Loading...
HomeMy WebLinkAboutLetter to Staffll9j llJW(p' 11/t#'(i{ /,'.LJ4 KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 S. Texas Avenue, Suit e A Bryan, Texas 77802 S.M. Kling, R.P.L.S. Telephone 979/846-6212 Fax 979/846-8252 B.J. Kling, P.E., R.P.L.S. - Inactive Post Office Box 4234 w_ Bryan, Texas 77805 ~ QO Memo: November 11 , 2008 To: City of College Station -Development Services c/o Carol Cotter,~.E. From: Fred Paine, P.E. Re: SourceNet Parki ot ddition Lot 2-B, Block 1, The Business Center at College Station Phase 1 Drainage Report Revisions Dear Carol, The following is a list of revisions to the originally submitted drainage report. 1. Page 3: Revised Table 1 -DA-II-Post to correct C-Value and runoff rates (Q) 2. Page 3: Revised first sentence after Table 1 -maximum increase in runoff is approximately 12 cfs at the 100 year event. 3. Page 3: Revised Table 2 -Total peak runoff rates to incorporate DA-II post corrections 4 . Page 4: Revised Table 3 -Entire table to incorporate DA-II post corrections 5. Appendix 1: Revised "Peak Flow Calculations" -DA-II to correct C-Value and runoff rates (Q) 6. Appendix 1: Revised "Total Flow Contributing to Tributary to AC-1 ",Sections 1-5, Total peak runoff rates to incorporate DA-II post corrections 7. Appendix 2: Revised Manning's Open Channel Flow analysis of Ditch Sections 1-5 to reflect corrected , post developed, peak flow rates. Added new 100 yr-post print outs. 8. Appendix 2: Revised Manning's Open Channel Flow analysis of Ditch Section 2 - revised left bank station (shift 16' inward). 9. Appendix 2: Revised Manning's Open Channel Flow analysis of Ditch Section 5 - revised left bank station (shift 1 O' inward) 10. Appendix 2 : Revised post developed HEC-2 model to incorporate DA-II post corrections. Added new summary results print out.