Loading...
HomeMy WebLinkAboutStaff Comments(* F4" CITY OF COLLEGE STATION Hom ofT. A4M UahsNry' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 18, 2013 TO: Natalie Ruiz, IPS Group, via: natalie@ipsgroup.us FROM: Teresa Rogers, Staff Planner SUBJECT: Hillier Funeral Home CS (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter, Memo providing written responses to all of staffs comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment), Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set), Four (4) revised site plans; One (1) landscaping plan, One (1) 24x36 grading and erosion control plan, Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Teresa Rogers at 979.764.3570. Attachments: Staff review comments PC: Dennis Smith, Carriage Management, Inc., via: dennis.smithOcarriageservices.com Joe Schultz, P.E., Schultz Engineering, LLC; via: ioeschultz840,vedzon. net Richard Hartmann, Hartmann Architecture, Inc., via: dchard@hartmannarchitecture.com Case file no. 13-00900050 P/neeixg&Deoelapm Sml . P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 csa.gov/Aevsenrices STAFF REVIEW COMMENTS NO. 1 Project: Hillier Funeral Home Cs (SP) — 13-00900050 PLANNING 1. Cross access to French property 2. ADD JOES COMMENTS 3. Driveway location — Tx DOT permit, also construction entrance 4. Move the property line to account for the ROW dedication that occurred with the plat 5. Label the easement volume and page numbers. 6. Parking analysis... number of seats is based on seating capacity 7. Concrete structures and retaining walls over six inches in height must be treated so as to replicate stone, wood, or other alternatives approved by the Administrator. 8. 2' curb openings along sidewalk? 9. Add a note to the site plan stating dumpster screens located within utility easements will be replaced by the property owner if it becomes necessary to remove them for utility construction and/or maintenance. 10. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: March 18, 2013 LANDSCAPING/STREETSCAPING/BUFFER 1. Add a note to the landscape plan stating the minimum required points for this development is 21,000 landscape points if the property owner chooses not to provide streetscape trees 2. Check two tree types provided 3. Check irrigation systems — construction documents 4. 50% canopy trees required for 21,000 points? 5. Review low wall and flag pole on sheet L-3.0 6. Parking area screening wall — opaque? 7. Reviewed by: Teresa Rogers Date: March 18, 2013 Page 2 of 2 (*�� CITY OF COLLEGE STATION Hom ofT.A&MU.,.,y- 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 5, 2013 TO: Natalie Ruiz, IPS Group, via: natalie@ipsgroup.us FROM: Teresa Rogers, Staff Planner SUBJECT: Hillier Funeral Home CS (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $932 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan One (1) 24x36 grading and erosion control plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Dennis Smith, Carriage Management, Inc.; via: dennis.smith@carriageservices.com Joe Schultz, P.E., Schultz Engineering, LLC; via: joeschultz84@vedzon.net Richard Hartmann, Hartmann Architecture, Inc.; via: Richard@hartmannarchitecture.com Case file no. 13-00900050 STAFF REVIEW COMMENTS NO. 2 P/neeixg e4D.4.pm Sml . P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 csa.gov/Aevsenrices Project: Hillier Funeral Home CS (SP) - 13-00900050 PLANNING 1. 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: April 4, 2013 LANDSCAPING/STREETSCAPING/BUFFER 1. Revise the shrub and tree locations to account for the cross access that is provided to the French property to the south. The cross access easement should be depicted and labeled on the landscape plan. In addition, all trees and shrubs that may obstruct the access easement must be removed from this area. Page 2 of 2 (* F4" CITY OF COLLEGE STATION Home ofT. Ae4M U hlv ty- MEMORANDUM April 15, 2013 TO: Natalie Ruiz, IPS Group, via: natalie@ipsgroup.us FROM: Teresa Rogers, Staff Planner SUBJECT: Hillier Funeral Home CS (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) _ Five (5) copies of the Tx DOT decal lane Donation Agreement Request Two (2) revised site plans One (1) landscaping plan One (1) 24x36 grading and erosion control plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Dennis Smith, Carriage Management, Inc., via: dennis.smith@carriageservices.com Joe Schultz, P.E., Schultz Engineering, LLC; via: joeschultz84@vedzon.net Richard Hartmann, Hartmann Architecture, Inc., via: richard@hartmannarchitecture.com P&DS Project no. 13-00900050 PLm.ixg eb Deoelapmens Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 csa.govidevsenrices STAFF REVIEW COMMENTS NO. 2 Project: Hillier Funeral Home CS (SP) - 13-00900050 PLANNING - LANDSCAPING/STREETSCAPING/BUFFER 1. Revise the shrub and tree locations to account for the cross access that is provided to the French property to the south. The cross access easement should be depicted and labeled on the landscape plan. All trees and shrubs that are currently obstructing the access easement must be removed from this area. It appears there are a row of burford hollies and a live oak tree currently located in the cross access easement. Reviewed by: Teresa Rogers Date: April 12, 2013 ENGINEERING COMMENTS NO. 2 1. On sheet C2, there is a label for Domestic Water Service that needs to be moved. 