad) .` EJNIN33NIJN3 tiLOZ `6l, aunt :a;ea pagngoS uosep :Aq panna!AeN ;eld inoA;o bu!lg ay; o; joud ;uaimo;ou we Aeq;;! sa;eol;l}iao xe; pied;lwgns o; pambai aq Aew nol;eg; a;ou aseald '9 -palg eq o;;eld eq; jo; papeeu aq pinonn figs abed pue awnlon q;lnn;oeJ; aloe -/+gl ag;;o uolsln!p aq; q;!nn 6u01e s;uewnoop uol;eao VOH 6uip!Aad o; pa;elaj s;uawwoo Rlsnolnajd ay; ;eq; a;ou aseald 'ti :(s);uawnoop;eq;;o abed pue awnlon q;!M lagel pue u6!leaJ o; anua Ja;SMGle pasneo;eq; lenn>Iaed q01ld 'a wEIIHAA buole uogou;saJ ssaooe 1paxl papJooaj aq;;oldao £ '8£Z-£6 0; 8£Z-Z 6 wa; jagwnu;oafad ag; a6ueyo o; a L a;oN le'auaO apinad -Z 'aSISO o; peap aq;;o abed pue awnlon ay; apinad o; El I, a;oN leJauaO as!nad ' I, EJNINNV Id 6ti000600-1176 - (dd) I, Hd NOISIAIGenS a00M3Jald8 :;oafad Z 'ON S1N31AIW00 M31A3N ddd1S STAFF REVIEW COMMENTS NO. 1 Project: Bridgewood Subdivision Ph 1 (FP) (14-00900049) PLANNING 1. Provide documentation to verify the remaining 15 acres (proposed Suburban Commercial and Townhome areas) of the 75 acre tract has been subdivided from the parent tract. 2. A representative from the school will need to sign pages 4 and 5 of the Final Plat application because they now own the property. 3. Provide an updated Title Report or a deed showing ownership of a portion of the property has transferred to CSISD. 4. Revise the title block to include the lot and block number for the plat. 5. Revise the notary portions of the Certificates of Ownership and Dedication to remove references to plural tense (person(s), whose name(s), is/are, he/they). 6. Remove the Certificate of City Planner, as this is not a Minor Plat. 7. Provide a note stating this subdivision is zoned PDD. Also, add the ordinance number 2013-3512 and Revised PDD Concept Plan Project number 12-238 for future reference purposes. 8. Tie the subdivision to an established corner monument and label it on the plan. 9. As a reminder, it will be necessary to provide legal documentation establishing the HOA prior to filing the Final Plat. 10. Since Brewster Drive is included in Phase 1, add a note stating which Residential Parking Option that will be utilized to meet the requirements for "Single -Family Residential Parking Requirements for Platting." Brewster Drive would meet the requirements to use the "Wide Streets" option or "Parking Removal with Platting". 11. Add a note stating this property lies within the Spring Creek Sanitary Sewer Impact Fee Area. 12. Revise the plat to include the park connection from Dunlap Loop that falls between the residential lots. 13. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 14. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Teresa Rogers Date: March 12, 2014 ENGINEERING COMMENTS NO. 1 1. Please provide a cost estimate, Letter of Acknowledgment, NOI, sanitary sewer plan & profile drawings, detention pond drawing, traffic control plan, TxDOT permit application, water report, sewer report, and drainage report. 2. FYI... Since this was a preliminary submittal, we understand that there are still minor revisions that will need to be made prior to the final set of plans (i.e. table of contents, vicinity map, missing text, etc). 3. Plat — The boundary does not appear to close. 4. Plat — Please reverse the directions for lines L12, L13, and L14 (i.e. NW to SE). 5. C2.1 — Please add inlet protection to all proposed inlets along WS Phillips. Sa:1LUaSAap/A03')gs:) 96Fc—.�9L'6Lti'XVA- 05 9L'6-�6 TM Z;-SLL • SNX7:L - Sk'X3.1- IOi: • 0966Xc�k7'O'<i aarua�rauaurdojoaa�j,y &exxcuv�xj 6117000600-46 'ON loafed S(]'8d woo'aumaclanloow galep :eiA'auma8 �R ajnlOoW ''3'd 'a[• 'auma8 ale(] T :Od sluawwoo MalA9�j 11e1S :sluawyoelly '0L9E'ti9L'6L61e aw ileo aseald 'uogemolul leuogippe paau jo suogsanb AUe aney noA 11 'geld eql to 6upg aql of joud pue lenadde Z'8d gage paimbai aq llim geld leug pasina aql 10 leuw6uo jeIAVj a legl alou aseaid z /Ao 'x1sO'MMM// Rq '6u1198w Z 8d aql to >laam aql AepuoIN uo aps clam 6ulmollol aql le passaooe aq ueo �jodaj 11els pue epua6e ayl '6ugaaw ZWd eql jol palnpagos uaaq seq wall jno! aouo 'pled seal aleudadde eql pue apew uaaq aney suolslAaj aql Ile aouo epuabe ajnlnl e uo paoeld aq Aew loafed