Loading...
HomeMy WebLinkAboutStaff Comments1101 Texas Avenue, P.O. Box 9960 1 College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 CITY OF COLLEGE STATION T_ T a - , I I November 7, 2008 TO: Mike Lane, Britt Rice Co., via fax 979-693-9785 FROM: Jason Schubert, Staff Planner SUBJECT: SOURCENET PARKING LOT EXPANSION (SP) — Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and consideration by the Business Center Advisory Board: Cover memo providing written responses to all of staffs comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Five (5) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached; One (1) revised site plan. One (1) revised site plan. Once this information is submitted and reviewed, a Business Center Advisory Board meeting will be scheduled for consideration of the project. If approved by the Board, additional copies will be requested for stamping. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact me at 979.764.3570. Attachments: Staff review comments PC: SourceNet Solutions, Inc., via fax 979-691-7766 Stewart Kling, Kling Engineering & Surveying, via fax 979-846-8252 Case file #08-00500246 STAFF REVIEW COMMENTS NO. 1 Project: SOURCENET PARKING LOT EXPANSION (SP) — 08-00500246 PLANNING 1. Provide ownership and zoning of all abutting parcels. 2. Include the vicinity map shown on the SWP3 Plan on the site plan. 3. Show all existing utility easements on site plan. 4. Portions of the proposed public sidewalk along Quality Circle are located outside the 30-foot Landscape, Access, and Underground Utility Easement (LAUE). Please revise sidewalk to be within this easement or provide easement dedication documents to dedicate additional LAUE areas to cover the sidewalk as proposed. 5. Place a note on the site plan that the proposed Protected Area is the same as on the original site plan for this property (file 02-03). 6. All parking areas are to be curbed. There is 25 feet of no curbing for the drainage outlet of the parking lot. Please provide at least an intermittent curbing or another alternative in this area. 7. Show the existing driveway and drive aisle as a fire lane. 8. The Unified Development Ordinance requires a buffer yard between single family residential and the proposed expansion of the parking lot of this office use. Please verify that the plantings required for this buffer yard already exist in the protected area or propose plantings to meet the buffer requirement. 9. The Business Center at College Station Covenants and Restrictions require that a survey be provided of all existing trees greater than 4 inch caliper as measured 12 inches above the ground. It appears that the existing trees shown on the landscape plan do not also include the existing ones being removed in the developed area. 10. The Covenants and Restrictions also require that exterior illumination details be provided that include location, manufacturer's fixture number, and supporting photometric test data. 11. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Jason Schubert Date: November 7, 2008 ENGINEERING COMMENTS NO. 1 The average C value you calculated for Post DA-II is 0.37 (Appendix 1), but it appears that the C value you used in all other tables was 0.29. How does this affect your calculations? Reviewed by: Carol Cotter Date: November 7. 2008 ELECTRICAL COMMENTS 1. All easements on site are existing. Electric facilities will be designed within existing easements. 2. Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines (where applicable, including street lights). 3. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 4. If applicable, the following easements will be required: GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: tcrabb@cstx.gov / gmartinez@cstx.gov / sweido@cstx.gov / bread@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Tim Crabb at 979.764.3439, Gilbert Martinez at 979.764.6255, Sam Weido at 979.764.6314, Brent Read at 979.764.5026. Reviewed by: Tim Crabb / Gilbert Martinez / Sam Weido / Brent Read Date: FIRE 1) No comments Reviewed by: Steve Smith Date: November 5, 2008 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: October.29,.2008 CITY OF COLLEGE STATION Plcaramg&Drod pm Sm . 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 29, 2008 TO: Mike Lane, Britt Rice Co., via fax 979.693.9785 FROM: Molly Hitchcock, AICP ��) /d�O /� �� Planning Administrator V �i �J 1 SUBJECT: SOURCENET PARKING LOT EXPANSION (SP) Please be aware that the processing of this Site Plan application is on hold until a complete Development Permit application has been submitted. cc: SourceNet Solutions, Inc., via fax 979.691.7766 / Kling Engineering & Surveying, via fax 979.846.8252 ✓ Case file #08-00500246 1101 Texas Avenue, P_O_ Box 9960 College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM November 7, 2008 TO: Mike Lane, Britt Rice Co., via fax 979-693-9785 FROM: Jason Schubert, Staff Planner SUBJECT: SOURCENET PARKING LOT EXPANSION (SP) — Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and consideration by the Business Center Advisory Board: Cover memo providing written responses to all of staffs comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Five (5) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached; V. One (1) revised site plan. One (1) revised site plan. Once this information is submitted and reviewed, a Business Center Advisory Board meeting will be scheduled for consideration of the project. If approved by the Board, additional copies will be requested for stamping. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact me at 979.764.3570. Attachments: Staff review comments PC: SourceNet Solutions, Inc., via fax 979-691-7766 Stewart Kling, Kling Engineering & Surveying, via fax 979-846-8252 Case file #08-00500246