HomeMy WebLinkAboutStaff Comments(_ 4IW4�
CITY OF COI7.F.GF. STATION
Home ofTe A&M Unioeaity'
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
TO:
FROM: Jason Schubert, AICP, Principal Planner
SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP) - Final Plat
Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and to be scheduled for a future Planning
& Zoning Commission meeting:
One (1) 24"x36" copy of the revised final plat;
Thirteen (13) 11 "x17" copies of the revised final plat;
One (1) copy of the digital file of the final plat on diskette or e-mail to
pdsdigitalsubmittal(cDcstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed your project will not be
scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at
the following web site on Monday the week of the P&Z meeting.
http://www.csb(.gov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments
cc:
Case file #14-00900049
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 2
Project: BRIDGEWOOD SUBDIVISION PH 1 (FP) - 14-00900049
PLANNING
1. Revise General Note 1 B to provide the volume and page of the deed to CSISD.
2. Revise General Note 1 D to change the project number from 12-238 to 13-238.
3. Depict the recorded TxDOT access restriction along William D. Fitch Parkway that caused
Brewster Drive to realign and label with volume and page of that document(s).
4. Please note that the previously comments related to providing HOA creation documents
along with the division of the 13+/- acre tract with volume and page still would be needed for
the plat to be filed.
5. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Jason Schubert Date: June 19, 2014
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next
transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review. 2 of 2
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTIO
SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version
of plat and / or site plan as soon as it is available. Email to: ehorton(cD-cstx.gov
LOAD DATA: The developer will provide load data to CSU as soon as it is available. This
information is critical for CSU to accurately determine the size and number of transformers,
and other equipment, required to provide service to the project. Failure to provide load data
will result in construction delays and, due to clearance requirements, could affect the final
building footprint. Delivery time for transformers and other equipment not in stock is
approximate 26 weeks.
EASEMENTS: Developer provides temporary blanket easement for construction purposes
and upon completion of project must provide descriptive easements for electric infrastructure
as designed by CSU.
EASEMENTS: All easements on site are existing. Electric facilities will be designed within
existing easements.
EASEMENTS: Developer provides descriptive easements for electric infrastructure as
designed by CSU, as shown on plat or site plan.
If easements are existing, the developer will be responsible for locating easements on site to
insure that electrical infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
Developer installs conduit per CSU specs and design.
CSU will provide drawings for electrical installation.
Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser.
Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other
device, per CSU specs and design.
Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull
boxes and secondary pedestals provided by CSU.
Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing
as designed by CSU.
To discuss any of the above electrical comments please contact Eric Horton at
979.764.6280.
Reviewed by: Eric Horton Date:3/12/14
ENGINEERING COMMENTS NO. 2
1. (Repeat) Please provide a cost estimate, Letter of Acknowledgment, NOI, sanitary sewer
plan & profile drawings, detention pond drawing, traffic control plan, Tx DOT permit
application, water report, sewer report, and drainage report. Please submit an NOI,
revised cost estimate, revised TxDOT permit application, and revised drainage report.
2. (Repeat) Plat - The boundary does not appear to close. It appears that a call is missing
between L10 & L11 on the drawing.
3. (Repeat) C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the
end of this property and Barron Rd.
4. (Repeat) C3.1-3.5 - Label the ADA sidewalk ramps.
5. (Repeat) C3.5 - Please show the decel lane on SH 40.
6. (Repeat) C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should
continue to the west (rather than turning to the north as previously discussed), cross WS
Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut -Off Rd. street
until it connects to the existing 12-inch stub out on the east side of Barron Rd. As previously
discussed, this connection will be eligible for Oversized Participation and should be reflected
in the OP request and supporting documents.
7. (Repeat) C5.3 - A handrail should be provided along the sidewalk at the culvert crossings.
8. (Repeat) C6.1 - Please show and label all street & regulatory signage. Provide locations
of street signs including street names and block numbers.
9. (Repeat) FYI ... The balance of the Development Permit Fee, equivalent to 1% of the total
public infrastructure costs, will be due prior to issuance of the Development Permit.
10. Plat - Please revise Note #3 to show Parkland Dedication as 1.349 Ac. rather than 1.247
Ac.
11. Water Report - Please verify how the 0.5 gpm per residence and that specific C coefficient
were derived.
12. Water Report - The model in the report is dual fed from the 12-inch along WS Phillips & the
8-inch along WD Fitch, however the plans only show a single connection with the 12-inch.
How does this effect velocities and pressures?
13. Water Report - Please provide a model run that includes peak demands plus fire flow.
14. C1.1 - Please show the waterline connection along WD Fitch at Victoria and at Barron &
WS Phillips.
15. C4.1 - Sta. 0+61.32-Should the 8x13 coupling referenced be an 8x12? Also, please show
the second 12-inch gate valve in profile.
16. C4.1 - Please provide profile for 8-inch waterline crossing WS Phillips.
17. C4.1 - Based on the street classification, there should be encasement for water mains
crossing WS Phillips.
18. C5.6 - FYI ... A separate building permit will be required for the retaining walls exceeding 24-
inch in height.
19. C5.6 - Label the flowlines at the inlet and outlet structures and flumes.
20. Drainage Report - Provide hydraulic gradelines, hydrographs, spreadsheet showing the
sizing of the culverts crossing WS Phillips Pkwy., velocities in/out of the ponds, and cross-
section details of pond outfalls.
21. Drainage Report - Clearly label the 100-yr WSE and emergency spillway elevations for
each pond on the plans and in the drainage report. Also, verify that these values match on
the plans and in the report.
22. Drainage Report - Update the
23. Drainage Report - Exhibit A-
area(s).
24. Drainage Report - Exhibit B-
WS Phillips should be larger.
roughness coefficients in Appendix D.
Verify that all of WS Phillips Pkwy. is included in a drainage
looks like the drainage area for the culverts crossing under
25. Drainage Report —Exhibit C-1- Update the flow path lengths.
26. Drainage Report — Exhibit C-3 shows that the maximum pipe velocity has been exceeded.
Please use a larger pipe.
27. Drainage Report — Please update Exhibit B to include Drainage Areas 27.1, 40, and 41, as
shown in Exhibit C-1.
28. Drainage Report — Exhibit C-2- Update the table to include velocities within the streets.
29. Drainage Report — Please revise the wet pond detail in Exhibit E-1 to reflect this project.
Also, include this detail drawing in the plans.
30. Drainage Report — FYI ... Since the pond is along the creek, it may need to meet construction
and design criteria for dams as required by TCEQ.
Reviewed by: Erika Bridges Date: 5/22/14
ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension
1. Please submit an engineer's cost estimate.
2. Show the proposed location of the power poles.
3. Please specify a construction joint at the terminus of the median where the City's project will
start.
4. On the eastern portion of the median, Fire has requested that lay -down curb be used to
make it easier to maneuver the truck through this area.
5. Per Danielle Singh, Transportation Planning Coordinator:
a. C4.1 — The double 4" stripe at the east end of the median should be yellow rather
than white.
b. C4.1 — Please label the diagonal striping at the east end of the median similar to
previously approved plans.
c. C5.2 — FYI ... TxDOT will need to approve the signage along Wellborn prior to
installation.
Reviewed by: Erika Bridges Date: 12/11/14
ENGINEERING COMMENTS NO. 1
1. Please provide a cost estimate, Letter of Acknowledgment, NOI, sanitary sewer plan &
profile drawings, detention pond drawing, traffic control plan, TxDOT permit application,
water report, sewer report, and drainage report.
2. FYI ... Since this was a preliminary submittal, we understand that there are still minor
revisions that will need to be made prior to the final set of plans (i.e. table of contents,
vicinity map, missing text, etc).
3. Plat - The boundary does not appear to close.
4. Plat - Please reverse the directions for lines L12, L13, and L14 (i.e. NW to SE).
5. C2.1 - Please add inlet protection to all proposed inlets along WS Phillips.
6. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS Phillips
Pkwy. and Barron Cut -Off Rd to the south.