ino,, Bugaaw uoissiwwoo 6uluoZ �R 6uluueld a jol palnpagos aq lou illm loefaad jno! passaippe uaaq lou aney sluawwoo Ile 11 'ulaaq paweluoo sluawwoo MalAaj }gels aql ssaippe of >laas legl iolejlsiuiwpy aql of sluawnoop pasmai pue sluawwoo asuodsai uaguM pap!Aad lou seq lueoildde a4111 `owaw slgl to alep aql wag sAep 06 ui ajidxa IIlm uogeoildde sigl legl alou aseald 'uo11e1S 9691103 10 40 aql gllm Pan Allewiol pajaplsuoo aq Illm loafed inoA '6ugaaw 6uluoZ V 6uluueld eql jol sluawnoop pannbei aql to ldlaoaj uodn 'sluawnoop uoilonulsuoo 10 seidoo paslAa (Z) oMl pue 'geld leug paslnaj aql to /doo „ggx„yZ (l.) auo 'anueAv sexal 60I, I, 'sjagwego llounoO PH 40 aql ul play 6wlaaw uolsslwwoO 6uluoZ pue 6uluueld algellene veu aql uo paoeld aq lllm loafed ino! 'pal}iwgns uogewjolw bulmollol aql pue passaippe uaaq aney sluawwoo Ile aouo 'passajppe aq of paau legl swan 6uilpjap sluawwoo MalAa gels to lsil e s1 abed Bumollol aql 'palsenbei se geld leug pauoguaw-anoge aql paMalAaJ gelS (dd) t Hd NOISIAIO8f1S OOOm3JOR19 aO3f8f1S Jauueldlgels'sJa6oaesaal :WO2id woo 'sJapI!ng4ejoal s gouaip :elA `-oo luawdolana(] SO8 'gouaid 1pueb :Ol Wf1OMdUOW3W ,K011V LS U-)TnCID 30 xsiD �r' 6. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS Phillips Pkwy. and Barron Cut -Off Rd to the south. 7. C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the end of this property and Barron Rd. 8. C3.1 - Per the TIA, there should be a west -bound right turn decel lane at the intersection of WS Phillips Pkwy. and Barron Cut -Off Rd. 9. C3.1-3.5 - FYI... Culvert sizing will need to be verified in the drainage report. 10. C3.1-3.5 - Show and label the right-of-way and existing/proposed easements. 11. C3.1-3.5 - Label the ADA sidewalk ramps. 12. C3.2-3.4/Plat - Show the sidewalk on the school property and the associated Public Access Easement. FYI... The PAE will need to be shown on the plat or dedicated via separate instrument. 13. C3.5 - Please show the decel lane on SH 40. 14. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should continue to the west (rather than turning to the north as previously discussed), cross WS Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut - Off Rd. street until it connects to the existing 12-inch stub out on the east side of Barron Rd. As previously discussed, this connection will be eligible for Oversized Participation and should be reflected in the OP request and supporting documents. 15. C4.1 -Valves should be located every 800-ft. 16.C4.1,4.5 - Please provide at least 12-inch of clearance between storm pipes/culverts and waterlines. 17. C4.2 - Two valves should be added at the tee at Sta.263+64.71. 18. C4.3-4.6 - Install blow -offs at each dead-end line for future streets. 19.C4.1-4.6 - Please show proposed fire hydrants in accordance with the Preliminary Plan. 20. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way or PUE. FYI... Please add additional PUE to plat if needed. 21. C4.4 - The 8-inch waterline along Brewster Dr. near SH 40 should loop to the east as shown on the Preliminary Plan. Also, this waterline needs to be within an easement or the right-of-way. 22. C4.5 - Provide two valves at each tee. 23. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep. 24. C4.6 - Add the referenced Inset "F" detail to the sheet. 25. C5.1 - Where there is less than 2-ft of cover over the storm sewer, please use Class IV RCP rather than Class 111. 26. C5.1 - The downstream outfall should daylight or be extended with this phase rather than plugged. 27. C5.2-5.3 - Please match pipe soffits. 28.C5.3 - Please note that the culverts should be left with adequate tongue/groove fittings in order to accommodate their extension with the future construction of the other half of WS Phillips Pkwy. 29. C5.3 - A handrail should be provided along the sidewalk at the culvert crossings. 30.C5.4 - FYI... Culvert #1 appears to be a critical drainage design element to be looked at further with the drainage report. We have initial concerns about the grate inlet capacity and impacts to the road. 