2. Please revise the rip rap for the outfall of Pipe 11, so that it is not located on the adjacent property. 3. TxDOT permit and donation agreement will be required prior to any work being done in TxDOT ROW. 4. Please provide a NOI for the site. Reviewed by: Danielle Singh Date: April 8, 2013 TRANSPORTATION 1. A donation agreement to TxDOT will be required for the right turn deceleration lane meeting TxDOT design criteria to the proposed driveway access to the SH 6 frontage road. The driveway permit approval by TxDOT will be contingent on the donation agreement. Reviewed by: Joe Guerra, AICP, PTP Date: April 12, 2013 FIRE 1. Didn't see the comment in the notes, Knox Box will be required on this building. 2. No other comments at this time. Reviewed by: Eric Dotson Date: April 3, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, Auto CAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(c)cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. Page 2 of 3 3. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Page 3 of 3 Date: April 12, 2013 IPS Group, Planning Solutions 511 University Drive, Suite 204 College Station, Texas 77840 979.846.9259 office www.ipsqroup.us MEMORANDUM May 31, 2013 TO: Teresa Rogers, Staff Planner FROM: Natalie Ruiz, IPS Group SUBJECT: Hillier Funeral Home CS — Response to Staff Review Comments #2. As -requested, the following is being transmitted for your review and approval: _ One (1) complete set of site civil construction documents for the proposed development with the revised site, landscaping and erosion control plan attached. Please note that once you have reviewed the plans, we will provide multiple copies for stamping and distribution. I wanted to call your attention to several changes made to the site plan that were not requested by staff. After a detailed internal review and quality control, we made the following minor changes to the attached plans: vA . The drive that lines up with the main building entrance has been widened and modified to accommodate the turning radius of a limo. This resulted in the loss of 2 parking spaces. 2. A sidewalk has been added adjacent to the dumpster to allow access to the dumpster through a small gate in the enclosure so the front gates do not have to be opened except for pick up. 3. A sidewalk has been added at the rear of the building to access the fire sprinkler riser room. 4. The AC compressors have been moved onto the roof of the buildings and will be screened in accordance with the UDO as referenced in general note #14 on the site plan. j5. The electrical transformer location and public utility easement has been moved. 6. A generator with screen wall has been added and its location shown on Sheet C2. V7. Site lighting pole locations are shown on Sheets C1 and C2. Page 1 of 4 RESPONSE TO STAFF REVIEW COMMENTS NO. 2 Project: Hillier Funeral Home CS (SP)-13-00900050 PLANNING - LANDSCAPING/STREETSCAPING/BUFFER %1. Revise the shrub and tree locations to account for the cross access that is provided to the v French property to the south. The cross access easement should be depicted and labeled on the landscape plan. All trees and shrubs that are currently obstructing the access easement must be removed from this area. It appears there are a row of burford hollies and a live oak tree currently located in the cross access easement. RESPONSE: Noted on site and landscape plan. 1ENGINEERING COMMENTS NO. 2 •G 1. On sheet C2, there is a label for Domestic Water Service that needs to be moved. RESPONSE: Removed on sheet C2. �! 2. Please revise the rip rap for the outfall of Pipe 11, so that it is not located on the adjacent property. RESPONSE: Rip rap revised and noted on plan. 3. TxDOT permit and donation agreement will be required prior to any work being done in TxDOT ROW. RESPONSE. TxDOT permit and donation agreement previously submitted under separate cover. 