7. C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the end of
this property and Barron Rd.
8. C3.1 - Per the TIA, there should be a west -bound right turn decel lane at the intersection
of WS Phillips Pkwy. and Barron Cut -Off Rd.
9. C3.1-3.5 - FYI... Culvert sizing will need to be verified in the drainage report.
10. C3.1-3.5 - Show and label the right-of-way and existing/proposed easements.
11. C3.1-3.5 - Label the ADA sidewalk ramps.
12. C3.2-3.4/Plat - Show the sidewalk on the school property and the associated Public
Access Easement. FYI... The PAE will need to be shown on the plat or dedicated via
separate instrument.
13. C3.5 - Please show the decel lane on SH 40.
14. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should
continue to the west (rather than turning to the north as previously discussed), cross WS
Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut -Off Rd.
street until it connects to the existing 12-inch stub out on the east side of Barron Rd. As
previously discussed, this connection will be eligible for Oversized Participation and
should be reflected in the OP request and supporting documents.
15. C4.1 - Valves should be located every 800-ft.
16. C4.1,4.5 - Please provide at least 12-inch of clearance between storm pipes/culverts
and waterlines.
17. C4.2 - Two valves should be added at the tee at Sta.263+64.71.
18. C4.3-4.6 - Install blow -offs at each dead-end line for future streets.
19. C4.1-4.6 - Please show proposed fire hydrants in accordance with the Preliminary Plan.
20. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way or
PUE. FYI... Please add additional PUE to plat if needed.
21. C4.4 - The 8-inch waterline along Brewster Dr. near SH 40 should loop to the east as
shown on the Preliminary Plan. Also, this waterline needs to be within an easement or
the right-of-way.
22. C4.5 - Provide two valves at each tee.
23. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep.
24. C4.6 - Add the referenced Inset "F detail to the sheet.
25. C5.1 - Where there is less than 2-ft of cover over the storm sewer, please use Class IV
RCP rather than Class III.
26. C5.1 - The downstream ouffall should daylight or be extended with this phase rather
than plugged.
27. C5.2-5.3 - Please match pipe soffits.
28. C5.3 - Please note that the culverts should be left with adequate tongue/groove fittings
in order to accommodate their extension with the future construction of the other half of
WS Phillips Pkwy.
29. C5.3 - A handrail should be provided along the sidewalk at the culvert crossings.
30. C5.4 — FYI... Culvert #1 appears to be a critical drainage design element to be looked at
further with the drainage report. We have initial concerns about the grate inlet capacity
and impacts to the road.
31. C6.1 — Add stop bar on Barron Cut -Off Rd.
32. C6.1 — Please add show and label all street & regulatory signage.
33. C6.1 — FYI... Danielle Singh, Transportation Planning Coordinator, is still reviewing the
pavement markings and will send comments separately.
34. C6.1 — Stripe WS Phillips for the west -bound left turn lane at the Barron Cut -Off Rd.
intersection and stripe portion of future east bound lane on WS Phillips (similar to how it
was striped in Castlegate II).
35. FYI ... The balance of the Development Permit Fee, equivalent to 1% of the total public
infrastructure costs, will be due prior to issuance of the Development Permit.
36. FYI ... The public infrastructure will need to be built or surety provided for it prior to the
final plat being scheduled for a P&Z meeting.
Reviewed by: Erika Bridges Date: 3/13/14
Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Once all comments have been
addressed and the following information submitted, your project will be placed on the next
available Planning and Zoning Commission meeting held in the City Hall Council Chambers,
1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat; and
Two (2) revised copies of construction documents.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed your project will not be
scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at
the following web site on Monday the week of the P&Z meeting.
http://www.csb(.gov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff Review Comments
STAFF REVIEW COMMENTS NO. 1
Project: Bridgewood Subdivision Ph 1 (Fp) (14-00900049)
PLANNING
1. Provide documentation to verify the remaining 15 acres (proposed Suburban Commercial
and Townhome areas) of the 75 acre tract has been subdivided from the parent tract.
2. A representative from the school will need to sign pages 4 and 5 of the Final Plat application
because they now own the property.
3. Provide an updated Title Report or a deed showing ownership of a portion of the property
has transferred to CSISD.
4. Revise the title block to include the lot and block number for the plat.
5. Revise the notary portions of the Certificates of Ownership and Dedication to remove
references to plural tense (person(s), whose name(s), is/are, he/they).
6. Remove the Certificate of City Planner, as this is not a Minor Plat.
7. Provide a note stating this subdivision is zoned PDD. Also, add the ordinance number
2013-3512 and Revised PDD Concept Plan Project number 12-238 for future reference
purposes.
8. Tie the subdivision to an established corner monument and label it on the plan.
9. As a reminder, it will be necessary to provide legal documentation establishing the HOA
prior to filing the Final Plat.
10. Since Brewster Drive is included in Phase 1, add a note stating which Residential Parking
Option that will be utilized to meet the requirements for "Single -Family Residential Parking
Requirements for Platting." Brewster Drive would meet the requirements to use the "Wide
Streets" option or "Parking Removal with Platting".
11. Add a note stating this property lies within the Spring Creek Sanitary Sewer Impact Fee
Area.
12. Revise the plat to include the park connection from Dunlap Loop that falls between the
residential lots.
13. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
14. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Teresa Rogers Date: March 12, 2014
TRANSPORTATION
1. The crosswalk bars should be specified to be 2' in width and 8' across (as shown).
2. The white strips delineating the cross hatch markings should be 4".
3. Regulatory signs will be installed by the City and do not need to be shown on these
plans.
4. On striping area 5, the hatching should not extend around the radius onto Barron Cut -
Off. Please bring the curve back to be even with the edge of pavement on Barron Cut-
off.
5. Please be consistent with the use of a secondary turn arrow. Two arrows is preferable
on the left turn lanes, but one is sufficient due to the length.
6. FYI -As discussed previously, sight triangles will need to be looked at with the final
plats of subsequent phases. Obstructions will need to be eliminated to preserve sight
distance along Brewster.
Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 6/17/14
TRANSPORTATION
1. Double yellow striping should extend along the length of W.S. Phillips Parkway and
Brewster Drive. Striping should be 4" Double Yellow Type I with RRPM Type II -A -A.
2. White striping should be 8" white Type I with RRPM Type 1-C.
3. For turn lanes, a turn arrow should be located 32' from the end of the white stripe
(measured longitudinally from the edge closest to the driveway or intersection)
followed by an "ONLY" symbol 32' from the edge of the arrow.
4. Please add details to show dimensions. This should include lane widths, taper lengths
and storage lengths.
5. Please specify that the crosswalks are a minimum of 6' wide.
6. The 6' dashed stripe along the taper section of the decel lane for the parent driveway
is not necessary.
7. Straight arrows are not required.
8. Please remove note 3. Symbols and text should be the standard size. Please revise
note 2 to correspond with comments 1 & 2 above.
9. The direction on the diagonal crosshatch markings should be switched.
10. The diagonal cross hatch markings should be 8" Yellow Type 1. The outline of the
striped median should be 4" Double Yellow Type 1.
Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 3/19/2014
ENGINEERING COMMENTS NO. 3
(Repeat) C3.1-3.5 — Label the ADA sidewalk ramps. Please reference the appropriate
City Standard Detail.
(Repeat) C5.3 — A handrail should be provided along the sidewalk at the culvert crossings.
Please specify handrail on C5.3 and provide a detail.
(Repeat) C6.1 — Please show and label all street & regulatory signage. Provide locations
of street signs including street names and block numbers.
(Repeat) Water Report — Please verify how the 0.5 gpm per residence and that specific C
coefficient were derived. Please note the number of residential connections being
assumed.
(Repeat) Water Report — The model in the report is dual fed from the 12-inch along WS
Phillips & the 8-inch along WD Fitch, however the plans only show a single connection with
the 12-inch. How does this effect velocities and pressures? Revise P28 & P31 to 12-inch
rather than 10-inch waterlines.