'nS0 !q pau6!sap se bugna;!npuoo pue 'suo!;eool ja;aw lie 'sjeeBgo;!Ms jo 'saxoq IInd 'sjewjo;suej; .9'1 'aowas leou;oala ap!naid o; luessaoau sa!;!l!oe; leou;oala pasodad Ile Mogs ;snw ueld a;!s leu!d '9 Y1S0 Aq Pap!nad sle;sapad tiepuooas pue saxoq pnd 'u6!sap pue soads [>S0 jad sle;sapad tiepuooas pue saxoq Ilnd spe;su! jedol9na4 I_ -u6!sap pue soads f180 jad 'ao!nap jag;o jo 'saxoq llnd 'sjewjo;suei; 'a'! 's6u!;oo; jo sped ao!nap ou;oala sinod jadolanap '9 ;noAel leou;oala f1S0 uo umogs se;!npuoo pe;sui pue gs!wn; II!M jadolanap 'saolnap 6ugSlxa Jag;o Jo JawJo}SueJj pa;eu6!sap;e;slxaIOU saop;mpuoo A 'S pannbei se puaaxa pue saolnap 6ul;slxa jag;o jo siewjo;sue„ pa;eu6!sap;e;!npuoo 6ugs!xa;daoia;u! II!M jadolana4 •t7 'jasu spe;su! f1S0 •;mpuoo jesu qoea jo;;!npuoo 0WI jo p!6u;o ,p£ sap!nad aadolanaa .£ 'uogelle;sul leou}oala Jo; SOUIMeJp ap!nad p!M f1S0 'Z -u6!sap pue soads f1S0 jed;!npuoo spe;su! jadoianap ' 6 S1N3WW00 IVIOIU10313 1VN3N3J -sauepunoq;uawasee u!q;!m palle;sw s! ain;onu;sei;ui leoupala;eg; ainsui o; a;!s uo s;uawasee 6u!;eool jo; alq!suodsai aq II!m jadolanap ag; '6ugSlxa are s;uawasea bl -9 -ueld a;!s jo;eld uo uMogs se '[>S0 Aq pau6!sap se ainprulsei}ui ou;oala jo; s;uawasea angduosap sap!nad jedoianap :S1N3W3SV9 '9 s;uawasea 6ul;s!xe u!g;!M pau6!sap aq II!nn sagg!oe; ou;oa13 -6ugs!xe aie a;!s uo s;uawasea IIV :S1N3W3SV3 '17 -nS0 Aq pau6!sap se ain;onu;sei;u! ou;oala Jo; S;uawasea angduosap ap!noid;snw;oefad;o uogaldwoo uodn pue sasodmd uo!;onu;suoo jo; ;uawasea ;a� uelq tiejodwa; sap!nwd jadolanaa :S1N3W3SV3 '£ -sNaaM 9Z a;ew!xwdde s! �oo;s u! ;ou ;uawd!nba jag;o pue sjawo;suej; jo; aw!; /uan!Iap ';uud;oo; 6u!plmq leug aq;;oage pinoo 's;uawannbei eouejealo o; anp `pue sAelap uogonu;suoo u!;lnsai Jim e;ep peol ap!noid o; ejnl!ed ';oafoid aq; o; aowas ap!nojd o; paj!nbai ';uawdmbe jag;o pue 'sjewjo;suej;;o jagwnu pue az!s ag; au!wa;ap Ala;emooe o; nso jo; Ieoguo sl uol;ewjo;ui s!ql 'algel!ene s! ;! se uoos se f1S0 0; e;ep peol ap!nad II!M jadolanap agl :Viva aVOI 'Z no 'x;So Uo}Joga :o; I!ew3 'algel!eAe Sl;! se uoos se veld a;iS Jo / PUB lei d;o uolSJan ';ewjo; 6Mp pVOo;nV geolp a g;!M f1S0 ap!nad II!nn jedolanaa :1V7Id/NVId 91IS "I, 01IN311V 31VI03WWI JNwino321 S1N3WW001VOIN10313 b6/£6/£ :GIB(] sebpu8 e�!a3 :!g pGMGInG'c! '6u1Ia9w T&d a jo; painpagos 6u!Gq;eld leug aq} o; joud;! jo; pap!nojd )gejns jo;I!nq aq o; paeu II!M ein;ona;sm;ui o!lgnd agi*"I).d,9£ ;!waad;uawdolanaQ ag;;o aouenssi o; aoud anp aq ll!m 's;soo ain;ona;sei;ui o!lgnd le;o; ag; 10 %1, o; ;ualen!nba 'Gad ;!woad ;uawdolanap aq; ;o aousleg agl"*V.d,S£ -ill a;e6agse0 ui padu;s seM;! moq o; ael!w!s) sd!II!gd SM uo auel punoq ;sea am;n; jo uo!}iod adu;s pue uogoasia;ul 'py }}O-;n0 uajeg aq; is auel uan; }}al punoq-;sem ag; jo} sd!II!gd SM aciplS — 6'90'VS -Ala;ejedas s;uewwoo PUGS II!M pue SbUI�Jew;uawaned ag; 6uiMGlnaJ Ilgs s! 'jo;eu!pjoo0 6u!uueld uo!;elaodsueal `gbu!S apa!uep'"I ld — V90'££ abeu6!s tio;elnbej Q;aaj;s Ile laqel pue MOgs ppe aseOld — 6-90-ZE 'P2i _4O-;n0 uoaaeg uo jeq dots ppV — 6-90' LE 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date: March 12, 2014 15. Drainage Report — Exhibit C-2 — A 15-ft inlet is specified in the table, but Sheet C5.3 still only shows a 10-ft inlet. 16. Drainage Report — Exhibit C-2 — It looks like DA 2 has carry over drainage. Shouldn't this be reflected in the Total Q at Inlet for DA 3? 17. Drainage Report — Exhibit C-2 — Why is there 2-ft of ponding at DA 23? How is that going to effect the adjacent lots if the grate inlet clogs? 18. Drainage Report — Exhibit C-2 — Where are the missing DA's (i.e. 4A, 15A, 24A, 28A, etc.)? Where are the Q's from these DA's accounted for? 19. Drainage Report — Exhibit C-3 — Where do the values for Inlet #1 come from? They don't seem to link to values provided in any other tables. Also, where is the 4x4 box located? 20. Drainage Report — Exhibit C-3 — The Inlet Numbers, Total CA, Tc, Lengths, and Unadjusted Design Flows need to match on Plans and Exhibit C-1. 21. Drainage Report — Exhibit C-3 — Please add the actual pipe slope from the plans. 22. Drainage Report — Exhibit C-3 — The note regarding the Adjusted Design Flow indicates a 33% adjustment, but it looks like there was actually a 30% adjustment. 23. Drainage Report — Exhibit C-4 & 5 — Please submit revised Exhibits C-4 & C-5 per previously emailed comments. 