4. Please provide a NOI for the site. RESPONSE: The NOI will be submitted once a Contractor has been selected. TRANSPORTATION 1. A donation agreement to TxDOT will be required for the right turn deceleration lane meeting TxDOT design criteria to the proposed driveway access to the SH 6 frontage road. The driveway permit approval by TxDOT will be contingent on the donation agreement. RESPONSE: TxDOT permit and donation agreement previously submitted under separate cover. FIRE 1. Didn't see the comment in the notes, Knox Box will be required on this building. RESPONSE: Knox box added and noted on sheet 1 near the main entrance and in the general notes. 2. No other comments at this time. RESPONSE. Noted. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(a)cstx.gov RESPONSE: Noted. 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. RESPONSE: Noted. 3. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. RESPONSE: Noted. Page 3 of 4 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. RESPONSE: Noted. 2. CSU will provide drawings for electrical installation. RESPONSE: Noted. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. RESPONSE. Noted. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. RESPONSE. Noted. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. RESPONSE. Noted. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. RESPONSE: Noted. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. RESPONSE. Noted. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. RESPONSE. Noted. 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. RESPONSE: Noted. Page 4 of 4 Z<' 4 �st'T CITY OF COLLEGE STATION Home of7exns AerM University" MEMORANDUM April 15, 2013 TO: -Natalie Ruiz, IPS Group; via: natalie@ipsgroup.us FROM: Teresa Rogers, Staff Planner SUBJECT: Hillier Funeral Home CS (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Seven (7) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Five (5) copies of the TxDOT decel lane Donation Agreement Request Two (2) revised site plans One (1) landscaping plan One (1) 24x36 grading and erosion control plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Dennis Smith, Carriage Management, Inc.; via: dennis.smith@carriageservices.com ✓ Joe Schultz, P.E., Schultz Engineering, LLC; via: joeschultz84@verizon.net r/ Richard Hartmann, Hartmann Architecture, Inc.; via: richard@hartmannarchitecture.coni P&DS Project no. 13-00900050 Planning & Development Sermces P.O. BOX 9960 • 1101 TEXAS AVENUE - COLLEGE S'1'AITON - TEXAS • 77842 'I'E1.. 979.764.3570 • FAX. 979.7643496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: Hillier Funeral Home CS (SP) - 13-00900050 PLANNING - LANDSCAPING/STREETSCAPING/BUFFER 1. Revise the shrub and tree locations to account for the cross access that is provided to the French property to the south. The cross access easement should be depicted and labeled on the landscape plan. All trees and shrubs that are currently obstructing the access easement must be removed from this area. It appears there are a row of burford hollies and a live oak tree currently located in the cross access easement. Reviewed by: Teresa Rogers Date: April 12, 2013 ENGINEERING COMMENTS NO. 2 1. On sheet C2, there is a label for Domestic Water Service that needs to be moved. 2. Please revise the rip rap for the outfall of Pipe 11, so that it is not located on the adjacent property. 3. TxDOT permit and donation agreement will be required prior to any work being done in TxDOT ROW. 4. Please provide a NO[ for the site. Reviewed by: Danielle Singh Date: April 8, 2013 TRANSPORTATION 1. A donation agreement to TxDOT will be required for the right turn deceleration lane meeting TxDOT design criteria to the proposed driveway access to the SH 6 frontage road. The driveway permit approval by TxDOT will be contingent on the donation agreement. Reviewed by: Joe Guerra, AICP, PTP Date: April 12, 2013 FIRE 1. Didn't seethe comment in the notes, Knox Box will be required on this building. 2. No other comments at this time. Reviewed by: Eric Dotson Date: April 3, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(a)cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. Page 2 of 3 3. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Eric Horton at 979,764.6280. Reviewed by: Eric Horton Date: April 12, 2013 Page 3 of 3 RESPONSE TO: STAFF REVIEW COMMENTS NO.1 Project: Hillier Funeral Home Cs (SP)—13-00900050 PLANNING .Cross access is needed to the French property, located south of Hillier. This will include the placement of a driveway to connect to the existing drive located on the French property. An access easement is provided to the French property and showq on the " site plan and has been added to the Final Plat CICCC�j fG1(021(Mi l {'& b&('l f1'C�IUK� V2. Label all easement volume and page numbers. Iitf a�d j7V (.CCt1Ct2 The easement volume and page numbers are not known yet. Spaces were made available so that this information can be added later. ./3. Add a note to the site plan stating dumpster screens located within utility easements will be replaced by the property owner if it becomes necessary to remove them for utility construction and/or maintenance. Note 12 was added to the Site Plan. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and 'bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Noted. LANDSCAPING/STREETSCAPING/BUFFER V1. Add a note to the landscape plan stating the minimum required points for this development is 21,000 landscape points as required by the PDD Concept Plan. Note added to the Landscape Plan. . Every project must expend a minimum of 50 percent of its point total on canopy trees. Revise the landscape plans to meet this requirement. As discussed with Teresa and noted on the PDD, a minimum of 4,250 of canopy trees is required. I-Wt, 1 'ZO " a j'owd CIO oil, �� 122041�41�( 3 Revise the shrub locations to account for the cross cess that should be provided to the Di Ijrl ijICL�, French property to the south. S.ta -o (�)'�, 6-hI ( M it (,' ('O� (�(U,Q j Modred as requeste ENGINEERING COMMENTS NO.1 1. The scales at the bottom of sheet C1 and C3 are not correct. The scales were changed on both sheets. 2. Please clarify the size of the sanitary sewer service. The plan shows 6°, but the Utility Demand note shows a 4" service. The service will be a 6" service. This was changed on the plans. 3. Please revise labels for any of the utilities proposed with the Champions Subdivision plans. To avoid confusion, the site plan should not say "proposed hydrant, "proposed manhole", etc. These labels were changed. 4. Any changes to the development permit for Champions will need to be reflected on this plan. Noted. 5. On sheet C2, note 8, the FEMA maps were effective in May of 2012 not May 2013. Note 8 was changed. 6. 1 would recommend adding a private drainage easement for the storm sewer pipe connecting from Lot 2 to Lot 1. A 15' Private Drainage Easement was added at this location. 7. If possible, it is better to route the sidewalk around sanitary sewer manholes. The sidewalk location was changed so that the manhole is no longer in the sidewalk. 8. Please move the outfall for pipe 11 to within the limits of this property. The outfall has been changed, see detail on sheet C6. 9. Please demo the existing driveway on Longmire and reconstruct the sidewalk to remove the existing curb ramps. A note was added to sheet C1 for this work. 10. The TxDOT permit has been forwarded to TxDOT. Additional documents will be required for the Donation Agreement. Noted. 11. The drainage report needs to be signed by the engineer. The drainage report has been signedand 2 copies of the signature sheet are attached. TxDOT Comments 1. The deceleration lane taper and the return radius of the access drive extend beyond the frontage of the parcel. If no redesign is made, written from each adjacent landowner concurring with this encroachment would be required. We are trying to acquire approval from the adjacent land owner. FIRE 1. No combustibles will be allowed on site until all-weather roads and fire hydrants have been accepted by the City. Noted. 2. No more than a six percent (6%) grade is allowed on any length of fire lanes. Noted. All grades less than 6%. 3. Fire lanes will be constructed using the "Fire Apparatus Turning Radius Template" and have a fire lane sign at the entrance. Curbs to be marked "Fire lane, No Parking, Tow Away Zone" with a minimum of four (4") letters. Noted. The fire lane turning radii were checked. 4. A "Knox Box' security key system is required on all buildings and a Knox Switch is required on all gated entrances. Noted. 5. Commercial construction requires a fire hydrant within three hundred feet (300') from the main entrance and within four hundred and fifty feet (450) from any part of a structure. Noted. The layout of the fire hydrants complies with these dimensions. 6. F.D.C. locations will be within one hundred and fifty feet (150') of a fire hydrant and located on the "road side" of a structure. The FDC is located within 150 feet of a fire hydrant and it is facing a fire lane. SANITATION V 1. Sanitation is ok with this project. Noted. V a CITY OF COI.LF3G:? STATION Home of Texas AdM University` MEMORANDUM March 20, 2013 TO: Natalie Ruiz, IPS Group; via: natalie@ipsgroup.us FROM: Teresa Rogers, Staff Planner SUBJECT: Hillier Funeral Home CS (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staffs comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); One (1) complete set of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set); Four (4) revised site plans; One (1) landscaping plan; Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Teresa Rogers at 979.764.3570. Attachments: Staff review comments / PC: Dennis Smith, Carriage Management, Inc.; via: dennis.smith@carriageservices. m" Joe Schultz, P.E., Schultz Engineering, LLC; via: joeschultz84@verizon.net // Richard Hartmann, Hartmann Architecture, Inc.; via: richard@hartmannarchitecture.com'`� Case file no. 13-00900050 Planning er Develapment Services P.O. BOX 9960 • I101 TTXAS AY"ENU6 • COLLEGE STATION • Tr,XAS -'"842 17;L. y79.'643;i70 • PAX. 979.764.349E cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Hillier Funeral Home Cs (SP) — 13-00900050 PLANNING 1. Cross access is needed to the French property, located south of Hillier. This will include the placement of a driveway to connect to the existing drive located on the French property. 