(Repeat) Drainage Report— Update the roughness coefficients in Appendix D.
(Repeat) Drainage Report — Provide hydraulic gradelines, hydrographs, spreadsheet
showing the sizing of the culverts crossing WS Phillips Pkwy., velocities in/out of the ponds,
and cross-section details of pond ouffalls. Some of the 10-yr and 100-yr hydraulic
gradelines appear to exceed maximum allowable elevations. Also, please provide
velocities in/out of the ponds.
C5.6 — The "C-C" cross sectional detail is labeled as "B-B."
9. Drainage Report — Please provide a clarification as to why the 100-year post -development Q
at Point A is so much larger than the 100-yr post -development Q coming out of Pond #2.
10. Drainage Report — Please verify that a 12-ft wide area at the center of the streets is left clear
during the 10-yr storm.
11. Drainage Report — Please update Exhibit C-1, C-2 since Exhibit B was updated.
12. Drainage Report — Exhibit B — Are the acreages for DA 2 & 3 both 2.59 Ac.? If so, Exhibit
C-3 has the wrong acreages listed. This looks like it may impact inlet and pipe sizes.
13. Drainage Report — Exhibit C-1 — Please verify that the 100-year intensities are accurate.
14. Drainage Report — Exhibit C-1 — The acreages for DA 2, 3, 4A, and 4B don't match the
acreages provided in Exhibit B.
15. Drainage Report — Exhibit C-2 — A 15-ft inlet is specified in the table, but Sheet C5.3 still
only shows a 10-ft inlet.
16. Drainage Report — Exhibit C-2 — It looks like DA 2 has carry over drainage. Shouldn't this
be reflected in the Total Q at Inlet for DA 3?
17. Drainage Report — Exhibit C-2 — Why is there 2-ft of ponding at DA 23? How is that going to
effect the adjacent lots if the grate inlet clogs?
18. Drainage Report — Exhibit C-2 — Where are the missing DA's (i.e. 4A, 15A, 24A, 28A, etc.)?
Where are the Q's from these DA's accounted for?
19. Drainage Report — Exhibit C-3 — Where do the values for Inlet #1 come from? They don't
seem to link to values provided in any other tables. Also, where is the 4x4 box located?
20. Drainage Report — Exhibit C-3 — The Inlet Numbers, Total CA, Tc, Lengths, and Unadjusted
Design Flows need to match on Plans and Exhibit C-1.
21. Drainage Report — Exhibit C-3 — Please add the actual pipe slope from the plans.
22. Drainage Report — Exhibit C-3 — The note regarding the Adjusted Design Flow indicates a
33% adjustment, but it looks like there was actually a 30% adjustment.
23. Drainage Report — Exhibit C-4 & 5 — Please submit revised Exhibits C-4 & C-5 per
previously emailed comments.
24. Drainage Report — Exhibit C-6 & 7 — In the Culvert and Ouffall Channel Design tables, the
Slopes, Bottom Widths, and Top of Road elevations should match the plans.
25. Drainage Report — Exhibit C-6 & 7 — The Mannings Coefficient for the outfall channel is
higher than the range of acceptable values in Table C-10 of the Design Guidelines.
26. Drainage Report — Exhibit C-6 & 7 — Since WS Phillips Pkwy. is a major collector, the
upstream headwater elevation at each culvert is required to be at least 1-ft below the top of
curb.
27. Drainage Report — Exhibit C-6 & 7 — Culvert #2 should have flared wing -walls at the
entrance since it is accepting flow from a channel that is not well defined.
Reviewed by: Erika Bridges Date: 5/22/14
MEMORANDUM
June 26, 2014
TO: Randy French, BCS Development Co., via: rfrench(a)stylecraftbuilders.com
FROM: Jason Schubert, AICP, Principal Planner
SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP) - Final Plat
Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and to be scheduled for a future Planning
& Zoning Commission meeting:
One (1) 24"x36" copy of the revised final plat; and
Two (2) revised copies of construction documents.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed your project will not be
scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at
the following web site on Monday the week of the P&Z meeting.
hftp://www.Gstx.4ov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff Review Comments
PC: J. Dale Browne, Jr. P.E., McClure & Browne; via: daleb(a).mCClurebrowne.com
P&DS Project No. 14-00900049
Planning &De elapment Servfres
I'.O. 90\ 9%0 - I107 CI=.\AS. rat; tT. C0 I F(F S r.A]10N • TT\,ai . -,7g42
TEL 979.764.3570 • FA\. 979.764.3496
cstx.gov/devservices
f fo Z -&arum
mau Tdlgj (-oa u p1g4i ruoa pun •.Tr' aq1 o11uo palnrod uaaq 1ou anv(l mqj nold amqj uo nFunga jmorlrppn fuy ruot<(luafuo „palggrr2,
pun salla77u11:ruruoll lxau mo,fue paur�dxa aq lnrui •uopvIS, gJep-)fo ,qr) aqi 4fq palraubal uaaq Jou anoq xgl'rurgr[aqi o1 apaur raPuraga Firy :gyoA(
,8;!q!gx3 u1 pap!nad sebeejoe
aq; go;ew ;,uop 8ti pue 'yti '£ 'Z va jo; sabeajoe eql — 6-O ;!glgx3 — uodad abeu!ejo -til,
-a;emooe eje sa!;!sua;u! jean(-00l, ay;;eq; fjuan aseald — L-0;iq qx3 — podad a6euleja £ 6
-sezls adld pue ;alul;oedwl lew;l a>Iq s� ool sigl -pa;sll sa6eajoe buann aq; seq £-0
;!q!gx3'os A L,OV 657 gloq £ '8 Z bo jo; sabeajoe aq; ajH — 8 1!q!gx3 — }jodad a6euleja -Z 6
'pa;epdn Senn 8;!q!gx3 aouls Z-0 ' L-0;!q!gx3 a;epdn aseald —jjodad a6euleja -L 6
'wJo;S Jl-06 aq; 6uunp
Jealo uai Si s;aa;S aq;;o Ja;uao aq;;e ease apinn g-Z 6 e;eg; A;uan aseald — ljodad abeupa 01,
'Z# puod;o;no 6u!woo O;uawdolanap-;sod jA-00t, aq; ueq;jabjel gonw os sl d;u!od le
O;uawdolanap-;sod jeGA-00I, aq; Agnn o; Se uol;eol;uelo e apinad aseald — }jodad a6euMG -6
8 8„ se palagel sl pe;ap lemmas ssao „0-0„ agl— 9,90 '8
•spuod aq;;o;no/ul sal;Iaolan
apino.id aseald 'osly -suol;enala aigennolle wnwlxew paeoxe o; jeadde soullapeA
ollnejpAtI A -poll, pue A-0I aq; ;o awoS -sllepno puod ;o slle;ap uolpas-ssao pue
spuod aq;;o;no/ul sagloolan '-Amd sdll!!gd SM 6UISSao s}19nlno ay;;o 6u!zls aq; buimogs
;aagspeajds 'sgdej6apAq 'sau!lapei6 olineipAq apinad — uodad 96eu!eja (;eadad)
•a x!puaddy ul s;ualolg000 ssaugbna aq; a;epdn —podad a6eu!ejo (;eadad) -g
•saullJa;enn gout-06 ueq; M41W
VU1-U 0; 4£d 19 8Zd aslnab Zsamssajd pue sal;loolan;oa};a sM saop nnoH 'goul-Zl, aq;
q;inn uol;oauuoo a16uls a nnogs Aluo sueld ay; Janannoq '40;!3 aM 6uole gout-g ag;Q sdlll!gd