24. Drainage Report — Exhibit C-6 & 7 — In the Culvert and Outfall Channel Design tables, the Slopes, Bottom Widths, and Top of Road elevations should match the plans. 25. Drainage Report — Exhibit C-6 & 7 — The Mannings Coefficient for the outfall channel is higher than the range of acceptable values in Table C-10 of the Design Guidelines. 26. Drainage Report — Exhibit C-6 & 7 — Since WS Phillips Pkwy. is a major collector, the upstream headwater elevation at each culvert is required to be at least 1-ft below the top of curb. 27. Drainage Report — Exhibit C-6 & 7 — Culvert #2 should have flared wing -walls at the entrance since it is accepting flow from a channel that is not well defined. Reviewed by: Erika Bridges TRANSPORTATION Date: 6/26/14 1. The crosswalk bars should be specified to be 2' in width and 8' across (as shown). 2. The white strips delineating the cross hatch markings should be 4". 3. Regulatory signs will be installed by the City and do not need to be shown on these plans. 4. On striping area 5, the hatching should not extend around the radius onto Barron Cut -Off. Please bring the curve back to be even with the edge of pavement on Barron Cut -Off. 5. Please be consistent with the use of a secondary turn arrow. Two arrows is preferable on the left turn lanes, but one is sufficient due to the length. 6. FYI -As discussed previously, sight triangles will need to be looked at with the final plats of subsequent phases. Obstructions will need to be eliminated to preserve sight distance along Brewster. Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 6/17/14 NOTE: Any changer made to the plans, that have not been requested by the City ofCallege Station, must be explained inyour next transmittal letter and "bubbled" on your plans. Any additional changes on there plans that have not been pointed out to the 0y, will constitute a completely new review. 3 of CITY OF COLLI GE STATION Home of Texas A&M Univenity' MEMORANDUM TO: Randy French, BCS Development Co., via: rfrench[a)stylecraftbuilders.com FROM: Teresa Rogers, Staff Planner SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Once all comments have been addressed and the following information submitted, your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; and Two (2) revised copies of construction documents. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. hftp://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: J. Dale Browne, Jr. P.E., McClure & Browne; via: daleb(aD_mcclurebrowne.com P&DS Project No. 14-00900049 Planning dr Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77542 TF.,I... 9-9.764.3570 -FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Bridgewood Subdivision Ph 1 (FP) (14-00900049) PLANNING 1. Provide documentation to verify the remaining 15 acres (proposed Suburban Commercial and Townhome areas) of the 75 acre tract has been subdivided from the parent tract. 2. A representative from the school will need to sign pages 4 and 5 of the Final Plat application because they now own the property. 3. Provide an updated Title Report or a deed showing ownership of a portion of the property has transferred to CSISD. 4. Revise the title block to include the lot and block number for the plat. 5. Revise the notary portions of the Certificates of Ownership and Dedication to remove references to plural tense (person(s), whose name(s), is/are, he/they). 6. Remove the Certificate of City Planner, as this is not a Minor Plat. 7. Provide a note stating this subdivision is zoned PDD. Also, add the ordinance number 2013-3512 and Revised PDD Concept Plan Project number 12-238 for future reference purposes. 8. Tie the subdivision to an established corner monument and label it on the plan. 9. As a reminder, it will be necessary to provide legal documentation establishing the HOA prior to filing the Final Plat. 10. Since Brewster Drive is included in Phase 1, add a note stating which Residential Parking Option that will be utilized to meet the requirements for "Single -Family Residential Parking Requirements for Platting." Brewster Drive would meet the requirements to use the "Wide Streets" option or "Parking Removal with Platting". 