2. Label all easement volume and page numbers. 3. Add a note to the site plan stating dumpster screens located within utility easements will be replaced by the property owner if it becomes necessary to remove them for utility construction and/or maintenance. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Teresa Rogers Date: March 19, 2013 LANDSCAPING/STREETSCAPING/BUFFER 1. Add a note to the landscape plan stating the minimum required points for this development is 21,000 landscape points as required by the PDD Concept Plan. 2. Every project must expend a minimum of 50 percent of its point total on canopy trees. Revise the landscape plans to meet this requirement. 3. Revise the shrub locations to account for the cross access that should be provided to the French property to the south. Reviewed by: Teresa Rogers ENGINEERING COMMENTS NO. 1 Date: March 19, 2013 1. The scales at the bottom of sheet C1 and C3 are not correct. 2. Please clarify the size of the sanitary sewer service. The plan shows 6", but the Utility Demand note shows a 4" service. 3. Please revise labels for any of the utilities proposed with the Champions Subdivision plans. To avoid confusion, the site plan should not say "proposed hydrant', "proposed manhole", etc. 4. Any changes to the development permit for Champions will need to be reflected on this plan. 5. On sheet C2, note 8, the FEMA maps were effective in May of 2012 not May 2013. 6. 1 would recommend adding a private drainage easement for the storm sewer pipe connecting from Lot 2 to Lot 1. 7. If possible, it is better to route the sidewalk around sanitary sewer manholes. 8. Please move the outfall for pipe 11 to within the limits of this property. 9. Please demo the existing driveway on Longmire and reconstruct the sidewalk to remove the existing curb ramps. 10. The TxDOT permit has been forwarded to TxDOT. Additional documents will be required for the Donation Agreement. 11. The drainage report needs to be signed by the engineer. Reviewed by: Danielle Singh Date: March 18, 2013 TxDOT Comments 1. The deceleration lane taper and the return radius of the access drive extend beyond the frontage of the parcel. If no redesign is made, written from each adjacent landowner concurring with this encroachment would be required. Reviewed by: Chad Bohne Date: March 6, 2013 FIRE 1. No combustibles will be allowed on site until all-weather roads and fire hydrants have been accepted by the City. 2. No more than a six percent (6%) grade is allowed on any length of fire lanes. 3. Fire lanes will be constructed using the "Fire Apparatus Turning Radius Template" and have a fire lane sign at the entrance. Curbs to be marked "Fire lane, No Parking, Tow Away Zone" with a minimum of four (4") letters. 4. A "Knox Box" security key system is required on all buildings and a Knox Switch is required on all gated entrances. 5. Commercial construction requires a fire hydrant within three hundred feet (300) from the main entrance and within four hundred and fifty feet (450') from any part of a structure. 6. F.D.C. locations will be within one hundred and fifty feet (150') of a fire hydrant and located on the "road side' of a structure. Reviewed by: Eric Dotson Date: March 8, 2013 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: March 6, 2013 w CITY OF COLLEGE STATION Home of7ew A&M University" March 1, 2013 f� TO: Natalie Ruiz, IPS Group; via: Natalie@ipsgroup.us Vkhil FROM: Jason Schubert, AICP Principal Planner SUBJECT: HILLIER FUNERAL HOME CS (SP) Thank you for the submittal of your SITE PLAN — COMMERCIAL and NON-RESIDENTIAL ARCHITECTURE STANDARDS application. This project will be distributed to staff next week for their review. cc: Dennis Smith, Carriage Management, Inc.; via: den nis.smith carria eservices.c m Joe Schultz, P.E., Schultz Engineering, LLC; via: joeschultz84(0)_verizon.net Richard Hartmann, Hartmann Architecture, Inc.; via: Richard@hartmannarchitecture.comil/ Case file no. 13-00900050 (SP) Case file no. 13-00900051 (NRA) Planning & Developme a Services P.O. BOX 9960 • 1101 TE4kS AVENUE • COLLEGE S MION • TEXAS • �7&12 TEL 9 7 9.764.3570 - FA%. 979.76434()6 cstx.govldevservices