SM 6uole gout-Zl, ay; won; pa; lenp sl IJodai aq; ui lapow aql — IJodad ja;eM (;eadad) g
-pawnsse
6waq suol;oauuoo Iel;uaplsaj ;o jagwnu ag; a;ou aseald -panuap mono ;ualo!#aoo
0 ogipads ;eq; pue aouapsaj jad wd6 9-0 aq; anoq 4!JGA aseald — jjodad ja;eM (;eadad) ti
-saagwnu 3/oo/q pue saweu;aai;s Bu;pnpui su8;s jewis jo
suopeoo/ ap;noad -abeu6ls do;eln6aj g;aa;s Ile lagel pue nnogs aseald — S-gO (;eadad) £
'Ile;ap a apinojd pue 5,90 uo Ilejpueq A;loads aseald
sbulssao 1janlno aq;;e Nlennap!s aq; 6uole pap!Aad aq pinogs I!ejpueq y — £ 40 (;eadad) -Z
'Ile;aO pJepue4S A;10
a;eudo.idde ag; aouejejej aseald sdwej �lennapls V(]V ay; lage-I — 9'£-6'£O (;eadad) .`
EJNIN33NIJN3
tiLOZ `6l, aunt :a;ea pagngoS uosep :Aq panna!AeN
;eld inoA;o bu!lg ay; o; joud
;uaimo;ou we Aeq;;! sa;eol;l}iao xe; pied;lwgns o; pambai aq Aew nol;eg; a;ou aseald '9
-palg eq o;;eld eq;
jo; papeeu aq pinonn figs abed pue awnlon q;lnn;oeJ; aloe -/+gl ag;;o uolsln!p aq; q;!nn 6u01e
s;uewnoop uol;eao VOH 6uip!Aad o; pa;elaj s;uawwoo Rlsnolnajd ay; ;eq; a;ou aseald 'ti
:(s);uawnoop;eq;;o abed pue awnlon q;!M lagel pue u6!leaJ o; anua Ja;SMGle
pasneo;eq; lenn>Iaed q01ld 'a wEIIHAA buole uogou;saJ ssaooe 1paxl papJooaj aq;;oldao £
'8£Z-£6 0; 8£Z-Z 6 wa; jagwnu;oafad ag; a6ueyo o; a L a;oN le'auaO apinad -Z
'aSISO o; peap aq;;o abed pue awnlon ay; apinad o; El I, a;oN leJauaO as!nad ' I,
EJNINNV Id
6ti000600-1176 - (dd) I, Hd NOISIAIGenS a00M3Jald8 :;oafad
Z 'ON S1N31AIW00 M31A3N ddd1S
STAFF REVIEW COMMENTS NO. 1
Project: Bridgewood Subdivision Ph 1 (FP) (14-00900049)
PLANNING
1. Provide documentation to verify the remaining 15 acres (proposed Suburban Commercial
and Townhome areas) of the 75 acre tract has been subdivided from the parent tract.
2. A representative from the school will need to sign pages 4 and 5 of the Final Plat application
because they now own the property.
3. Provide an updated Title Report or a deed showing ownership of a portion of the property
has transferred to CSISD.
4. Revise the title block to include the lot and block number for the plat.
5. Revise the notary portions of the Certificates of Ownership and Dedication to remove
references to plural tense (person(s), whose name(s), is/are, he/they).
6. Remove the Certificate of City Planner, as this is not a Minor Plat.
7. Provide a note stating this subdivision is zoned PDD. Also, add the ordinance number
2013-3512 and Revised PDD Concept Plan Project number 12-238 for future reference
purposes.
8. Tie the subdivision to an established corner monument and label it on the plan.
9. As a reminder, it will be necessary to provide legal documentation establishing the HOA
prior to filing the Final Plat.
10. Since Brewster Drive is included in Phase 1, add a note stating which Residential Parking
Option that will be utilized to meet the requirements for "Single -Family Residential Parking
Requirements for Platting." Brewster Drive would meet the requirements to use the "Wide
Streets" option or "Parking Removal with Platting".
11. Add a note stating this property lies within the Spring Creek Sanitary Sewer Impact Fee
Area.
12. Revise the plat to include the park connection from Dunlap Loop that falls between the
residential lots.
13. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
14. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Teresa Rogers Date: March 12, 2014
ENGINEERING COMMENTS NO. 1
1. Please provide a cost estimate, Letter of Acknowledgment, NOI, sanitary sewer plan
& profile drawings, detention pond drawing, traffic control plan, TxDOT permit
application, water report, sewer report, and drainage report.
2. FYI... Since this was a preliminary submittal, we understand that there are still minor
revisions that will need to be made prior to the final set of plans (i.e. table of
contents, vicinity map, missing text, etc).
3. Plat — The boundary does not appear to close.
4. Plat — Please reverse the directions for lines L12, L13, and L14 (i.e. NW to SE).
5. C2.1 — Please add inlet protection to all proposed inlets along WS Phillips.
Sa:1LUaSAap/A03')gs:)
96Fc—.�9L'6Lti'XVA- 05 9L'6-�6 TM
Z;-SLL • SNX7:L - Sk'X3.1- IOi: • 0966Xc�k7'O'<i
aarua�rauaurdojoaa�j,y &exxcuv�xj
6117000600-46 'ON loafed S(]'8d
woo'aumaclanloow galep :eiA'auma8 �R ajnlOoW ''3'd 'a[• 'auma8 ale(] T :Od
sluawwoo MalA9�j 11e1S :sluawyoelly
'0L9E'ti9L'6L61e aw
ileo aseald 'uogemolul leuogippe paau jo suogsanb AUe aney noA 11 'geld eql to 6upg aql of joud
pue lenadde Z'8d gage paimbai aq llim geld leug pasina aql 10 leuw6uo jeIAVj a legl alou aseaid
z /Ao 'x1sO'MMM// Rq
'6u1198w Z 8d aql to >laam aql AepuoIN uo aps clam 6ulmollol aql
le passaooe aq ueo �jodaj 11els pue epua6e ayl '6ugaaw ZWd eql jol palnpagos uaaq seq wall
jno! aouo 'pled seal aleudadde eql pue apew uaaq aney suolslAaj aql Ile aouo epuabe ajnlnl
e uo paoeld aq Aew loafed ino,, Bugaaw uoissiwwoo 6uluoZ �R 6uluueld a jol palnpagos
aq lou illm loefaad jno! passaippe uaaq lou aney sluawwoo Ile 11 'ulaaq paweluoo sluawwoo
MalAaj }gels aql ssaippe of >laas legl iolejlsiuiwpy aql of sluawnoop pasmai pue sluawwoo
asuodsai uaguM pap!Aad lou seq lueoildde a4111 `owaw slgl to alep aql wag sAep 06 ui ajidxa
IIlm uogeoildde sigl legl alou aseald 'uo11e1S 9691103 10 40 aql gllm Pan Allewiol pajaplsuoo
aq Illm loafed inoA '6ugaaw 6uluoZ V 6uluueld eql jol sluawnoop pannbei aql to ldlaoaj uodn
'sluawnoop uoilonulsuoo 10 seidoo paslAa (Z) oMl
pue 'geld leug paslnaj aql to /doo „ggx„yZ (l.) auo
'anueAv sexal 60I, I,
'sjagwego llounoO PH 40 aql ul play 6wlaaw uolsslwwoO 6uluoZ pue 6uluueld algellene
veu aql uo paoeld aq lllm loafed ino! 'pal}iwgns uogewjolw bulmollol aql pue passaippe
uaaq aney sluawwoo Ile aouo 'passajppe aq of paau legl swan 6uilpjap sluawwoo MalAa
gels to lsil e s1 abed Bumollol aql 'palsenbei se geld leug pauoguaw-anoge aql paMalAaJ gelS
(dd) t Hd NOISIAIO8f1S OOOm3JOR19 aO3f8f1S
Jauueldlgels'sJa6oaesaal :WO2id
woo 'sJapI!ng4ejoal s gouaip :elA `-oo luawdolana(] SO8 'gouaid 1pueb :Ol
Wf1OMdUOW3W
,K011V LS U-)TnCID 30 xsiD
�r'
6. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS
Phillips Pkwy. and Barron Cut -Off Rd to the south.