11. Add a note stating this property lies within the Spring Creek Sanitary Sewer Impact Fee Area. 12. Revise the plat to include the park connection from Dunlap Loop that falls between the residential lots. 13. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 14. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Teresa Rogers Date: March 12, 2014 ENGINEERING COMMENTS NO. 1 1. Please provide a cost estimate, Letter of Acknowledgment, NOI, sanitary sewer plan & profile drawings, detention pond drawing, traffic control plan, TxDOT permit application, water report, sewer report, and drainage report. 2. FYI... Since this was a preliminary submittal, we understand that there are still minor revisions that will need to be made prior to the final set of plans (i.e. table of contents, vicinity map, missing text, etc). 3. Plat — The boundary does not appear to close. 4. Plat — Please reverse the directions for lines L12, L13, and L14 (i.e. NW to SE). 5. C2.1 — Please add inlet protection to all proposed inlets along WS Phillips. 6. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS Phillips Pkwy. and Barron Cut -Off Rd to the south. 7. C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the end of this property and Barron Rd. 8. C3.1 - Per the TIA, there should be a west -bound right turn decel lane at the intersection of WS Phillips Pkwy. and Barron Cut -Off Rd. 9. C3.1-3.5 - FYI... Culvert sizing will need to be verified in the drainage report. 10.C3.1-3.5 - Show and label the right-of-way and existing/proposed easements. 11. C3.1-3.5 - Label the ADA sidewalk ramps. 12. C3.2-3.4/Plat - Show the sidewalk on the school property and the associated Public Access Easement. FYI ... The PAE will need to be shown on the plat or dedicated via separate instrument. 13. C3.5 - Please show the decel lane on SH 40. 14. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should continue to the west (rather than turning to the north as previously discussed), cross WS Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut - Off Rd. street until it connects to the existing 12-inch stub out on the east side of Barron Rd. As previously discussed, this connection will be eligible for Oversized Participation and should be reflected in the OP request and supporting documents. 15. C4.1 -Valves should be located every 800-ft. 16.C4.1,4.5 - Please provide at least 12-inch of clearance between storm pipes/culverts and waterlines. 17. C4.2 - Two valves should be added at the tee at Sta.263+64.71. 18. C4.3-4.6 - Install blow -offs at each dead-end line for future streets. 19.C4.1-4.6 - Please show proposed fire hydrants in accordance with the Preliminary Plan. 20. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way or PUE. FYI... Please add additional PUE to plat if needed. 21. C4.4 - The 8-inch waterline along Brewster Dr. near SH 40 should loop to the east as shown on the Preliminary Plan. Also, this waterline needs to be within an easement or the right-of-way. 22. C4.5 - Provide two valves at each tee. 23. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep. 24.C4.6 -Add the referenced Inset "F" detail to the sheet. 25. C5.1 - Where there is less than 2-ft of cover over the storm sewer, please use Class IV RCP rather than Class III. 26. C5.1 - The downstream outfall should daylight or be extended with this phase rather than plugged. 27. C5.2-5.3 - Please match pipe soffits. 28.C5.3 - Please note that the culverts should be left with adequate tongue/groove fittings in order to accommodate their extension with the future construction of the other half of WS Phillips Pkwy. 29.C5.3 -A handrail should be provided along the sidewalk at the culvert crossings. 30.C5.4 - FYI... Culvert #1 appears to be a critical drainage design element to be looked at further with the drainage report. We have initial concerns about the grate inlet capacity and impacts to the road. 31. C6.1 —Add stop bar on Barron Cut -Off Rd. 32. C6.1 — Please add show and label all street & regulatory signage. 33.C6.1 — FYI... Danielle Singh, Transportation Planning Coordinator, is still reviewing the pavement markings and will send comments separately. 34. C6.1 — Stripe WS Phillips for the west -bound left turn lane at the Barron Cut -Off Rd. intersection and stripe portion of future east bound lane on WS Phillips (similar to how it was striped in Castlegate 11). 35.FYI ... The balance of the Development Permit Fee, equivalent to 1% of the total public infrastructure costs, will be due prior to issuance of the Development Permit. 36. FYI ... The public infrastructure will need to be built or surety provided for it prior to the final plat being scheduled for a P&Z meeting. Reviewed by: Erika Bridges Date: 3/13/14 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTIO 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. 4. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. 5. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. 6. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date: March 12, 2014 (** o 007`191 CITY OF COLLEGE STATION Home of lintsAeT'M University' MEMORANDUM DATE: December 12, 2014 TO: BCS Development Co., via: rfrenchp_stylecraftbuilders.com FROM: Erika Bridges, Graduate Engineer II SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP) ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension 1. Please submit an engineer's cost estimate. 2. Show the proposed location of the power poles. 3. Please specify a construction joint at the terminus of the median where the City's project will start. 4. On the eastern portion of the median, Fire has requested that lay -down curb be used to make it easier to maneuver the truck through this area. 5. Per Danielle Singh, Transportation Planning Coordinator: a. C4.1 — The double 4" stripe at the east end of the median should be yellow rather than white. b. C4.1 — Please label the diagonal striping at the east end of the median similar to previously approved plans. c. C5.2 — FYI ... TxDOT will need to approve the signage along Wellborn prior to installation. Reviewed by: Erika Bridges Date: 12/11/14 PC: J. Dale Browne, Jr. P.E./McClure & Browne Engr. /Surv., Inc., via: daleb mcclurebrowne.com P&DS Project No. 14-00900049 ENGINEERING COMMENTS NO. 1 1. Please provide a cost estate, Letter of Ackn�edgment, NOI, sanitary sewer plan & profile drawings, detention pond drawing, traffic control plan, TxDOT permit application, water report, sewer report, and drainage report. r 2. FYI... Since this was a preliminary submittal, we understand that there ta a stiLminor revisions that will need to be made prior to the final set of plans (i.e. table of contents, vicinity map, missing text, etc). 3. Plat - The boundary does not appear to close. 4. Plat - Please reverse the directions for lines L12, L13, and L14 (i.e. NW to SE). 5. C2.1 - Please add inlet protection to all proposed inlets along WS Phillips. 6. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS Phillips Pkwy. and Barron Cut -Off Rd to the south. 7. C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the end of this property and Barron Rd. 8. C3.1 - Per the TIA, there should be a west -bound right turn decel lane at the intersection of WS Phillips Pkwy. and Barron Cut -Off Rd. 9. C3.1-3.5 - FYI... Culvert sizing will need to be verified in the drainage report. 10. C3.1-3.5 - Show and label the right-of-way and existing/proposed easements. 11. C3.1-3.5 - Label the ADA sidewalk ramps. 12. C3.2-3.4/Plat - Show the sidewalk on the school property and the associated Public Access Easement. FYI... The PAE will need to be shown on the plat or dedicated via separate instrument. 13. C3.5 - Please show the decel lane on SH 40. 14. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should continue to the west (rather than turning to the north as previously discussed), cross WS Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut -Off Rd. street until it connects to the existing 12-inch stub out on the east side of Barron Rd. As previously discussed, this connection will be eligible for Oversized Participation and should be reflected in the OP request and supporting documents. 15. C4.1 - Valves should be located every 800-ft. 16. C4.1,4.5 - Please provide at least 12-inch of clearance between storm pipes/culverts and waterlines. 