7. C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the end
of this property and Barron Rd.
8. C3.1 - Per the TIA, there should be a west -bound right turn decel lane at the
intersection of WS Phillips Pkwy. and Barron Cut -Off Rd.
9. C3.1-3.5 - FYI... Culvert sizing will need to be verified in the drainage report.
10. C3.1-3.5 - Show and label the right-of-way and existing/proposed easements.
11. C3.1-3.5 - Label the ADA sidewalk ramps.
12. C3.2-3.4/Plat - Show the sidewalk on the school property and the associated Public
Access Easement. FYI... The PAE will need to be shown on the plat or dedicated
via separate instrument.
13. C3.5 - Please show the decel lane on SH 40.
14. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should
continue to the west (rather than turning to the north as previously discussed), cross
WS Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut -
Off Rd. street until it connects to the existing 12-inch stub out on the east side of
Barron Rd. As previously discussed, this connection will be eligible for Oversized
Participation and should be reflected in the OP request and supporting documents.
15. C4.1 -Valves should be located every 800-ft.
16.C4.1,4.5 - Please provide at least 12-inch of clearance between storm
pipes/culverts and waterlines.
17. C4.2 - Two valves should be added at the tee at Sta.263+64.71.
18. C4.3-4.6 - Install blow -offs at each dead-end line for future streets.
19.C4.1-4.6 - Please show proposed fire hydrants in accordance with the Preliminary
Plan.
20. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way
or PUE. FYI... Please add additional PUE to plat if needed.
21. C4.4 - The 8-inch waterline along Brewster Dr. near SH 40 should loop to the east
as shown on the Preliminary Plan. Also, this waterline needs to be within an
easement or the right-of-way.
22. C4.5 - Provide two valves at each tee.
23. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep.
24. C4.6 - Add the referenced Inset "F" detail to the sheet.
25. C5.1 - Where there is less than 2-ft of cover over the storm sewer, please use Class
IV RCP rather than Class 111.
26. C5.1 - The downstream outfall should daylight or be extended with this phase rather
than plugged.
27. C5.2-5.3 - Please match pipe soffits.
28.C5.3 - Please note that the culverts should be left with adequate tongue/groove
fittings in order to accommodate their extension with the future construction of the
other half of WS Phillips Pkwy.
29. C5.3 - A handrail should be provided along the sidewalk at the culvert crossings.
30.C5.4 - FYI... Culvert #1 appears to be a critical drainage design element to be
looked at further with the drainage report. We have initial concerns about the grate
inlet capacity and impacts to the road.
'nS0 !q pau6!sap se
bugna;!npuoo pue 'suo!;eool ja;aw lie 'sjeeBgo;!Ms jo 'saxoq IInd 'sjewjo;suej; .9'1 'aowas
leou;oala ap!naid o; luessaoau sa!;!l!oe; leou;oala pasodad Ile Mogs ;snw ueld a;!s leu!d '9
Y1S0 Aq Pap!nad sle;sapad tiepuooas pue saxoq
pnd 'u6!sap pue soads [>S0 jad sle;sapad tiepuooas pue saxoq Ilnd spe;su! jedol9na4 I_
-u6!sap pue soads f180 jad 'ao!nap
jag;o jo 'saxoq llnd 'sjewjo;suei; 'a'! 's6u!;oo; jo sped ao!nap ou;oala sinod jadolanap '9
;noAel leou;oala f1S0 uo umogs se;!npuoo pe;sui pue gs!wn;
II!M jadolanap 'saolnap 6ugSlxa Jag;o Jo JawJo}SueJj pa;eu6!sap;e;slxaIOU saop;mpuoo A 'S
pannbei se puaaxa pue
saolnap 6ul;slxa jag;o jo siewjo;sue„ pa;eu6!sap;e;!npuoo 6ugs!xa;daoia;u! II!M jadolana4 •t7
'jasu spe;su! f1S0 •;mpuoo jesu qoea jo;;!npuoo 0WI jo p!6u;o ,p£ sap!nad aadolanaa .£
'uogelle;sul leou}oala Jo; SOUIMeJp ap!nad p!M f1S0 'Z
-u6!sap pue soads f1S0 jed;!npuoo spe;su! jadoianap ' 6
S1N3WW00 IVIOIU10313 1VN3N3J
-sauepunoq;uawasee u!q;!m palle;sw s! ain;onu;sei;ui leoupala;eg; ainsui
o; a;!s uo s;uawasee 6u!;eool jo; alq!suodsai aq II!m jadolanap ag; '6ugSlxa are s;uawasea bl -9
-ueld a;!s jo;eld uo uMogs se '[>S0 Aq pau6!sap
se ainprulsei}ui ou;oala jo; s;uawasea angduosap sap!nad jedoianap :S1N3W3SV9 '9
s;uawasea 6ul;s!xe
u!g;!M pau6!sap aq II!nn sagg!oe; ou;oa13 -6ugs!xe aie a;!s uo s;uawasea IIV :S1N3W3SV3 '17
-nS0 Aq pau6!sap se
ain;onu;sei;u! ou;oala Jo; S;uawasea angduosap ap!noid;snw;oefad;o uogaldwoo uodn pue
sasodmd uo!;onu;suoo jo; ;uawasea ;a� uelq tiejodwa; sap!nwd jadolanaa :S1N3W3SV3 '£
-sNaaM 9Z a;ew!xwdde
s! �oo;s u! ;ou ;uawd!nba jag;o pue sjawo;suej; jo; aw!; /uan!Iap ';uud;oo; 6u!plmq
leug aq;;oage pinoo 's;uawannbei eouejealo o; anp `pue sAelap uogonu;suoo u!;lnsai Jim
e;ep peol ap!noid o; ejnl!ed ';oafoid aq; o; aowas ap!nojd o; paj!nbai ';uawdmbe jag;o pue
'sjewjo;suej;;o jagwnu pue az!s ag; au!wa;ap Ala;emooe o; nso jo; Ieoguo sl uol;ewjo;ui
s!ql 'algel!ene s! ;! se uoos se f1S0 0; e;ep peol ap!nad II!M jadolanap agl :Viva aVOI 'Z
no 'x;So Uo}Joga :o; I!ew3 'algel!eAe Sl;! se uoos se veld a;iS Jo / PUB lei d;o
uolSJan ';ewjo; 6Mp pVOo;nV geolp a g;!M f1S0 ap!nad II!nn jedolanaa :1V7Id/NVId 91IS "I,
01IN311V 31VI03WWI JNwino321 S1N3WW001VOIN10313
b6/£6/£ :GIB(] sebpu8 e�!a3 :!g pGMGInG'c!
'6u1Ia9w T&d a jo; painpagos 6u!Gq;eld leug aq}
o; joud;! jo; pap!nojd )gejns jo;I!nq aq o; paeu II!M ein;ona;sm;ui o!lgnd agi*"I).d,9£
;!waad;uawdolanaQ ag;;o aouenssi o; aoud anp aq ll!m 's;soo ain;ona;sei;ui o!lgnd
le;o; ag; 10 %1, o; ;ualen!nba 'Gad ;!woad ;uawdolanap aq; ;o aousleg agl"*V.d,S£
-ill a;e6agse0 ui padu;s seM;! moq
o; ael!w!s) sd!II!gd SM uo auel punoq ;sea am;n; jo uo!}iod adu;s pue uogoasia;ul
'py }}O-;n0 uajeg aq; is auel uan; }}al punoq-;sem ag; jo} sd!II!gd SM aciplS — 6'90'VS
-Ala;ejedas s;uewwoo PUGS II!M pue SbUI�Jew;uawaned ag;
6uiMGlnaJ Ilgs s! 'jo;eu!pjoo0 6u!uueld uo!;elaodsueal `gbu!S apa!uep'"I ld — V90'££
abeu6!s tio;elnbej Q;aaj;s Ile laqel pue MOgs ppe aseOld — 6-90-ZE
'P2i _4O-;n0 uoaaeg uo jeq dots ppV — 6-90' LE
9. To discuss any of the above electrical comments please contact Eric Horton at
979.764.6280.
Reviewed by: Eric Horton Date: March 12, 2014
15. Drainage Report — Exhibit C-2 — A 15-ft inlet is specified in the table, but Sheet C5.3 still
only shows a 10-ft inlet.
16. Drainage Report — Exhibit C-2 — It looks like DA 2 has carry over drainage. Shouldn't this
be reflected in the Total Q at Inlet for DA 3?
17. Drainage Report — Exhibit C-2 — Why is there 2-ft of ponding at DA 23? How is that going to
effect the adjacent lots if the grate inlet clogs?
18. Drainage Report — Exhibit C-2 — Where are the missing DA's (i.e. 4A, 15A, 24A, 28A, etc.)?
Where are the Q's from these DA's accounted for?
19. Drainage Report — Exhibit C-3 — Where do the values for Inlet #1 come from? They don't
seem to link to values provided in any other tables. Also, where is the 4x4 box located?
20. Drainage Report — Exhibit C-3 — The Inlet Numbers, Total CA, Tc, Lengths, and Unadjusted
Design Flows need to match on Plans and Exhibit C-1.
21. Drainage Report — Exhibit C-3 — Please add the actual pipe slope from the plans.
22. Drainage Report — Exhibit C-3 — The note regarding the Adjusted Design Flow indicates a
33% adjustment, but it looks like there was actually a 30% adjustment.
23. Drainage Report — Exhibit C-4 & 5 — Please submit revised Exhibits C-4 & C-5 per
previously emailed comments.
24. Drainage Report — Exhibit C-6 & 7 — In the Culvert and Outfall Channel Design tables, the
Slopes, Bottom Widths, and Top of Road elevations should match the plans.
25. Drainage Report — Exhibit C-6 & 7 — The Mannings Coefficient for the outfall channel is
higher than the range of acceptable values in Table C-10 of the Design Guidelines.
26. Drainage Report — Exhibit C-6 & 7 — Since WS Phillips Pkwy. is a major collector, the
upstream headwater elevation at each culvert is required to be at least 1-ft below the top of
curb.
27. Drainage Report — Exhibit C-6 & 7 — Culvert #2 should have flared wing -walls at the
entrance since it is accepting flow from a channel that is not well defined.
Reviewed by: Erika Bridges
TRANSPORTATION
Date: 6/26/14
1. The crosswalk bars should be specified to be 2' in width and 8' across (as shown).
2. The white strips delineating the cross hatch markings should be 4".
3. Regulatory signs will be installed by the City and do not need to be shown on these plans.
4. On striping area 5, the hatching should not extend around the radius onto Barron Cut -Off.
Please bring the curve back to be even with the edge of pavement on Barron Cut -Off.
5. Please be consistent with the use of a secondary turn arrow. Two arrows is preferable on
the left turn lanes, but one is sufficient due to the length.
6. FYI -As discussed previously, sight triangles will need to be looked at with the final plats of
subsequent phases. Obstructions will need to be eliminated to preserve sight distance
along Brewster.
Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 6/17/14
NOTE: Any changer made to the plans, that have not been requested by the City ofCallege Station, must be explained inyour next transmittal letter and
"bubbled" on your plans. Any additional changes on there plans that have not been pointed out to the 0y, will constitute a completely new
review. 3 of
CITY OF COLLI GE STATION
Home of Texas A&M Univenity'
MEMORANDUM
TO: Randy French, BCS Development Co., via: rfrench[a)stylecraftbuilders.com
FROM: Teresa Rogers, Staff Planner
SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP)
Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Once all comments have been
addressed and the following information submitted, your project will be placed on the next
available Planning and Zoning Commission meeting held in the City Hall Council Chambers,
1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat; and
Two (2) revised copies of construction documents.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed your project will not be
scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at
the following web site on Monday the week of the P&Z meeting.
hftp://www.cstx.gov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff Review Comments
PC: J. Dale Browne, Jr. P.E., McClure & Browne; via: daleb(aD_mcclurebrowne.com
P&DS Project No. 14-00900049
Planning dr Development Services
P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77542
TF.,I... 9-9.764.3570 -FAX. 979.764.3496
cstx.gov/devservices
STAFF REVIEW COMMENTS NO. 1
Project: Bridgewood Subdivision Ph 1 (FP) (14-00900049)
PLANNING
1. Provide documentation to verify the remaining 15 acres (proposed Suburban Commercial
and Townhome areas) of the 75 acre tract has been subdivided from the parent tract.
2. A representative from the school will need to sign pages 4 and 5 of the Final Plat application
because they now own the property.
3. Provide an updated Title Report or a deed showing ownership of a portion of the property
has transferred to CSISD.
4. Revise the title block to include the lot and block number for the plat.
5. Revise the notary portions of the Certificates of Ownership and Dedication to remove
references to plural tense (person(s), whose name(s), is/are, he/they).
6. Remove the Certificate of City Planner, as this is not a Minor Plat.
7. Provide a note stating this subdivision is zoned PDD. Also, add the ordinance number
2013-3512 and Revised PDD Concept Plan Project number 12-238 for future reference
purposes.
8. Tie the subdivision to an established corner monument and label it on the plan.
9. As a reminder, it will be necessary to provide legal documentation establishing the HOA
prior to filing the Final Plat.
10. Since Brewster Drive is included in Phase 1, add a note stating which Residential Parking
Option that will be utilized to meet the requirements for "Single -Family Residential Parking
Requirements for Platting." Brewster Drive would meet the requirements to use the "Wide
Streets" option or "Parking Removal with Platting".
11. Add a note stating this property lies within the Spring Creek Sanitary Sewer Impact Fee
Area.
12. Revise the plat to include the park connection from Dunlap Loop that falls between the
residential lots.
13. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
14. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Teresa Rogers Date: March 12, 2014
ENGINEERING COMMENTS NO. 1
1. Please provide a cost estimate, Letter of Acknowledgment, NOI, sanitary sewer plan
& profile drawings, detention pond drawing, traffic control plan, TxDOT permit
application, water report, sewer report, and drainage report.
2. FYI... Since this was a preliminary submittal, we understand that there are still minor
revisions that will need to be made prior to the final set of plans (i.e. table of
contents, vicinity map, missing text, etc).
3. Plat — The boundary does not appear to close.
4. Plat — Please reverse the directions for lines L12, L13, and L14 (i.e. NW to SE).
5. C2.1 — Please add inlet protection to all proposed inlets along WS Phillips.
6. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS
Phillips Pkwy. and Barron Cut -Off Rd to the south.
7. C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the end
of this property and Barron Rd.
8. C3.1 - Per the TIA, there should be a west -bound right turn decel lane at the
intersection of WS Phillips Pkwy. and Barron Cut -Off Rd.
9. C3.1-3.5 - FYI... Culvert sizing will need to be verified in the drainage report.
10.C3.1-3.5 - Show and label the right-of-way and existing/proposed easements.
11. C3.1-3.5 - Label the ADA sidewalk ramps.
12. C3.2-3.4/Plat - Show the sidewalk on the school property and the associated Public
Access Easement. FYI ... The PAE will need to be shown on the plat or dedicated
via separate instrument.
13. C3.5 - Please show the decel lane on SH 40.
14. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should
continue to the west (rather than turning to the north as previously discussed), cross
WS Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut -
Off Rd. street until it connects to the existing 12-inch stub out on the east side of
Barron Rd. As previously discussed, this connection will be eligible for Oversized
Participation and should be reflected in the OP request and supporting documents.
15. C4.1 -Valves should be located every 800-ft.
16.C4.1,4.5 - Please provide at least 12-inch of clearance between storm
pipes/culverts and waterlines.