17. C4.2 - Two valves should be added at the tee at Sta.263+64.71. 18. C4.3-4.6 - Install blow -offs at each dead-end line for future streets. 19. C4.1-4.6 - Please show proposed fire hydrants in accordance with the Preliminary Plan. 20. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way or PUE. FYI... Please add additional PUE to plat if needed. 21. C4.4 - The 8-inch waterline along Brewster Dr. near SH 40 should loop to the east as shown on the Preliminary Plan. Also, this waterline needs to be within an easement or the right-of-way. 22. C4.5 - Provide two valves at each tee. 23. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep. 24. C4.6 -Add the referenced Inset "F' detail to the sheet. 25. C5.1 - Where there is less than 2-ft of cover over the storm sewer, please use Class IV RCP rather than Class III. 26. C5.1 - The downstream outfall should daylight or be extended with this phase rather than plugged. 27. C5.2-5.3 - Please match pipe soffits. 28. C5.3 - Please note that the culverts should be left with adequate tongue/groove fittings in order to accommodate their extension with the future construction of the other half of WS Phillips Pkwy. 29. C5.3 - A handrail should be provided along the sidewalk at the culvert crossings. a.5 rSfi — Y2� ya r�ti4.,�5 4 -z — r t 1... M U_ 1 snf �t1 eovtvwd�uv� & dRS�h of �Critti �vr dcrya %riCR . 30. C5.4 — FYI... Culvert #1 appears to be a critical drainage design element to be looked at further with the drainage report. We have initial concerns about the grate inlet capacity and impacts to the road. 31. C6.1 —Add stop bar on Barron Cut -Off Rd. 32. C6.1 — Please add show and label all street & regulatory signage. 33. C6.1 — FYI... Danielle Singh, Transportation Planning Coordinator, is still reviewing the pavement markings and will send comments separately. 34. C6.1 — Stripe WS Phillips for the west -bound left turn lane at the Barron Cut -Off Rd. intersection and stripe portion of future east bound lane on WS Phillips (similar to how it was striped in Castlegate ll). 35. FYI... The balance of the Development Permit Fee, equivalent to 1% of the total public infrastructure costs, will be due prior to issuance of the Development Permit. 36. FYI... The public infrastructure will need to be built or surety provided for it prior to the final plat being scheduled for a P&Z meeting. Reviewed by: Erika Bridges Date: 3113114 A-1iac1el ;511'uco dam }�" �� P,n t! L�' ' t+Yvy LID i C4.1 - erd WLi' W5 Ph +Is 7i ! L.�''' L'• � y UC! C-` �J '�'� e (, �� cY�� l�Tl C.� ` l!'r �tC. i`i riti(`..��'� {-- � �'t L' 'i� J l n r DPE 0.020 — (UYI �11C�(ltiLl�a� r�1/tC�21 r1c5 .((x C -° r,-'d �` `C1C vt tou-1 exCw 1nC VL" VIJe+ (-'-�V= "A 1 R CITY OF COLLEGE STATION Home of Tee Ae.&^M Univenity` Il__1J.e_i �. DATE: December 12, 2014 TO: BCS Development Co., via: rfrench(a)stylecraftbuilders.com FROM: Erika Bridges, Graduate Engineer II SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP) ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension 1. Please submit an engineer's cost estimate. 2. Show the proposed location of the power poles. 3. Please specify a construction joint at the terminus of the median where the City's project will start. 4. On the eastern portion of the median, Fire has requested that lay -down curb be used to make it easier to maneuver the truck through this area. 5. Per Danielle Singh, Transportation Planning Coordinator: a. C4.1 — The double 4° stripe at the east end of the median should be yellow rather than white. b. C4.1 — Please label the diagonal striping at the east end of the median similar to previously approved plans. c. C5.2 — FYI ... TxDOT will need to approve the signage along Wellborn prior to installation. Reviewed by: Erika Bridges Date: 12/11 /14 PC: J. Dale Browne, Jr. P.E./McClure & Browne Engr. /Sure., Inc., via: daleb@mccl urebrowne. com P&DS Project No. 14-00900049 Planning er Development Services P.O. BOX 9960 • I101'IBXAS AVENUE • COLLEGE STATION • TEXAS - 71843 TEL. 979.764.351 •FAX. 91 .764.3496 cstx.gov/devservices a r. C?o✓hrv�,v�t 5 'NL. 14 ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension 1. Please submit an engineer's cost estimate. 