17. C4.2 - Two valves should be added at the tee at Sta.263+64.71.
18. C4.3-4.6 - Install blow -offs at each dead-end line for future streets.
19.C4.1-4.6 - Please show proposed fire hydrants in accordance with the Preliminary
Plan.
20. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way
or PUE. FYI... Please add additional PUE to plat if needed.
21. C4.4 - The 8-inch waterline along Brewster Dr. near SH 40 should loop to the east
as shown on the Preliminary Plan. Also, this waterline needs to be within an
easement or the right-of-way.
22. C4.5 - Provide two valves at each tee.
23. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep.
24.C4.6 -Add the referenced Inset "F" detail to the sheet.
25. C5.1 - Where there is less than 2-ft of cover over the storm sewer, please use Class
IV RCP rather than Class III.
26. C5.1 - The downstream outfall should daylight or be extended with this phase rather
than plugged.
27. C5.2-5.3 - Please match pipe soffits.
28.C5.3 - Please note that the culverts should be left with adequate tongue/groove
fittings in order to accommodate their extension with the future construction of the
other half of WS Phillips Pkwy.
29.C5.3 -A handrail should be provided along the sidewalk at the culvert crossings.
30.C5.4 - FYI... Culvert #1 appears to be a critical drainage design element to be
looked at further with the drainage report. We have initial concerns about the grate
inlet capacity and impacts to the road.
31. C6.1 —Add stop bar on Barron Cut -Off Rd.
32. C6.1 — Please add show and label all street & regulatory signage.
33.C6.1 — FYI... Danielle Singh, Transportation Planning Coordinator, is still reviewing
the pavement markings and will send comments separately.
34. C6.1 — Stripe WS Phillips for the west -bound left turn lane at the Barron Cut -Off Rd.
intersection and stripe portion of future east bound lane on WS Phillips (similar to
how it was striped in Castlegate 11).
35.FYI ... The balance of the Development Permit Fee, equivalent to 1% of the total
public infrastructure costs, will be due prior to issuance of the Development Permit.
36. FYI ... The public infrastructure will need to be built or surety provided for it prior to
the final plat being scheduled for a P&Z meeting.
Reviewed by: Erika Bridges Date: 3/13/14
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTIO
1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version
of plat and / or site plan as soon as it is available. Email to: ehorton cstx.gov
2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This
information is critical for CSU to accurately determine the size and number of transformers,
and other equipment, required to provide service to the project. Failure to provide load data
will result in construction delays and, due to clearance requirements, could affect the final
building footprint. Delivery time for transformers and other equipment not in stock is
approximate 26 weeks.
3. EASEMENTS: Developer provides temporary blanket easement for construction purposes
and upon completion of project must provide descriptive easements for electric infrastructure
as designed by CSU.
4. EASEMENTS: All easements on site are existing. Electric facilities will be designed within
existing easements.
5. EASEMENTS: Developer provides descriptive easements for electric infrastructure as
designed by CSU, as shown on plat or site plan.
6. If easements are existing, the developer will be responsible for locating easements on site to
insure that electrical infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other
device, per CSU specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull
boxes and secondary pedestals provided by CSU.
8. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing
as designed by CSU.
9. To discuss any of the above electrical comments please contact Eric Horton at
979.764.6280.
Reviewed by: Eric Horton Date: March 12, 2014
(** o 007`191
CITY OF COLLEGE STATION
Home of lintsAeT'M University'
MEMORANDUM
DATE: December 12, 2014
TO: BCS Development Co., via: rfrenchp_stylecraftbuilders.com
FROM: Erika Bridges, Graduate Engineer II
SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP)
ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension
1. Please submit an engineer's cost estimate.
2. Show the proposed location of the power poles.
3. Please specify a construction joint at the terminus of the median where the City's project will
start.
4. On the eastern portion of the median, Fire has requested that lay -down curb be used to
make it easier to maneuver the truck through this area.
5. Per Danielle Singh, Transportation Planning Coordinator:
a. C4.1 — The double 4" stripe at the east end of the median should be yellow rather
than white.
b. C4.1 — Please label the diagonal striping at the east end of the median similar to
previously approved plans.
c. C5.2 — FYI ... TxDOT will need to approve the signage along Wellborn prior to
installation.
Reviewed by: Erika Bridges
Date: 12/11/14
PC: J. Dale Browne, Jr. P.E./McClure & Browne Engr. /Surv., Inc., via:
daleb mcclurebrowne.com
P&DS Project No. 14-00900049
ENGINEERING COMMENTS NO. 1
1. Please provide a cost estate, Letter of Ackn�edgment, NOI, sanitary sewer plan &
profile drawings, detention pond drawing, traffic control plan, TxDOT permit application,
water report, sewer report, and drainage report. r
2. FYI... Since this was a preliminary submittal, we understand that there ta a stiLminor
revisions that will need to be made prior to the final set of plans (i.e. table of contents,
vicinity map, missing text, etc).
3. Plat - The boundary does not appear to close.
4. Plat - Please reverse the directions for lines L12, L13, and L14 (i.e. NW to SE).
5. C2.1 - Please add inlet protection to all proposed inlets along WS Phillips.
6. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS
Phillips Pkwy. and Barron Cut -Off Rd to the south.
7. C3.1 - Provide a plan and profile drawing of the WS Phillips Pkwy. between the end of
this property and Barron Rd.
8. C3.1 - Per the TIA, there should be a west -bound right turn decel lane at the
intersection of WS Phillips Pkwy. and Barron Cut -Off Rd.
9. C3.1-3.5 - FYI... Culvert sizing will need to be verified in the drainage report.
10. C3.1-3.5 - Show and label the right-of-way and existing/proposed easements.
11. C3.1-3.5 - Label the ADA sidewalk ramps.
12. C3.2-3.4/Plat - Show the sidewalk on the school property and the associated Public
Access Easement. FYI... The PAE will need to be shown on the plat or dedicated via
separate instrument.
13. C3.5 - Please show the decel lane on SH 40.
14. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should
continue to the west (rather than turning to the north as previously discussed), cross WS
Phillips Pkwy. prior to the Thomas tract, and run parallel to the old Barron Cut -Off Rd.
street until it connects to the existing 12-inch stub out on the east side of Barron Rd. As
previously discussed, this connection will be eligible for Oversized Participation and
should be reflected in the OP request and supporting documents.
15. C4.1 - Valves should be located every 800-ft.
16. C4.1,4.5 - Please provide at least 12-inch of clearance between storm pipes/culverts
and waterlines.
17. C4.2 - Two valves should be added at the tee at Sta.263+64.71.
18. C4.3-4.6 - Install blow -offs at each dead-end line for future streets.
19. C4.1-4.6 - Please show proposed fire hydrants in accordance with the Preliminary Plan.
20. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way or
PUE. FYI... Please add additional PUE to plat if needed.
21. C4.4 - The 8-inch waterline along Brewster Dr. near SH 40 should loop to the east as
shown on the Preliminary Plan. Also, this waterline needs to be within an easement or
the right-of-way.
22. C4.5 - Provide two valves at each tee.
23. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep.
24. C4.6 -Add the referenced Inset "F' detail to the sheet.
25. C5.1 - Where there is less than 2-ft of cover over the storm sewer, please use Class IV
RCP rather than Class III.
26. C5.1 - The downstream outfall should daylight or be extended with this phase rather
than plugged.
27. C5.2-5.3 - Please match pipe soffits.
28. C5.3 - Please note that the culverts should be left with adequate tongue/groove fittings
in order to accommodate their extension with the future construction of the other half of
WS Phillips Pkwy.
29. C5.3 - A handrail should be provided along the sidewalk at the culvert crossings.
a.5 rSfi
— Y2� ya r�ti4.,�5
4 -z — r t 1... M U_ 1 snf �t1 eovtvwd�uv� & dRS�h of �Critti �vr dcrya %riCR
.