2. Show the proposed location of the power poles. 3. Please specify a construction joint at the terminus of the median where the City's project will start. 4. On the eastern portion of the median, Fire has requested that lay -down curb be used to make it easier to maneuver the truck through this area. 5, FYI... Danielle Singh is still reviewing the striping and traffic control.. Reviewed by: Erika Bridges Date: 12/11/14 ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension C'" 1. Please submit an engineer's cost estimate. 2. Please show the proposed location of electric power poles. �� The apron for the residential driveway needs to be concrete per the City's standard detail. Should this DW be allowed with a rollover curb? Should the remainder be gravel? 4. Why is the median being terminated without curbing? 5. The travel lane gets as narrow as 11.5`. Fire okay? —> tnkc - v illl Vka ue i5-Ama tiJ%are. it VV rrvwS 6. Alan — Geometrically, does this look like what was discussed? C� JYVa �cA m0�w /1 wJ ovl IrxYr curb. Reviewed by: Erika Bridges Date: 12/11/14 00i v>� � d� Di Veri-Fy' w I �(� cs�1 �IDc�-ed — l(1c�k.J CL� ltUu �n�e �5fi c Vil l iv, Im a 61fNVv Fix d�04 caw. �l touid +i- bk) bP- 6LAIML,4A? 1,5 rrnecJ ou bon.6 12a'rniv W/o cr,-br�87 ENGINEERING COMMENTS NO. 1 1. Please provide a cost estimate, Letter of Acknowledgment, NO], sanitary sewer plan & profile drawings, detention pond drawing, traffic control plan, water report, sewer report, and drainage,report, 3. C2.1 - Please add inlet protection to all proposed inlets along WS Phillips. 4. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS r - Phillips Pkwy. and Barron Cut -Off Rd. 5, Q3_'l-� Sh-wld' Ghe nt seetion,of W�iPh' lir PA;'v. [. and Baffan "t- flare to 6. C3.1-3.5 - FYI... Culvert sizing will need to be verified in'the drainage report. 7. C3.1-3.5 - Show and label the right-of-way and existing/proposed easements. 8. C3.2-3.4 - Show the sidewalk on the school property and the associated Public Access Easement. FYI... The PAE will need to be shown on the plat or dedicated via separate instrument. _9...C- 3.5 - Please show the decel lane on SH 40. 10. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should continue to the west (rather than turning to the north as previously discusse d be in to the existing 12-inch stub out on the east side of Barron Rd. �,, ol°.K 11. C4.1 - Valves should be located every 800-ft. ' 12. C4.1,4.5 - Please provide at least 12-inch of clearance between storm pipes/culverts and waterlines. 13. C4.2 - Two valves should be added at the tee at Sta.263+64.71. 14. C4.3-4.6 - Install blow -offs at each dead-end line for future streets. 15. C4.1-4.6 - fore -any fire hydrants proposed? & . , 16. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way or , ` PUE. FYI... Please add PUE to plat, as well, if needed. V i i( . C4.4 - Why -is -the 8-inch waterline near SH 40 d&a eQding+ rather than looping to the 4"` �fJ? Also, this waterline needs to be within an easement or the right-of-way. „ivy - s that c t�JVC 19. C4.5 - Provide two valves at each tee. 20. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep. p� (1 21. C4.6 - Add the referenced Inset "F" detail to the sheet. here there Is less than 2-ft of over over torm W' 23. RC -\The than Class 111. utfall shoulddaylightorhbesextendedeW' please use Class IV RCP rather than Class III. his phase rather than plugged. 2 C5.2-5.3 - Please match pipe soffits. 65. 5.3 - Should additional inlets be provided along WS Phillips Pkwy.? It looks li there's only a b-ft curb inlet at the low point. „ ` E. 26. C5.3 - Why are parallel wing walls being specifi'bd fv rather than our standard? a� 3 P4Gd U e sTreet? V 28 C5.4 - Do we want a'20'x2,' grate inlet along the side of WS Phillips? -� A7 29. C5.4 - Should there be cement stabilized b_ackfill over the culverts, as well? ` 30. C6.`1 -Add striping on Barron Cut -Off Rd. �„ ow �i t q 1 J 31. C6.1 - Stripe WS Phillips for the west -bound left tern lade the Barron Cut -Off Rai. intersection. / 44. 5 r,f Reviewed by: Erika Bridges ` Date: 3/13/14fr S � p �0� -- -$ ,Rv�ttt� l,A,k �-y� l