30. C5.4 — FYI... Culvert #1 appears to be a critical drainage design element to be looked at
further with the drainage report. We have initial concerns about the grate inlet capacity
and impacts to the road.
31. C6.1 —Add stop bar on Barron Cut -Off Rd.
32. C6.1 — Please add show and label all street & regulatory signage.
33. C6.1 — FYI... Danielle Singh, Transportation Planning Coordinator, is still reviewing the
pavement markings and will send comments separately.
34. C6.1 — Stripe WS Phillips for the west -bound left turn lane at the Barron Cut -Off Rd.
intersection and stripe portion of future east bound lane on WS Phillips (similar to how it
was striped in Castlegate ll).
35. FYI... The balance of the Development Permit Fee, equivalent to 1% of the total public
infrastructure costs, will be due prior to issuance of the Development Permit.
36. FYI... The public infrastructure will need to be built or surety provided for it prior to the
final plat being scheduled for a P&Z meeting.
Reviewed by: Erika Bridges
Date: 3113114
A-1iac1el ;511'uco dam }�" �� P,n t! L�' ' t+Yvy LID
i
C4.1 - erd WLi' W5 Ph +Is
7i ! L.�''' L'• � y UC! C-` �J '�'� e (, �� cY�� l�Tl C.� ` l!'r �tC. i`i riti(`..��'� {-- � �'t L' 'i� J l
n
r DPE 0.020
— (UYI �11C�(ltiLl�a� r�1/tC�21 r1c5 .((x C -° r,-'d �` `C1C
vt tou-1 exCw
1nC VL" VIJe+ (-'-�V= "A 1
R
CITY OF COLLEGE STATION
Home of Tee Ae.&^M Univenity`
Il__1J.e_i �.
DATE: December 12, 2014
TO: BCS Development Co., via: rfrench(a)stylecraftbuilders.com
FROM: Erika Bridges, Graduate Engineer II
SUBJECT: BRIDGEWOOD SUBDIVISION PH 1 (FP)
ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension
1. Please submit an engineer's cost estimate.
2. Show the proposed location of the power poles.
3. Please specify a construction joint at the terminus of the median where the City's project will
start.
4. On the eastern portion of the median, Fire has requested that lay -down curb be used to
make it easier to maneuver the truck through this area.
5. Per Danielle Singh, Transportation Planning Coordinator:
a. C4.1 — The double 4° stripe at the east end of the median should be yellow rather
than white.
b. C4.1 — Please label the diagonal striping at the east end of the median similar to
previously approved plans.
c. C5.2 — FYI ... TxDOT will need to approve the signage along Wellborn prior to
installation.
Reviewed by: Erika Bridges
Date: 12/11 /14
PC: J. Dale Browne, Jr. P.E./McClure & Browne Engr. /Sure., Inc., via:
daleb@mccl urebrowne. com
P&DS Project No. 14-00900049
Planning er Development Services
P.O. BOX 9960 • I101'IBXAS AVENUE • COLLEGE STATION • TEXAS - 71843
TEL. 979.764.351 •FAX. 91 .764.3496
cstx.gov/devservices
a r. C?o✓hrv�,v�t 5 'NL. 14
ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension
1. Please submit an engineer's cost estimate.
2. Show the proposed location of the power poles.
3. Please specify a construction joint at the terminus of the median where the City's project will
start.
4. On the eastern portion of the median, Fire has requested that lay -down curb be used to
make it easier to maneuver the truck through this area.
5, FYI... Danielle Singh is still reviewing the striping and traffic control..
Reviewed by: Erika Bridges Date: 12/11/14
ENGINEERING COMMENTS NO. 1 — W.S. Phillips Parkway Extension C'"
1. Please submit an engineer's cost estimate.
2. Please show the proposed location of electric power poles. ��
The apron for the residential driveway needs to be concrete per the City's standard detail.
Should this DW be allowed with a rollover curb? Should the remainder be gravel?
4. Why is the median being terminated without curbing?
5. The travel lane gets as narrow as 11.5`. Fire okay? —> tnkc - v illl Vka ue i5-Ama tiJ%are. it VV rrvwS
6. Alan — Geometrically, does this look like what was discussed? C� JYVa �cA m0�w /1 wJ ovl IrxYr
curb.
Reviewed by: Erika Bridges Date: 12/11/14
00i v>� �
d�
Di Veri-Fy' w I �(� cs�1
�IDc�-ed
— l(1c�k.J CL� ltUu
�n�e �5fi
c Vil l
iv,
Im a
61fNVv Fix d�04 caw.
�l touid +i- bk) bP- 6LAIML,4A?
1,5 rrnecJ ou bon.6
12a'rniv W/o cr,-br�87
ENGINEERING COMMENTS NO. 1
1. Please provide a cost estimate, Letter of Acknowledgment, NO], sanitary sewer plan &
profile drawings, detention pond drawing, traffic control plan, water report, sewer report,
and drainage,report,
3. C2.1 - Please add inlet protection to all proposed inlets along WS Phillips.
4. C3.1 - Provide a plan and profile drawing for the portion of street connecting WS
r - Phillips Pkwy. and Barron Cut -Off Rd.
5, Q3_'l-� Sh-wld' Ghe nt seetion,of W�iPh' lir PA;'v. [. and Baffan "t- flare to
6. C3.1-3.5 - FYI... Culvert sizing will need to be verified in'the drainage report.
7. C3.1-3.5 - Show and label the right-of-way and existing/proposed easements.
8. C3.2-3.4 - Show the sidewalk on the school property and the associated Public Access
Easement. FYI... The PAE will need to be shown on the plat or dedicated via separate
instrument.
_9...C- 3.5 - Please show the decel lane on SH 40.
10. C4.1 - Per Water Services, the 12-inch waterline along WS Phillips Pkwy. should
continue to the west (rather than turning to the north as previously discusse d be in
to the existing 12-inch stub out on the east side of Barron Rd. �,, ol°.K
11. C4.1 - Valves should be located every 800-ft. '
12. C4.1,4.5 - Please provide at least 12-inch of clearance between storm pipes/culverts
and waterlines.
13. C4.2 - Two valves should be added at the tee at Sta.263+64.71.
14. C4.3-4.6 - Install blow -offs at each dead-end line for future streets.
15. C4.1-4.6 - fore -any fire hydrants proposed? & . ,
16. C4.1-4.6 - The waterline should be at least 5.5-ft from the edge of the right-of-way or , `
PUE. FYI... Please add PUE to plat, as well, if needed. V
i i( . C4.4 - Why -is -the 8-inch waterline near SH 40 d&a eQding+ rather than looping to the 4"`
�fJ? Also, this waterline needs to be within an easement or the right-of-way. „ivy
- s that c t�JVC
19. C4.5 - Provide two valves at each tee.
20. C4.5-4.6 - Please try to keep the waterline between 4-5-ft deep.
p� (1 21. C4.6 - Add the referenced Inset "F" detail to the sheet.
here there Is less than 2-ft of
over over
torm
W' 23. RC -\The than
Class
111. utfall shoulddaylightorhbesextendedeW' please use Class IV
RCP rather than Class III.
his phase rather
than plugged.
2 C5.2-5.3 - Please match pipe soffits.
65. 5.3 - Should additional inlets be provided along WS Phillips Pkwy.? It looks li
there's only a b-ft curb inlet at the low point. „ ` E.
26. C5.3 - Why are parallel wing walls being specifi'bd fv rather than our standard? a� 3
P4Gd U e sTreet?
V 28 C5.4 - Do we want a'20'x2,' grate inlet along the side of WS Phillips? -�
A7 29. C5.4 - Should there be cement stabilized b_ackfill over the culverts, as well?
` 30. C6.`1 -Add striping on Barron Cut -Off Rd. �„ ow �i t q 1
J 31. C6.1 - Stripe WS Phillips for the west -bound left tern lade the Barron Cut -Off Rai.
intersection. / 44.
5 r,f
Reviewed by: Erika Bridges ` Date: 3/13/14fr